HomeMy WebLinkAboutAECOM/PW CNT 13-01 AECOMAECOM 608 836 9800 tel 1350 Deming Way 608 836 9767 fax Suite 100 Middleton,WI 53562 www.aecom.com Memorandum To James Rabe Page 1 cc Request for Project Budget Amendment: City Hall Parking Lot Design AECOM Project#: 60275586 Subject City Resolution# 12-395; Contract 13-01 From Jim Bachhuber, Project Manager Date February 4, 2013 This memo requests an amendment to the above referenced agreement. The amendment is necessary to cover the costs of the out of scope work conducted on the project under the City's direction. As you know, we kept a running list of the out of scope work and costs so that we could reduce the administrative time and effort and process a single amendment, rather than multiple amendments. Below is a description of each out of scope item along with an amendment request amount. Survey Tasks 1. Benchmark&Datum Verification: The City of Oshkosh provided to AECOM several elevation benchmarks along Jackson Street and in the area around the City Hall and Police Department buildings. These benchmarks had apparently been surveyed at different times by City employees over the years and there were some questions about the origins of the benchmarks and what datums they may have been referenced to. AECOM was asked to run a closed level loop through the benchmarks in order to tie them together in one survey. The leveling data was evaluated and a set of benchmarks was chosen for the Jackson Street survey with input from City Engineering. This task was not included in the original survey scope or cost estimate. Costs: $1,291.00 2. Update and match the City Hall and Police Department survey elevations to corrected datum: For design of the proposed facilities it was necessary to merge the Jackson Street survey with the previously completed survey of the City Hall and Police Department properties. The benchmarks and datum chosen for the Jackson Street survey as described above did not match those that were used for the City Hall and Police Department properties. In order to merge the surveys it was necessary that the elevation datums of the two surveys matched. As a result several components of the City Hall and Police Department survey needed to be revised or updated including: recalculating leveling notes, adjustment of the original survey data, updated ground contours, City Hall Parking Lot Amendmnt#1 memo(2).doCX A=COM updated manhole elevations on the drawing, updated manhole data sheets with new rim and pipe elevations. This task was not included in the original survey scope or cost estimate. Cost: $1,761.00 3. Certified Survey Map combining the City Hall &Oshkosh Police Department properties: A Certified Survey Map was needed to combine the City Hall and Police Department properties into one single property. This was done in order to remove setback requirements that impeded design and placement of the proposed facilities. This task was not included in the original survey scope or cost estimate. Cost: $5,053.00 4. WPS utility easements shown on the Certified Survey Map: WPS required two new easements within the combined City Hall and Police Department properties. Details showing the easement locations were added to the Certified Survey Map. Additional easements were not included in the original survey scope or cost estimate given to the City for preparation of the Certified Survey Map. Cost: $390.00 5. Survey of geotechnical boring locations: Additional field survey time was needed to locate and survey 5 soil borings in the project area. This work was requested after the survey crew had completed their work in those areas. Boring locations were not included in the original survey scope or cost estimate. Cost: $536.00 Plans and Specifications Tasks 1. Electrical Plans Preparation AECOM conducted effort on the plan preparation which was not included in the original contract scope of work. Specifically, AECOM received a CAD file from the City with the electrical components. AECOM: a Met with City Staff to discuss the electrical aspects of the project and how they relate to the remaining portions of the project. Reviewed the project phasing and scope of work to determine the electrical needs at the project site. b Expanded the electrical plan sheet to four sheets to enhance the readability of the plans. c Edited CAD file including, line weights, text fonts, label locations, and other aspects to enhance the readability. d Moved