HomeMy WebLinkAbout18. 13-85
FEBRUARY 26, 2013 13-85 RESOLUTION
(CARRIED___7-0____LOST________LAID OVER________WITHDRAWN________)
PURPOSE: APPROVAL OF CHANGE ORDER NO. 3 FOR PUBLIC WORKS
CONTRACT 12-07 WITH VINTON CONSTRUCTION CO. FOR
VARIOUS CONCRETE PAVING & UTILITY PROJECTS – NORTH
SIDE AREA (+$37,952.38)
INITIATED BY: DEPARTMENT OF PUBLIC WORKS
BE IT RESOLVED by the Common Council of the City of Oshkosh that the following
Change Order, a copy of which is attached, is hereby approved:
VINTON CONSTRUCTION CO.
PO Box 1987
Manitowoc, WI 54221
Net Increase to contract: $37,952.38
PURPOSE: See attached Change Order.
BE IT FURTHER RESOLVED that money for this purpose is hereby appropriated
from:
Acct. No. 311-0410-7480-00000 Sidewalk Construction Fund
315-0410-7480-00000 Street Improvement Fund Expenditures
317-0410-7480-03301 Special Assessments Fund – Streets
317-0410-7480-03302 Special Assessments Fund – Sewer
317-0410-7480-03303 Special Assessments Fund – Water
317-0410-7480-03304 Special Assessments Fund – Sidewalks
317-0410-7480-03305 Special Assessments Fund – Storm Water
541-1810-1799-00000 Water Utility Construction Work in Progress
551-1910-1799-00000 Sewer Utility Construction Work in Progress
561-2010-1799-00000 Storm Water Utility Construction Work in Progress
(0
f HKOf H
ON THE WATER
MEMORANDUM
TO: Honorable Mayor and Members of the Common Council
FROM: Steven M. Gohde, Assistant Director of Public Works -! '' 5
DATE: February 21, 2013
RE: Change Order No. 3 for Public Works Contract No. 12 -07
Various Concrete Paving & Utility Projects — North Side
Vinton Construction Company ( +$37,952.38)
BACKGROUND
Change Order No. 3 for Contract 12 -07 is scheduled for consideration by the Common Council at the February 26,
2013 meeting. The contract was originally awarded to Vinton Construction Company in April of 2012. This change
order is for additional services provided and for adjusting all quantities to match actual quantities installed. This is a
final change order.
ANALYSIS
A portion of the additional work includes the addition of storm sewer and concrete pavement repair at Sullivan Street
and Skyview Avenue to this contract and the application of a credit owed to the City for the use of salvaged, crushed
concrete base course supplied by the City. Following is a summary of the changes to each section of the CIP:
• Paving — Majority of the increase is related to concrete patching at the intersection of Sullivan Street and
Skyview Avenue.
• Storm Sewer — Additional work to match field conditions.
• Sanitary Sewer — Additional work to match field conditions.
• Water Main — Additional pipe and fittings needed to tie into existing water main. Additional cost to remove
additional footage of abandoned water main.
FISCAL IMPACT
Contract Section
Change Order Amount
New Contract Total
CIP Budget Amount
Concrete Paving
$15,953.95
$1,723,006.80
$2,204,834.00
Storm Sewer
- $11,230.57
$1,399,272.86
$1,659,000.00
Sanitary Sewer
$11,931.05
$766,245.31
$1,040,300.00
Water Main
$22,418.95
$1,116,852.43
$1,606,900.00
Traffic
- $1,121.00
$30,304.00
$41,700.00
Total
$37,952.38
$5,035,681.40
Alternate B (credit)
- $45,500.00
$4,990,181.40
$6,552,734.00
Adequate funds are available in the relating sections of the 2012 Capital Improvement Budget.
RECOMMENDATIONS
I recommend approval of Change Order No. 2 to Contact No. 12 -07 in the amount of +$37,952.38 to Vinton
Construction Company.
Approved:
Mark A. ohloff
City Manager
SMG /tlt
I \Engineering \12 -07 Conc Paving & Util- North\ Project_ Information \CorrespondencelMemo \12 -07 Memo for CO #32-21-13 docx
TO: Vinton Construction Co.
2705 N Rapids Road
PO Box 1987
Manitowoc, WI 54221 -1987
CHANGE ORDER # 3
DATED: February 4, 2013
FINAL
Your present contract with the City of Oshkosh, Contract No.12 -07, awarded April 10, 2012, Is hereby
amended and changed as follows:
NET INCREASE TO:
NET DECREASE TO:
NET INCREASE TO:
NET INCREASE TO:
NET DECREASE TO:
SECTION I - PAVING
SECTION 11- STORM SEWER
SECTION III - SANITARY SEWER
SECTION IV - WATER MAIN
SECTION V - ELECTRICAL
NET INCREASE TO CONTRACT
$15,953.95
($11,230.57)
$11,931.05
$22,418.95
($1,121.00)
$37,952.38
Recommended:
Director of Public Works
CITY OF OSHKOSH
BY:
City Manager
City Clerk
Approved and accepted:
} Intractor
I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin,
under the within Change Order.
Approved as to form:
City Attorney
Comptroller
Section I
Section II
Section III
Section IV
Section V
(Paving)
(Storm)
(Sanitary)
(Water)
(Electrical)
Totals
Bid Total
$1,684,831.85
$1,405,542.50
$701,529,00
$1,083,083.50
$31,425.00
$4,907,411.85
C,O. #1
$0.00
$3,000.93
$17,277.26
$6,933.98
$O,OD
$27,292.17
Prev.Contract Total
$1,684,831.85
$1,409,543.43
$718,806.26
$1,090,017.48
$31,425,OD
$4,934.624.fl2
C.O. #2
$22,221,00
$960.00
$35,508.00
$4,416.00
$0,00
$63,105.00
Prev,ContractTotal
$1,707,052.85
$1,470,503.43
$754,314.26
$1,094,433.46
$31,425.00
$4,997,729,02
Alternate B (credit)
($45,500.00)
$0,00
$0.00
$O.00
, $0.00
($45,500.00)
C.O. #3
$15,953.95
($11,230.57)
$11,931.05
$22,418.95
($1,721.00)
$37,952.36
Contract Total
$1,677,506.80
$1, 399 ,272.88
$766,245.31
$1,116,852.43
$30,304.00
$4,990,181.40
Recommended:
Director of Public Works
CITY OF OSHKOSH
BY:
City Manager
City Clerk
Approved and accepted:
} Intractor
I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin,
under the within Change Order.
