Loading...
HomeMy WebLinkAbout0082651-Building (roof & siding)OSHKOSH ON THE WATER Job Address 2435 PARKSIDE DR Designer CITY OF OSHKOSH No 0082651 BUILDING PERMIT -APPLICATION AND RECORD Owner JUDITH M THORPE Contractor J P GOHEEN CARPENTRY Create Date 11/03/2000 Category 141 - Exterior Remodeling Plan Type 0 Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished /Basement Sq. Ft. Rooms Height Ft. ❑ Projection Finished /Living Sq. Ft. Bedrooms Stories Canopies Garage Sq. Ft. Baths Signs Foundation Poured Concrete 0 Floating Slab 0 Pier 0 Other Concrete Block 0 Post 0 Treated Wood Occupancy Permit Not Required Park Dedication Use /Nature of Work Flood Plain # Dwelling Units 0 3FR/Tear off and replace existing roofing on house & garage due to hail damage & garage and replace with new vinyl.` Electric not applicable (NO STRUCTURAL Height Permit # Structures 0 vinyl siding on house HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $9,571.00 Plan Approval $0.00 Permit Fee Paid $65.00 Park Dedication Issued By: Date 11/03/2000 Final /O.P. ❑ Permit Voided In the performance of this work I Signature -,` c Address 123�FFERSON ST rm all work pursuant to rules governing the described construction. Agent/Owner OSHKOSH WI 54901 - 0000 Date Telephone Number 233 -9703 $0.00 Check all applicable boxes and fill out as much information as possible. Thank you. 1 Address of Property i 2 The Property is owned by 3 1 am the ❑ Owner OR I am the Wcontractor 4 The contractor doing the work is -/, /'- - .- � v/ 5 This is a C)iSingle Family Residence, ❑Rental, ❑Commercial 6 Work being done: �'j�/!� �_� ,� i ✓� �.%: RO ING Tear off and replace existing roofing on Mhouse, mrgarage ❑ Replace wood decking ❑ Add 1 layer of roofing to the existing /1/C-1 layer(s) on ❑ house, ❑ garage This work is being done due to Hail Damage ❑ Other SIDING ❑ Install siding on Ig house, P{garage Replacing vinyl with vinyl /❑� Replacing steel or aluminum with vinyl (circle steel or aluminum) ❑ Replacing ,,✓/ y'�-- with i -- - This work is being done due to'�KHail Damage ❑ Other When siding is done, one of the boxes below must be checked: ❑ Electric - Electric Meter, receptacle, lighting and Electric Service entrance alterations /modifications are being performed by Electric Installation Verification form is attached ame o icense ectnc ontractor) Electric - not applicable ❑ Install new or ❑ Replace gutters ❑ Install new or ❑ Replace downspouts ❑ Other work being done: (please note) Value of the job $ 26- 71 (include fair market price for labor even if you are not paying for labor) "