and removed features that were in error and added missing features. e Matched/corrected light pole products with a table on the plan sheet. City Hall Parking Lot Amendmnt#1 memo(2).docX 2 AECOM f Conducted engineering design and added details for the light pole bases that were located over the underground detention structure. g Added design for a concrete protection cap around the communication conduit between City Hall and the Oshkosh Police Department buildings. h Added plan sheets displaying electrical quantities. Cost $7,344.00 2. Electrical Specifications AECOM met with City staff to discuss and develop the electrical specifications for the project. Technical information, editing, cross-referencing, and formatting was conducted by AECOM. AECOM also added language relevant to the security fence controls and electronics and added product sheets. AECOM provided language for the measurements and payments relating to the electrical bid items that are included in the project. AECOM updated concrete and concrete re-bar specifications to include specifications for light pole bases and other electrical aspects. Cost $4,501.00 Summary The total amendment request is provided below: Task Costs Survey Benchmark& Datum Located and Verification $ 1,291.00 CSM Survey(City Hall &OPD parcel merge) $5,053.00 Add WPS easement to CSM $ 390.00 Survey of boring locations $ 536.00 Update and match elevations to corrected datum $ 1,761.00 Plans&Specs Electrical Plans $ 7,344.00 Electrical Specifications $4,501.00 Total Amendment Request $20,876.00 City Hall Parking Lot Amendmnt#1 memo(2).doCX 3 A=COM AECOM 1350 Deming Way#100; Middleton,WI 53562 T 608.836.9800 F 608.836.9767 Amendment to Agreement Form Amendment No. 1 City Hall Parking Lot Contract 13- 01 AECOM Project No. 60275586 City Resolution No.: 12-395 RETURN TO: AECOM Date: February 4, 2013 1350 Deming Way# 100 Middleton, WI 53562 Attention: Jim Bachhuber SUMMARY: Original Contract Amount: $250,682.00 Total Previous Change Orders: $ 0.00 Amount this Change Order: $ 20,876.00 Revised Contract Amount $271,558.00 Amendment# DESCRIPTION AMOUNT 1 See Attached AECOM Memo dated February 4, 2013 Benchmark& Datum Located and Verification $ 1,291.00 CSM Survey(City Hall &OPD parcel merge) $ 5,053.00 Add WPS easement to CSM $ 390.00 Survey of boring locations $ 536.00 Update and match elevations to corrected datum $ 1,761.00 Electrical Plans $ 7,344.00 Electrical Specifications $4,501.00 AEC City of Oshkosh By: By trick Clifford Title: District Manager Title: Date: 0— Date: AECOM AECOM 920.235.0270 tel 558 North Main Street 920.235.0321 fax Oshkosh,Wisconsin 54901 Authorization February 4, 2013 I hereby certify that the necessary provisions have been made to pay the liability which will accrue under this contract. I hereby authorize AECOM to proceed with the scope of work for the Additional Services related to the City Hall Parking Lot Project in Oshkosh, Wisconsin as described in AECOM's Amendment 1 to the Agreement dated August 16, 2012, with a revised budget authorization of$271,558.00 under the general terms and conditions specified in the proposal. /ce---. / --it/l- 2--13-20/- Signature Date Mark A Rohloff Print Name City Manager -Title Mr.. ization Wit _ , 1_ � l4, 1 - ( I� Signature 0 Date Pamela R. Ubrig; Print Name City Clerk Title/0 •anization e)13 �• . - Date Lynn A. orenson; Print Name City Attorney Ti anization tl n \-12-NO^Ael")9 M t_.-/- /1 //j Signature Date Peggy A. Steeno Print Name Director of Finance Title/Organization To enhance and sustain the world's built,natural and social environments This fax is a confidential communication intended for the individual or entity named above. If the reader of this message is not the intended recipient,please delete and note that dissemination,distribution,or copying of this communication is prohibited. Thank You. AECOM 2 I agree to accept invoices from AECOM via e-mail and not postal mail: El Yes Signature: E-mail address: Recipient Mr./Ms: Return to: Name: Jim Bachhuber 1350 Deming Way # 100 Address: Middleton,WI 53562 Fax: 608 836 9767 Phone: 608 828 8121 To enhance and sustain the world's built,natural and social environments This fax is a confidential communication intended for the individual or entity named above. If the reader of this message is not the intended recipient,please delete and note that dissemination,distribution,or copying of this communication is prohibited. Thank You.