Approved as to form:
City Attorney
Comptroller
CONTRACT: 12.07 CHANGE ORDER # 3 FINAL
SECTION I - PAVING
100
Pavement removal,
Square
INCREASEIN
DECREASEIN
!TI td
BID
AESCRIPTfON UNIT
rNSTALII A
NET
NET
UNIT
CONTRACT
CONTRACT
NUMBER
QUANTITY
QUANi77W
fNCREASE
DECREASE
PRfGE
PRICE
PRICE
100
Pavement removal,
Square
complete asspecified
Yards
21,650
21,034.60
- 615.40
$1.93
$1,187.72
101
Sidewalk.and driveway
removal, complete as
Square
s ecified
Feet
67,700
68,238.90
538.90
54.50
3269.45
102
Excavation, complete a$
Cubic
specified
Yards
12,325
11,999,50
- 325.50
$10.44
33,398.22
103
7' non - reinforced concrete
pavement, Including
Integral curb, 5' base
material, and grading,
Square
complete as specifled
Yards
14,76.5
14,671.10
-93.90
$27.41
52,573.80
104
8" non - reinforced concrete
pavement, Including
Integral curb, 6" bass
material, and grading,
complete asspecified
Square
Yards 1
12,755
12,651.50
- 103.50
$29.94
33,098.73
105
8' concrete pavement.
HES, including Integral
curb and 6' base material,
and grading, complete as
Square
specified
Yards
1,255
1,073.20
- 181.80
$41.67
$7,575,61
306
12" wide radius curb head,
Linear
complete ass specified
Feet
1,450
1,484.50.
34.50
$6.00
$207.00
107
Standard 30 "curb and
gutter, 7" (tie -in), Complete
Linear
as Spec Red
Feel
1,310
1,341.70
31.70
$18.00
$570.60
106
Sidewalk curb, complete as
specified
Linear
Feel
295
259.80
-35.20
$18.00
$633.80
109
4" concrete sidewalk,
Square
complete asspecified
Feet
,975
35,666.00
3,691.00
$3.85
$14,210.35
110
6" concrete sidewalk and
r34,
driveway, complete as
specified
Square
Feet
860
33,906.20
- 1,453.80
$3.95
$4,162.51
ill
Remove, salvage, and ro-
Install brick pavers,
Square
complete ass specified
Feet
140
0.00
- 1Q0.40
$5.75
$805.00
112
3Y2" asphaltic Concrete
driveway /path with base,
Square
com lete ass pecified
Feet
2,890
1 4,136.00
1,246.00
$4.00
$4,984.00
113
3% :" asphaltic concrete
transition with base,
Square
complete asspecified
Yards
1,495
1,844.00
349.00
$33.36
$11,642.64
114
3%" asphaltic concrete
pavement with base,
com late ass ecified
Square
Yards
1,755
1,428.80
- 326.20
$23.30
$7,890.46
115
5" asphaltic concrete
transition with base,
Square
com lete -specified ecified
Yards
85
90.24
6.20
$56.22
$292.34
Paga 1 of 21
CONTRACT: 12.07 CHANGE ORDER $ 3 FINAL
ITEM
OESCRIPrfON
UNIT
BfD
QUANTITY
INSTALLED
QUANT1r1ES
NET
INCREASE
NET
DECREASE
UN17
PRICE
INCRFASEIN DECREASEIN
CONTRACT CONTRACT
PRICE
NUMBER
PRICE
116
Furnish and install crushed
stone base course,
complete as specified
Tons
8,000
714.30
- 5,285.74
$6.50
334,357.05
117
Sawing, camplale as
specified
Linear
Feat
4,600
2,640.00
- 1,960.00
$2.00
33,920.04
11$
Furnlsh and install
pavement ties (epoxy
coated), complete as
specified
Each
375
341.00
-74.00
$7.00
$518.00
119
Adjust manholes and inlets,
complete as specified
Each
227
228.00
-1.00
$340.40
3300.04
120
Furnish and install No. 4
reinforcing bars (epoxy
coated), complete as
specified
Linear
Feat
5,500
8,741.00
3,241.04
$0.80
$2,592.80
121
Remove frees and slumps,
complete as specified
Inch
OEameter
145
462.04
357.00
$24.00
$8,568,00
122
Furnish and install trees,
complete asspecified
Each
4
1100
9.04
$300.00
$2,700.00
123
Furnish and install metal
detectable warning fialds.
complete asspecified
Square
Feet
752
728.00
- 24.00
$28.00
$672.00
124
Terrace Work on Say
Street, complete as
Lump
1.00
$9,365.00
s ecified
Sum
1
125
Terrace work on School
Avenue, complete as
Lump
1.00
$9,365.00
s ecified
Sum
1
128
Terrace work on Shawano
Avenue, complete as
Lump
1.00
$1.765.00
specified
Sum
1
127
Terrace work on Boyd
Street, complete as
Lump
1.00
$19,765.40
specified
Sum
1
128
Terrace work on t .Irving
Avenue (N. Main Street to
Bowen Street), complete
Lump
ass ecified
Sum
1
1.00
$21,768.00
128
Terrace work on E. Irving
Avenue (Hazel Street to
Lake Winnebago),
Lump
comp fate asspecified
Sum
1
1.00
$6,065.00
130
Reset section monument
and re- establish witness
monuments at the
intersection of Grand Street
and E. Irving Avenue,
complete as specified
Lump
Sum
1
1.00
$SOO.0D
131
Excavation speclaE,
rmmnlete as soeclfiad
Tons
2,400
232.10
- 1,767.30
$9.00v15,911,i0
Page 2 of 21
CONTRACT: 12-07 CHANGE ORDER M 3 FINAL.
