Loading...
HomeMy WebLinkAbout0154700-Building No154700 CITY OF OSHKOSH OSHKOSHBUILDING PERMIT - APPLICATION AND RECORD ON THE WATER CYPRESS HOMES INC Job Address15 ALLEN AVEOwnerCreate Date03/06/2013 DesignerContractorCYPRESS HOMES InspectorJohn Zarate Category110 - New Single FamilyPlanUDC-3716-0313 TypeBuildingSignCanopyFenceRaze R-1 ZoningClass of Const:8SizeIrrg Sq. Ft.Projection Unfinished/Basement1280Rooms6Height19Ft. Finished/Living 1280Sq. Ft.Bedrooms3Stories1Canopies Garage484Sq. Ft.Baths2Signs Poured ConcreteFloating SlabPierOther Foundation Concrete BlockPostTreated Wood Occupancy PermitRequiredOccupancy Fee$0.00Flood PlainHeight Permit Park DedicationRequired# Dwelling Units1# Structures1 Use/Nature NSFR/ New single family* 1 story with 2 car attached garage and driveway. No Deck or Patio. Seperate permit required prior to construction of of Worka deck or patio. **check #17422 HVAC ContractorBAY AREA SERVICES INCPlumbing ContractorSBS PLUMBING LLC Electric ContractorSCHMIDT ELECTRIC Fees: Valuation$116,846.00Plan Approval$75.00Permit Fee Paid$622.92Park Dedication$200.00 03/12/201300/00/0000 Issued By:DateFinal/O.P. Permit Voided Parcel Id # In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. I have read and understand the afore mentioned information. SignatureDate Agent/Owner 1500 W COLLEGE AVEAPPLETONWI549143041707-2002 Address-Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.