Loading...
HomeMy WebLinkAbout0108558-Building (det. garage) � CITY OF OSHKOSH scq,�,y,�No �oasss ; �; �`� OSHKOSH BUILDING PERMIT -APPLICATION AND RECO 61o�s v ON THE WATER '9TE Job Address 3709 3711 PARKVIEW CT Owner RONALD L MCBRAIR Create Date 06/08/2004 Designer Contractor OWNER Category 150-New Accessory Buildings-Garages(Residential) Plan Type � Building � Sign � Canopy _ � Fence � Raze j Zoning Class of Const: Size : Unfinished/Basement 0 Sq.Ft. Rooms ____ 0 Height 0 Ft. ❑ Projecti°n I Finished/Living 0 Sq.Ft. Bedrooms 0 Stories Canopies 0 Garage 0 Sq.Ft. Baths 0 Signs 0 Foundation � Poured Concrete � Floating Slab � Pier � Other � Concrete Block 0 Post � Treated Wood -- - - Occupancy Permit Flood Plain Height Permit Park Dedication #Dwelling Units 0 #Structures 0 Use/Nature IDuplex/ Constructing a 24'x 33'detached garage in the rear yard. of Work i I L_ � HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $13,000.00 Plan Approval $0.00 Permit Fee Paid $89.00 Park Dedication $0.00 Issued By: Date 06/08/2004 Final/O.P. 00/00/0000 � Permit Voided j Parcel Id# 1533030000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party,if you perform the work described in this permit application within an easement,the City strongly urges the permit applicant to contact the easement holder(s)and to sec e any ne ssa rovals before starting such activity. � 0 Signature X �� �� Date � � � cx AgenUOwner Address 3709 PARKVIEW CT OSHKOSH WI 54901 - 8102 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number,Type of Inspection (i.e. Footing,Service, Final,etc.),Access into Building if Secure(how do we gain entry),your Name and Phone Number. Unless specified otherwise,we will assume the project is ready at the time the request is received. Work may . continue if the inspection is not performed within two business days from the time the project is ready.