ITEM
NUMBER
DESCRIPTION
UNIT
E101
QUY
F ALLED
NTITIES
NET
INCREASE
NET
DECREASE
UNIT
PRICE
INCREASEIN
CONTRACT
PRICE
DECREASE 114
CONTRACT
PRICE
132
Furnish and install cold
UNIT
810
QUANTITY
INSTALLED
QUANTITIES
NET
INCREASE
INCREASE
NET
DECREASE
UNIT
PRICE
PRICE
CONTRACT
PRICE
100
weather covering, 1 -layer
visquine, complete as
s ecifed
Square
Yards
5,000
650.00
1 - 4,350.00
$0.01
543.50
133
Furnish and install cold
Square
Feet
3000.00
716.65
- 253.31
$0.60
3]69.59
101
weather covering, 2 -layer
visqu ine, complete as
s acified
Square
Yards
5,000
0.00
- 5,000.00
$0.01
550.00
134
Furnish and install cold
weather covering, 2 -layer
Square
Yards
300.00
286,73
-13.27
$58.04
$770.19
102
visquine and 6' hay,
Square
complete ass eciried
Yards
5,000
0.00
5,000.00
$0.0]
550.00
SECTION 1 -(BID ITEMS 1100 - 934) - SUS-TOTAL
ADDITIONAL WORK REQUIRED: C.O. # 2 - SECTION I (Contract 12 -22)
$46,037.18 ($86,857.36)
Page 3 of 211
INCREASEIN
DECREASEIN
ITEI!
NUM9ER
DESCRIPTION
UNIT
810
QUANTITY
INSTALLED
QUANTITIES
NET
INCREASE
INCREASE
NET
DECREASE
UNIT
PRICE
PRICE
CONTRACT
PRICE
100
Furnish and Install sldewalk
and driveway removal,
complete as s eciried
Square
Feet
3000.00
716.65
- 253.31
$0.60
3]69.59
101
Furnish and install Concrete
paving removal and 7' HES
concrete pavinglpatching.
com lete ass ecired
Square
Yards
300.00
286,73
-13.27
$58.04
$770.19
102
Furnish and install 477'
concrete sidexyalk and
driveway, complete as
s ecired
Square
Feet
11000.00
676.39
- 323.61
$4.00
$1,294.44
103
Furnish and install
reinforcing bars, complete
ass specified
Linear
Feat
400.00
254.00
-136.00
$0.50
$66.00
104
Furnish and Install cold
weather covering, I -layer
visquins, complete as
s eciried
Square
Yards
300.00
286.73
-13.27
$0.01
$0.13
105
Furnish and Install cold
weather covering, Mayer
visquins, complete as
s ecifled
Square
Yards
1 300,00
0.00
- 300.00
$0.01
Page 3 of 211
CONTRACT: 12.07 CHANGE ORDER 9 3 FINAL
ADDITIONAL. WORK: C.O. # 2 - (ITEMS '100.106) - SUB TOTAL $0.00 ($2,308.75)
ADDITIONAL WORK REQUIRED: C.O. U 3 - SECTION I (SULLIVAN STREET & SKYVIEW AVENUE & EXTRA WORK)
Mobtlizationl Traff frc
INCR✓ASEIN
15ECREASEIN
ITE M
NUMBER
DESCRIATfON
UNIT
BID
QUANTITY
INSTALLED
QUANTITIES
NET
INCREASE
NET
DECREASE
UNIT
PRICE
CONTRACT
PRICE
CONTRACT
PRICE
106
Furnish and install cold
Sum
0.00
1.00
1.00
$5,940.00
$5,940.00
1100
weather covering, 2 -layer
Square
v1squlne, and 6° hay,
Square
0.00
236.30
236,30
$10.50
$2,481.15
101
complete ass eciled
Yards
300.00
0.00
1 - 300.00
1 $0.01
1
$3.00
ADDITIONAL. WORK: C.O. # 2 - (ITEMS '100.106) - SUB TOTAL $0.00 ($2,308.75)
ADDITIONAL WORK REQUIRED: C.O. U 3 - SECTION I (SULLIVAN STREET & SKYVIEW AVENUE & EXTRA WORK)
1
Mobtlizationl Traff frc
INCREASE IN
DECREASE IN
irE1A
NUMBER
DESCRIPTION
UNIT
BID
QUANTITY
INSTALLED
QUANTITIES
NET
INCREASE
. ME r
DECREASE
U1
PRICE
CONTRACT
PRICE
CONTRACT
PRICE
1
Mobtlizationl Traff frc
Control, complete as
Lump
specified
Sum
0.00
1.00
1.00
$5,940.00
$5,940.00
1100
Pavement Removal,
Square
complete ass ecified
Yards
0.00
236.30
236,30
$10.50
$2,481.15
101
Sidewalk & Driveway
Removal, complete as
Square
specified
Feet
0.00
246.20
246.20
$1.10
$270.82
103
7" Non- Reinforced Integral
Concrete Pavement VAth
Base & Grading with Mesh
Square
(5.4 X W4), complete as
Yards
0.00
236.30
236.30
$59.38 1
$14,031.49
106
12" Wide Radius Curb
Head, complete as
Linear
specified
Feet
0.00
22.70
22.70
$17.50
$397.25
110
6" Concrete Sidewalk and
Driveway, complete as
square
specified
Feet
0.00
193.60
193.80
55.80 i
$1,122.88
117
Sawing, complete as
Linear
specified
Feet
1 0.00
132.20
132.20
$4.50
$594.90
118
Furnish & Install Pavement
Ties (ff6 Bars), complete as
specified
Each
0.00
44.00
44.00
$7.00
$308.00
119
Furnish & Install 18" Dowel
Bars, 8 Drilled, 67 Would
Be Baskets, complete as
Specified,
Each
0.00
65.00
65.00
$13.00
$845.00
123
Furnish & Install Metal
Detectable Warning f=ield
Plates, complete as
Square
specified
Feet
0.00
8.00
8.00
$40,00
$320.00
124
Terrace Work on Sullivan
Street & Sullivan Avenue,
Lump
,complete asspecified
Sum
0.00
1.00
1.00
$7 60.00
$760.00
132
Cold Weather Covering as
appropriate, complete as
1
Square
specified
Yards
0.00
196.40
196.40
$4.45
$873.98
10000
Furnish & Install Concrete
Step, complete as specified
Square
Feet
0.00
67.90
67.90
$40.00
$2,716.00
10001
Furnish & Install Sidewalk
lie -Bars, complete as
specified
I Each
1 .00
487.00
1 487.00
$5.00
1 $2,435.00
Page 4 of 21
CONTRACT: 12.07 CHANGE ORDER # 3 FINAL
Credit item for approx.
