HomeMy WebLinkAbout0154700-Building
No154700
CITY OF OSHKOSH
OSHKOSHBUILDING PERMIT - APPLICATION AND RECORD
ON THE WATER
CYPRESS HOMES INC
Job Address15 ALLEN AVEOwnerCreate Date03/06/2013
DesignerContractorCYPRESS HOMES
InspectorJohn Zarate
Category110 - New Single FamilyPlanUDC-3716-0313
TypeBuildingSignCanopyFenceRaze
R-1
ZoningClass of Const:8SizeIrrg
Sq. Ft.Projection
Unfinished/Basement1280Rooms6Height19Ft.
Finished/Living
1280Sq. Ft.Bedrooms3Stories1Canopies
Garage484Sq. Ft.Baths2Signs
Poured ConcreteFloating SlabPierOther
Foundation
Concrete BlockPostTreated Wood
Occupancy PermitRequiredOccupancy Fee$0.00Flood PlainHeight Permit
Park DedicationRequired# Dwelling Units1# Structures1
Use/Nature NSFR/ New single family* 1 story with 2 car attached garage and driveway. No Deck or Patio. Seperate permit required prior to construction of
of Worka deck or patio. **check #17422
HVAC ContractorBAY AREA SERVICES INCPlumbing ContractorSBS PLUMBING LLC
Electric ContractorSCHMIDT ELECTRIC
Fees: Valuation$116,846.00Plan Approval$75.00Permit Fee Paid$622.92Park Dedication$200.00
03/12/201300/00/0000
Issued By:DateFinal/O.P.
Permit Voided
Parcel Id #
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
I have read and understand the afore mentioned information.
SignatureDate
Agent/Owner
1500 W COLLEGE AVEAPPLETONWI549143041707-2002
Address-Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.