Loading...
HomeMy WebLinkAbout044123 - Building (fence) VS/ CITY OF OSHKOSH N9 44123 PERMIT - APPLICATION AND RECORD (F TYPE: BLDG I►_;, HTG ❑ ELEC ❑ PLBG ❑ SIGN ❑ ZONING FLOOD PLAIN HEIGHT ADDRESS 1 1-39 I v IT `/E 3 JDt PLAN NO. OWNER .■ \)1" ,.) - --": A- DESIGNER USE/NATURE OF WORK � 5 t tb C kAt- c.,i r- Cam, Z ?-C.Jet —t.:3 3r n i""c-r , BUILDING CONTRACTOR Q ` Size Sq. Ft. # Rooms # Stories Height Foundation Class of Const. Occupancy Permit HEATING CONTRACTOR Heat ❑ A/C ❑ Vent ❑ Fuel/System Heat Loss BTU'S ELECTRIC CONTRACTOR Electric Serv. New ❑ Change ❑ Temp ❑ Type Volts Amps Fixtures Switches Receptacles Circuits PLUMBING CONTRACTOR BT _WH Disp WSoft —CBasin _Lay _Sh DW —DF —San. Sewer _WC _FDr SP —Ur —Storm Sewer _Sink —LTub Eject —SS —Water Other c''-- ��' •�•+ FEES: Valua' �- Permit Fee Paid $ ��� Park Dedication $ ISSUED BYt� � Date 'i i 7 # Final/O.P. In the performance of thi. •rk I agree to perform all rk pursuant to rules governing the described construction. SIGNATURE _ —2-27 -- / '14e. J O" 9S GENT/OWNER DATE -"ADDRESS TELEPHONE# ZONING/LAND USE COMPLIANCE CHECKLIST 1 �,� l + I,/ N'c� ZONING JOB LOCATION: P PROPERTY OWNER/CONTRACTOR: cc/EVe AA]1 • E CONSTRUCTION DATA: New Construction Addition Alteration TYPE OF CONSTRUCTION: (i.e. fence, pool, parking lot, sign, etc.) t-i/6/tf Cyctotue COMPLIANCE CHECKLIST DEFICIENT COMMENTS Use Lot Width Lot Area Lot Area Per Family Floodplain Front Yard Front Yard Side Street Rear Yard Side Yards Building Area Parking Standards Off-Street Loading Standards Vision Clearance Transitional Yard Standards Landscape Standards Height Conditions of Approval Compliance with P.C. or BZA Conditions of Approval Signage Standards Drainage Plan REVIEW AUTHORITY As per Section 30-5 Enforcement of the City Zoning Ordinance, the Director of Community Development, c designee, must approval all plans, except the following: (1) Alterations or interior work when the use is conforming and when no change in use is proposed. (2) Maintenance items, e.g. siding, windows, etc., when the use is conforming and when no change is proposed. (-APPROVED DENIED Plan Commission Action Required Variance(s) Required qq REVIEWED BY: � L DATE: J� Z /� 'l