14,000 tons of salvaged,
crushed concrete base
course supplied by the City.
Credit paid to the City per
ton. Tons 14,000 - 11,582.5D 2,417.50 $3.25 $7,856.86
ALTERNATE B: C.O. 03 (ITEM 500) - SUB -TOTAL
$7,856.88
$0.00
fNCREASEIN
OECR£ASElN
ITEM
DESCRIPTION
UNIT
81p
QUANTITY
INSTALLED
QUANTITIES
NET NET
INCREASE D1 CREA5£
UNIT
PRICE
CONTRACT
PRICE
CONTRACT
PRICE
HUfABER
30002
Furnish & Install 8"
INCRERSElN
A£'CREASElN
rTF11
pESCftIPTlQN
UNIT
BID
QUANTITY
Concrete Pavement (9
NET
INCREASE
NET
pECREASE
U I
PRICE
CPNTRACT
PRICE
CONTRACT
PR1C£
NUfle£R
Bag), with Base, complete
as specified
Square
Yards
0.00
322.80
322.80
$50.87
516,356.28
2008
i0003
Profile Saw Cut Driveway
$350.00
at 19 Easl living Avenue,
com late asspecified
Lump
Sum
0.00
1 A0.
1.00
$328.00
$328.OD
J0004
Install Concrete Sidewalk
Clear shrubs, complete as
Lump
$ 425 00
In Lieu of Replacing Brick
specified
Sum
1
t.44
Pavers, completo as
s ecified
Lump
Sum
O.OD
1.00
1 1.00
$1,300.00
$1,300.00
10005
Furnish & Install 4"
$1,56O.DD
2034
Furnish and Install 10"
Sidewalk on Contract 11-
storm sewer, complete as
Linear
10
28.00
03 on Westfield Bridge,
complete asspecified
Square
I Feat
0.00
41.50
41.60
$3.50
$145.25
Feet
ADDITIONAL WORK. C,O. ti 3 • (ITr=MS
1 - 100461-
SUB -TOTAL
$61,226.00
CHANGE ORDER 93. ALTERNATE
B
Credit item for approx.
14,000 tons of salvaged,
crushed concrete base
course supplied by the City.
Credit paid to the City per
ton. Tons 14,000 - 11,582.5D 2,417.50 $3.25 $7,856.86
Page 5 of 21
ALTERNATE B: C.O. 03 (ITEM 500) - SUB -TOTAL
$7,856.88
$0.00
NET INCREASE TO:
SECTION 1
$16,953.95
SECTION if - STORM SEWER
INCRERSElN
A£'CREASElN
rTF11
pESCftIPTlQN
UNIT
BID
QUANTITY
INSTALLED
QUANTITIES
NET
INCREASE
NET
pECREASE
U I
PRICE
CPNTRACT
PRICE
CONTRACT
PR1C£
NUfle£R
2008
Clear trees, complete as
Lump
$350.00
specified
Sum
1
1.00
2008
Clear shrubs, complete as
Lump
$ 425 00
specified
Sum
1
t.44
2014
Utility line opening,
com late asspecified
Each
5
2.00
-3.00
$520.00
$1,56O.DD
2034
Furnish and Install 10"
storm sewer, complete as
Linear
10
28.00
16,00
$29.40
$470.40
specified
Feet
2036
Furnish and install 12"
storm sewer, complete as
Linear
1,750
1,717.50
-32.50
$39.00
$1,267.50
s ecified
f=eet
2042
Furnish and Install 16'
storm sewer, complete as
Linear
Feel
2,550
2,446.80
- 103.20
$38.65
$3,988.68
s cified
2048
Furnish and install 18"
storm server, complete as
Linear
710
697.70
-12.30
$4310
$530.13)
s ecified
Feet
Furnish and install 21"
,
[27054:
storm sewer, complete as
s ecified
Linear
Feet
575
1 551.10
1
- 23.90
$4$.24
$1,i51.gB
Page 5 of 21
CONTRACT: 1 2-07 CHANGE ORDER ## 3 FINAL
fTEti
BID
-
INSTAUED
NET
NET
UNIT
IPdCKEASL IN
CONTRACT
uLUM-Abt: +rc
CONTRACT
NUMBER
O! SCRlP170N
UNIT
QUANTITY
QUANTITIES
INCREASE
D15CREASE
PRICE
PRICE
PRICE
2060
Furnish and install 24"
storm sewer, complete as
Linear
s ecified
Feet
175
176.50
1.50
$53.50
$84.25
2066
Furnish and Install 27"
storm sewer, complete as
Linear
Feet
700
j 665.90
-34.10
$60.00
$2,046.00
specified
2072
Furnish and Install 30"
storm sower, complete as
s ecified
Linear
Feat
900
872.10
-27.90
$67.05
$1,870.74
2078
Furnish and install 36"
storm sewer, complete as
Linear
545.30
-44.74
$9115
$4,101.23
specified
Feet
590
2084
Furnish and Instal142"
Storm Sewer, complete as
Specified
Linear
Feet
820
778.70
49.30
$121.90
$5,013.82
2132
Furnish and install 29" x
45" HERCP Class Ill storm
sewer, complete as
s ecified
Linear
Feet
175
152.70
-22.30
$102.90
$2,294.67
2136
Furnish and install 34" x
53" HEHCP Class III Storm
Sewer, complete as
s ecified
Linear
Feel
55
44.60
-10.40
$123.00
$1,279.20
2176
Furnish and install 6'x V
box culvert storm sevrer,
com lete ass ecified
Linear
Feet
512
517.10
5.10
$345.00
$1,759.50
2224
Furnish and install V x V
box culvert storm sewer
with manhole or Intel riser,
Linear
com lete asspecified
Feet
24
24.00
$345.00
2280
Furnish and Install 6" storm
lateral, complete as
specified
Linear
Feel
5,000
4,878.60
- 121.40
$37.00
$4,49i.e4
2282
Furnish and install 8" storm
lateral, complete as
specified
Linear
Feet
45
134.00
89.00
$40.00
$3,660.00
2284
Furnish and Insist l storm
sewer marker balls,
complete asspecified
Each
1 321
324.00
3.00
$20.00
$64.00
2286
iFurnish and install clay
dams, complete as
specified
Each
161
162.00
1.00
$40.00
$40.00
2288
Furnish and install lateral
fntet, complete ass specified
Each
160
116.04
-44.00
$335.04
$14,740.00
2364
Furnish and install V x 6'
