Loading...
HomeMy WebLinkAbout0154772-Building (windows) � CITY OF OSHKOSH No 154772 OSHKOSH BUILDING PERMIT-APPLICATION AND RECORD ON THE WATER Job Address 2025 NEBRASKA ST __ Owner RIDGEVIEW INVESTMENTS LLC Create Date 03/19/2013 Designer Contractor DEL TRITT CONSTRUCTION LLC Inspector Nicole Krahn Category 040-Windows __ Plan : Type � Building � Sign � Canopy � Fence � Raze Zoning R-2 Class of Const: Size Unfinished/Basement Sq.Ft. Rooms Height _ Ft. � Projection Finished/Livin9 Sq.Ft. Bedrooms Stories _ _ Canopies Garage Sq.Ft. Baths _ _ Signs Foundation � Poured Concrete � Floating Slab 0 Pier � Other � Concrete Block 0 Post � Treated Wood — Occupancy Permit Not Required Occupancy Fee $0.00 Flood Plain Height Permit Park Dedication #Dwelling Units 0 #Structures 0 Use/Nature !SFR/Replacing 9 windows(same size and location). — -- of Work I III I � I ' : HVAC Contractor __ Plumbing Contractor Electric Contractor Fees: Valuation $8,000.00 Plan Approval $0.00 Permit Fee Paid $86.00 Park Dedication $0.00 Issued By: Date 03/20/2013 Final/O.P. 00/00/0000 ❑ Permit Voided Parcel Id# 1401290100 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party,if you perform the work descnbed in this permit application within an easement,the City strongly urges the permit applicant to contact the easement holder(s)and to e any necessary approvals before starting such activity. I have read an und sta ' ed in rmation. Signature Date � ��Q— ��j AgenUOwner Address 6228 COUNTY RD N PICKETT WI 54964 - 9533 Telephone Number 589-4209 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number,Type of Inspection(i.e. Footing, Service, Final,etc.),Access into Building if Secure(how do we gain entry),your Name and Phone Number. Unless specified otherwise,we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.