HomeMy WebLinkAbout0154686-Plumbing (laterals)
CITY OF OSHKOSH
154686
No
OSHKOSHPLUMBING PERMIT - APPLICATION AND RECORD
ON THE WATER
Job Address15 ALLEN AVEOwnerCYPRESS HOMES INC Create Date03/11/2013
ContractorZILLGES EXCAVATINGCategoryPlan
401 - Residential-Exterior (laterals)
InspectorJerry Fabisch
Clothes Wshr
Bathtub00Classrm Sink0Surgeons Sink0Roof Drain0Deduct Meters0
Shower0Lndry Tray0Exam Sink0Sterilizer0Soda Disp0Wtr Sewer Mtrs0
Whirlpool
0Sump Pump0F Prep Sink0RPZ Valve0Coffee Maker0Wtr Usage Mtrs0
Misc.
Flr/Wst Sink
Lavatory0San Sump/Pump00Bidet0Site Drain00
Fixtures
ToiletWater Softner
00Hand Sink0Urinal0Wait. St.0
Kit Sink0Standp Rec0
Ice Chest
Lab Sink0Beer Tap00
Disposal0Gar Drain0Plaster Sink0Dip Well0Comm Ice Maker0
DishwasherDrink Ftn
0Local Waste0Sculry Sink00Int Grease Trap0
Floor DrainBar SinkServ SinkWash Ftn
0000Ext Grease Trap0
Hose Bibb0Breakrm Sink0Shamp Sink0Catch Basin0Eye Wash Statn0
Water Heater0
Use/Nature NSFR/ installing new water and sanitary laterals for new house
of Work
SizeMaterialType#Conn. Type
Sanitary Sewer4"PlasticLateral1New
Storm Sewer
Water Service1" / 1-1/4"CopperLateral1New
Parcel Id #
$0.00Permit Voided
Valuation$1,500.00Plan ApprovalPermit Fees$100.00
Issued ByDate03/11/2013
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Date
Signature
Agent/Owner
Address1800 FOUNTAIN AVEOSHKOSHWI54904-1045Telephone Number231-1994
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.