box culvea and section
with joint ties, complete as
specified
Each
9
1.00
$3,225.00
2481
Furnish and install 54"
casing pipe by Irenchless
methods, complete as
Linear
s ecified
Feet
65
65.00
$96044
2532
Furnish and Install
standard storm manhole (4'
diameter), complete as
s ecified
Vertical
Feet
141
144.21
-0.79
$279.00
$220.41
Page 6 of 21
CONTRACT: 12 -OT CHANGE ORDER 9 3 FINAL
Page 7 of 21
fNCREASEIN
DECREAS @1N
rr> t
NUMBER
DESCRIPTION
UNIT
BIO
4UANrlTY
INSTALLED
QUANTITIES
NET
INCREASE
NET
DECREASE
UV11,
PRICE
CONTRACT
PRICE
CONTRACT
PRICE
2534
Furnish and Install
standard storm manhole (5'
diameter), complete as
specified
Vertical
Feet
65
64.69
0.31
$583.00
$118.73
2536
Furnish and Install
standard storm manhole (6
diameter), complete as
specified
Vertical
Feet
71
70.44
-0.56
$399.00
3223.44
2538
Furnish and Install
standard storm manhole (7'
diameter), complete as
Vertical
10
8.93
-1.07
$569.00
$608.83
specified
Feel
2550
Fumish and Install
standard storm manhole (7'
x 7' box), complete as
s acified
Vertical
Feel 1
111
1 10.38
-0.52
$994.00
$616.28
2556
Furnish and install
standard storm Intel
manhole (4' diameter),
complete asspecified
Vertical
Feet
4
2.91
-1.09
$496.00
$540.64
2580
Furnish and Install storm
{unction chamber, complete
asspecified
Each
1
1,00
$27,54Q.D0
2584
Furnish and install
standard storm manhole
riser (4' diameter),
cam Iele ass ecified
Vertical
Feel
4
3.66
0.34
$350.40
$419.00
2590
Furnish and install
standard storm Intel
manhole riser (4' diameter),
Vertical
0.80
1.20
$633.00
$759.60
complete as specified
Feat
2
2612
Furnish and install Type 1
Inlet, com tale asspecified
Each
5
1.00
-4.00
$1,125.00
$4,500.00
26 34
Furnish and install Type 3
inlet (with 18" sump),
complete ass ectfled
Each
104
104.00
$1,236.00
2618
Furnish and install Type 3
inlet riser, complete as
specified
Each
i
0.00
-1.00
$555.00
$655.00
2800
Connect to existing storm
sewer, complete as
s ecified
Each
3
4.00
1.00
$186.00
$186.00
2802
Connect to existing storm
lateral, complete as
specified
Each
5
5.00
$48,00
2806
Connect to existing
manhole, complete as
s ecified
Each
3
4.00
1.00
$295.00
$295.00
2808
Connect to existing Inlet,
complete ass ecif€ed
Each
6
6.00
$200.00
2820
Abandon 8!'- 12" storm
sewer, complete as
s ecified
linear
Feel
300
86.50
- 213.50
$3.00
3640.50
2822
Abandon 15" and larger
storm sewer, complalo as
Eil
s em se
,475
3, 972.00
1,497.00
$10.90
$16,317.30
Page 7 of 21
CONTRACT: 12.07 CHARGE ORDER 0 3 FINAL
ITEIJ
DESCRIPTION
UNIT
B!D
INSTALLED
NET
NET
Fos
UNIT
INCREASE IN
CONTRACT
DECREASE 1N
CONTRACT
NUMBER
UNrT
e1D INSTALLED
QUANTITY QUANTITIES
QUANTITY
QUANTITIES
INCREASI
CREASE
PRICE
PRICE
PRICE
2824
Remove 30° and smaller
storm sewer, complete as
Linear
specified
Feel
2,450
2,094.00
- 356.00
$15.00
$5,340.00
2826
Remove 33" -- 60" storm
lump
sewer, complete as
Linear
11.00
1.00
$2,072.18
20001
specified
Feet
65
99.00
34.00
$15.00
$510.00
2830
Abandon storm manholes
and iniels, complete as
Each
2.00
2.00
$100.00
specified
Each
10
10.00
$175.00
2832
Remove storm manholes
and lnfels, complete as
specified
Each
47
47.00
$233.00
2858
Furnish, install, maintain,
and remove Type D
modified Inlet protection,
complete asspecified
Each
265
168.00
1 - 100.00
$60.00
$6,000.00
2860
Sediment removal - Type D
modified Inlet protection,
complete as specified
Each
268
12.00
- 256.00
$15.00
$3,840.x0
2866
Furnish, Install, maintain,
and remove stone bag,
complete asspecified
Each
50
0.00
-50.00
$6.00
$30fl.00
2868
Furnish, install, maintain
and remove 12" diameter
sediment logs, complete as
linear
specified
Feet
22
22.00
$12,00
2876
Furnish, install, maintain,
and remove turbidity
barrier, complete as
specified
Each
I 1
1.00
$2,000.00
2930
Furnish and install Class I,
TypaA erosion control mat,
Square
complete asspecified
Yards
55
347.66
292.66
$4.50
$1,3116.97
2948
Furnish and install heavy
rip -rap with filter fabric,
Square
com le le ass ecified
Yards
47
83.08
36.08
$75.00
$2,706.00
2960
Rock excavation, complete
Cubic
asspecified
Yards
50
0,00
-50.00
$0.01
SE=CTION II - (BID ITEMS 2006 - 2960) • SUB-TOTALS $27,301.42 ($68,818.64)
ADDITIONAL WORK REQUIRED. C.O.41 -SECTION 11
20000
Additional labor, materials,
ICONTR
f3RGREf1SE1N
ITEAr
DESCRIPTION
UNrT
e1D INSTALLED
QUANTITY QUANTITIES
NET
INCREASE
NET
DECREASE
UNIT
PRICE
,
CONTRACT
PRICE
CgNTRAOT
PRICE
NM
inlet lead out of MN Bit to
20000
Additional labor, materials,
and equipment to lower the
inlet lead out of MN Bit to
get under the sanitary
sewer, per invoice dated
6112112, complete as
lump
specified
Sum
11.00
1.00
$2,072.18
20001
Furnish and Install 8" x N'
tees, complete as specified
Each
2.00
2.00
$100.00
Page 8 of 21
CONTRACT. 12-07 CHANGE ORDER # 3 FINAL
ITEM
NUMUER
OESCRlpTlON
UNIT
81D
QUANTITY
INSTALLE=D
QUANTITIES
NE
INCREASE
NET
DECREASE
UNIT
PRICE
INCREASEIN
CONTRACT
PRICE
DECREASE IN
CONTRACT
PRICE
20002
Add[flonal labor, materials,
INSTALLED NEr NET
TJNT
CONTRACT
CONTRACT
NUMBER
CONTRACT
NUMBER
QUANT7TY
QUANTITIES INCREASE DECREASPRICE
and equipment to feset
PRICE
PRICE'
PRICE
PRICE
PRICE
PRICE
$78.04
F$3,978.00
2550
Inlet D -36, which was
Each
16.00
18.00
2.40
$60.00
$120.00
Installed to an incorrect
grade, per Invoice dated
Vertical
7124112, complete as
Lump
0.00
3,75'
3.75
$1,990.00
$7,462.50
2614
s ecified
Sum
1 1.00
1 1.00
$728.75
ADDITIONAL WORK,, C.O. # i - (ITEMS 20000. 20002) - SUB -TOTAL $0.00 $0.00
ADDITIONAL WORK REQUIRED: C.O. # 2- SECTION II (CONTRACT 12 -22)
2856
Furnish, install, maintain,
INCREASEIN
D1=CREASEIN
ITEM
1TEICf DESCRIPTION
UNIT
BID
INSTALLED NEr NET
TJNT
CONTRACT
CONTRACT
NUMBER
CONTRACT
NUMBER
QUANT7TY
QUANTITIES INCREASE DECREASPRICE
protection, complete as
PRICE
PRICE'
2856
Furnish, install, maintain,
INCREASEIN
DECREASI IN
1TEICf DESCRIPTION
UNIT
and remove Type 0 Inlet
INSTALLED
NET
NET
UNIT
CONTRACT
CONTRACT
NUMBER
QUANTITY
protection, complete as
INCREASE
DECREASE
PRICE
PRICE
PRICE
PRICE
$78.04
F$3,978.00
2550
specified
Each
16.00
18.00
2.40
$60.00
$120.00
ADDITIONAL WORK: C.O. # 2 - (ITEM 28801 - SUB -TOTAL $120.00 $0.00
ADDITIONAL WORK REQUIRED: C.O. f# 3 - SECTION II (SULLIVAN STREET & SKYVIEW AVENUE & EXTRA WORK)
2036
Furnish & Install 12" Storm
INCREASEIN
DECREASI IN
1TEICf DESCRIPTION
UNIT
8f11
INSTALLED
NET
NET
UNIT
CONTRACT
CONTRACT
NUMBER
QUANTITY
QUANTITIES
INCREASE
DECREASE
PRICE
PRICE
PRICE
PRICE
2036
Furnish & Install 12" Storm
Sewer, complete as
Linear
specified
Feel
0.00
51.00
51XI)
$78.04
F$3,978.00
2550
Furnish & Install Standard
Storm Manhole, V x 5' Rox
with Steel Top, complete
Vertical
asspecified
Feel
0.00
3,75'
3.75
$1,990.00
$7,462.50
2614
Furnish and Install Type 3
Inlet, complete as specified
Each
0.00
3.00
3.00
$1,677.00
$8,031.00
2858
Furnish and Install Modified
Inlet Protection, complete
asspecified
Each
0.00
8.00
8.00
$75.00
$800.00
2860
Sediment Removal - Type
D Modified Inlet Protection,
complete asspecified
Each
0.00
8,00
8.00
$5.00
$40.00
20003
Additional labor to re -saw
hole in MH b -17 for pipe
run 21 to avoid conflict
between 21" Storm sewer
and City own ad Fiber Optic
Lump
Vine, complete ass specified
Sum
0.00
1,00
1.00
$231.00
$231.00
Page 9 of 21
CONTRACT: 12.07 CHANGE ORDER # 3 F114AL
ITEAf
UNIT
BID
INSTALLED
NET NET
UNIT
INCREASE IN DECREASE IN
CONTRACT CONTRACT
NUMBER
ON
DESCRIPTION
QUANTITY
QUANTITIES
INCREASE DECREASE
PRICE
PRICE PRICE
20004
Additional tabor,
equipment, and materials
to install 8" storm sewer .
risers into building storm
sewer lines at various
locations, complete as
specified
Vertical
Feet
0.00
5.00
5.00
$550.00
$2,750.OD
20005
Additional labor, materials,
and equipment to reset
inlets 1.68 and 1.68 to avoid
conflicts with the leads and
gas mains, complete as
specified
Lump
Sum
0.00
1.00
1.00
$2,808.03
$2,808.03
20006
Additional labor, materials,
and equipment to remove
and resel section of box
culvert, dig back and lower
fiber oplic line to lower
under box culvert to avoid
conflicts, complete as
s ecifed
Lump
Sum
0.00
1.00
1.00
$4,587.92
$4,587.92
2_OD7
Additional labor, materials,
and equipment to modify
MH in the Intersection of
Sullivan and Skyvlewto
match existing field
conditions of existing 27"
and 30" storm lines, and
lower Inlet lead to get under
existing gas main,
complete ass eolfled
Lump
Sum
0,00
1.00
1,0D
$1,008.00
$1,008.00
20008
Furnish & Install 27" RCP
storm sewer, complete as
specified
Linear
Feet
0.00
6.00
6.00
$76.70
$454.20
20009
Furnish & Install 30" RCP
storm sewer, complete as
specified
Linear
Feet
0.00
6.00
6.00
$89.04
$534.00
20010
Additional labor and
material to change the
limits of the turbidity barrier,
complete as specified
lump
Sum
0.00
1.00
1.00
$500.00
$500.00
20011
Extra labor and materials to
build a se tiling area for the
exxcavations from the lake,
com lete es specified
Lump
I Sum
0.00
1.00
1.00
$182.00
$182.00
ADDITIONAL WORK: G.O.
# 3 - (ITEi IS 2038.20D11) - sUt3 -TOTAL
$30,166,65 $0.00
NET DECREASE T0: SECTION 11 [511,230.67}
SECTION III - SANITARY SEWER
8iP INSTALLED NET NET UNIT INCREASE IN DECREASE II
ITEM DESCRIPTION UNIT CONTRACT CONTRACT
NUMBER QUANTITY QUANTITIES IN DECREASE PRICE PRICE PRfCE
Page 10 of 21
CONTRACT: 12 -07 CHANGE ORDER rl3 FINAL
1TE1d
BI
INSTALLE=D
NET NET
UNIT we xra�k rry
CONTRACT
ucu + <ekac aiv
CONTRACT
NUMBER
DESCRIPTION
UNIT
QUANTITY
QUANTITIES
INCREASE DECREASE
PRICE
PRICE
PRICE
3000
Furnish and Install 8"
sanitary sewer relay,
complete asspecified
linear
Fe et
4,376
4,462.90
87.90
$52.60
$4,623.54
3002
Furnish and install 10'
sanitary sewer relay,
Linear
complete asspecified
Feet
60
63.60
3.60
$75.20
$270.72
3006
Furnish and install 15'
sanitary sewer relay,
Linear
com lea ass specified
Feet
30
33.90
3.90
$745<00
$565.50
3060
Furnish and Install a'
sanilary sewer drop,
complete asspecified
Vertical
Feet
22
18.23
-3.77
$550,00
$2,073.50
3100
Furnish and install
standard sanitary manhole
(4' diameter), complete as
specified
Vertical
Feat
240
235.73
-4.27
$234.00
$982.70
3174
Furnish and install external
manhole chimney seal,
complete as specified
Each
30
30.00
$454.00
3116
Fumish and install external
manhole chimney seal
extenslon, complete as
specified
Each
3
1.00
-2.00
$400.00
$600.00
3118
Furnish and Install internal
manhole chimney seat,
complete as specified
Each
3
1.00
- 2.00
$300.40
$640.00
3210
Furnish and Install 8" x 6"
factory wyes or tees,
complete asspecified
Each
115
112.00
-3.00
$100.00
$300.00
3234
Furnish and install 4 "d6"
sanllary lateral relay,
complete ass ecified
linear
Feet
5,150
4,971.70
- 178.30
$61.10
$1fl,e94.73)
3235
Furnish and Install 4'76"
sanitary riser relay,
complete ass ecified
Linear
Feet
115
207.00
9100
$61.10
$5,621.20
3236
Furnish and Install sanitary
lateral marker balls,
complete as specified
Each
275
323.00
98.00
$20.00
$960.00
3238
Furnish and install clay
dams, complete as
specified
Each
160
157.00
-3.00
$65.00
$195.00
3300
Furnish and Install
connections to existing 8"
mains, complete as
s ecified
Each
1 6
6.00
1.0D
$160.00
$160.00
3302
Famish and Install
connections to existing 10"
mains, complete as
specified
Each
4
4.00
$175.00
3306
Furnish and install
connections to existing 15"
mains, comptate as
s ecified
Each
5
5.00
$200.00
3332
Core Into existing manhole,
com fete ass ecified
Each
3
3.00
$650.00
Page 11 of 21
ITEM
DESCRIPTION
NUMBER
2.00
3600
Rock excavation, complete
IACREASEfN
ass ecified
3700
Televise sanitary sewer,
INSTALLED
cam ieto asspecified
3800
Abandon sanitary
CONTRACT
manholes, complete as
UNIT
s eciffed
3802
' INCREASE
DECREASE
Abandon 8' sanitary sewer,
PRICE
complete ass aclfied
3808
Abandon 12' sanitary
0.00
sewer, complete as
- 50.00
s ec €ried
3814
Abandon 24" sanitary
linear Feel
sewer, complete as
4,560.40
sec €tied
3815
Abandon 27" sanitary
$195.60
sewer, complete as
ec€Ced
L3!85!0jR
em ove sanitary sewer
CONTRACT: 12 -07 GRANGE ORDER 0 3 FINIAL
Each
3
5.00
2.00
SECTION III -
(BID ITEMS 3000.3850) • SUB- TOTALS
IACREASEfN
DECREASE IN
15
BID
INSTALLED
- NET
NET
UNIT
CONTRACT
CONTRACT
UNIT
QUAtITITy
QUANTITIES
' INCREASE
DECREASE
Linear
Feet
PRICE
PRICE
Cublc Yards
50
0.00
and equipment to cut In
- 50.00
$100.00
335.00
$5,000.00
linear Feel
4,430
4,560.40
130.40
$1.60
$195.60
Existing lateral currently
Each
3
5.00
2.00
SECTION III -
(BID ITEMS 3000.3850) • SUB- TOTALS
$27,306.66 (520,844.73)
Linear Feet
15
15.00
$3.50
Linear
Feet
240
240.00
INSTALLED NET
QUANTITIES INCREASE
NET UNIT CONTRACT CONTRACT
DECREASE PRICE PRICE PRICE
$3.60
Linear
Feet
220
605.00
385.00
$16.40
and equipment to cut In
Linear
FAM
20
335.00
315.00
$25.00
om late ass stifled
Feel 1 375 1
602.00 1 27.00
y10.UV ""qV°•UV
SECTION III -
(BID ITEMS 3000.3850) • SUB- TOTALS
$27,306.66 (520,844.73)
ADDITIONAL WORK REQUIRED. C.O.
# 1 - SECTION III
INCREASE rN OECREASE IN
ITEM DESCRIPTION
UNIT BID
QUANTITY
INSTALLED NET
QUANTITIES INCREASE
NET UNIT CONTRACT CONTRACT
DECREASE PRICE PRICE PRICE
NU6fBER
-F
30000 Additional labor, materials,
and equipment to cut In
and Install a new, additional
wye for 544 School SIMI.
Existing lateral currently
goes through neighbors
yard and Is connected to
the sanitary sewer on Bay
Street, per lnvolce dated
6012, complete as
specified
Lump
Sum 1.00
1.00
$1,611.43
30001 Additional labor, materials,
and equipment to Install an
8" x 8" wye for Church on
Bay Stfeat, The e>dsUng
lateral changed from a 6" to
an 8" lateral at the property
line and Contractor had to
cap the ti wye and instail
and 8" wye with two in €ine
sleeves, per. invoice dated
617112, compelte as
specilied
Lump
Sum 1 1.00
1 1.00.
84,558.27
Page 12 of 21
CONTRACT; 12.07 CHANGE ORDER # 3 FINAL
ITE7d
DESCRIPTION
UNIT
SID
INSTALLED
NET
NET
UNIT
INCREASE IN
CONTRACT
DECREASE IN
CONTRACT
NUMBER
QUANTITY
QUANTITIES
INCREASE
DECREASE
PRICE
PRICE
PRICE
30002
Additlona€ labor and
equipment to investigate a
sanitary lateral blockage
reported by homeowner.
There was no blockage
and City agreed to spoil the
time with the Contractor,
per Involco dated 6112112,
complete as specified
Lump
Sum
0.50
0.50
$1,035.00
30003
Additional labor, materials,
and equipment to remove
concrete encased drop on
MH 02 -10% so Contractor
could connect to existing
drop at the proposed
grade, per Invoice dated
61114(12, complete as
Lump
spec €fled I
Sum 1
1.00
1.00
1
$2,968.42
30004
Additional labor, materials,
and equipment to remove
concrete encasement
around MH 11 -621 to allow
for the proposed
connection Into the existing
manhole, par Invoice dated
6127112, complete as
Lump
specified
Sum
1.00
1.00.
$902,00
30005
Additional labor, materials,
and equipment to bulkhead
an existing abandoned
sanitary wye, creating a
sink hole in the intersection
of Broad Street and School
Avenue, per Invoice dated
716112, complete as
specified
Lump
Sum
1 1.00
1.00
1
$994.70
30006
Additional labor, materials,
and equipment to cap wye
for 538 Boyd Street at an
abandoned sanitary lateral
and install a new wya at
new location,
approximately 30 feet south
of original location, per
Invoice dated 7123112,
complete as specified
Lump
Sum
1 1.00
1 1.00
$3,175.05
Page 13 of 21
CONTRACT: 92.07 CHANGE ORDER # 3 FINAL
JTff.! .
NUMPER
DESCRIPTION
UNIT
8!D
QUANTITY
INSTALLED
QUANTITIES
NET
INCREASE
NIT
DECREASE
UNIT
PRICE
INCREASE IN
CONTRACT
PRICE
DECREASE IN
CONTRACT
PRICE
30007
Additional labor, materials,
81D
QUANTITY
INSTALLED NET
QUANTITIES rNCRfASf
NET UNIT
DECREASE PRICE
CONTRACT
PRICE
CONTRACT
PRICE=
3222
furnish and Install W
and equipment to remove
"Insert -A- Tee" or "Kor -N-
concrete encasement
Sear', complete as
around existing City fiber
s ecifled
Each
9
9.00
$446.00
3234
Furnish and Install 4 "V
optic cable, which also
sanitary lateral relay,
Linear
encased the sanitary
com fete asspecified
Feet
250
216.50
-33.50 $113.40
sewer. Contractor had to
$3,79190
3236
temporary connect the
Furnish and install sanitary
lateral marker balls,
sanitary sewer until City
complete as specified
Each
18
Efectrtc Division could
$23.00
3238
Furnish and install clay
review the situation. Once
dams, complete as
clear Contractor removed
s eolfied
Each
9
9.OD
the concrete encasement,
$90.00
and installed the proposed
sanitary sewer underneath
the City fiber, per Involves
dated 7130142 and 811112,
Lump
complete as specified j
sum
I 1.00
1 1.00
1
$2,651.89
ADDITIONAL WORK: C. O.O 1 • )ITEMS 30000 - 50007) - 5UB TOTAL $0.00 $0.60
ADDITIONAL WORK REQUIRED: C,O. # 2 - SECTION III (CONTRACT 12 -22)
INCREASEIN
OECREASEIN
ITEM
NUMBER
DESCRIPTION
UNIT
81D
QUANTITY
INSTALLED NET
QUANTITIES rNCRfASf
NET UNIT
DECREASE PRICE
CONTRACT
PRICE
CONTRACT
PRICE=
3222
furnish and Install W
"Insert -A- Tee" or "Kor -N-
Sear', complete as
s ecifled
Each
9
9.00
$446.00
3234
Furnish and Install 4 "V
sanitary lateral relay,
Linear
com fete asspecified
Feet
250
216.50
-33.50 $113.40
$3,79190
3236
Furnish and install sanitary
lateral marker balls,
complete as specified
Each
18
18.00
$23.00
3238
Furnish and install clay
dams, complete as
s eolfied
Each
9
9.OD
$90.00
Page 14 of 21
CONTRAM 12.07 CHANGE ORDER # 3 FINAL
IrEM
Additional labor, materials,
BID
BID
INSTALLED
NET
NET
UNIT
WCREASEIN
DECREASE 114
NUMBER
DESCRIPTION
UNIT
QUANTITY
QUANTITIES
INCREASE
DECREASE
PRICE
CONTRACT
CONTRACT
PRICE
eixsting casting to expose
PRICE
PRICE
3700
Televise sanitary sewer,
Linear
complete asspecified
Feet
1,200
1,261.40
61.40
$1.60
$98.24
ADDITIONAL WORK: C.0.02- (ITEIAS3222- 3700) - SUB -TOTAL $98.24 ($3,798.90)
ADDITIONAL WORK REQUIRED., C.O. # 3 - SECTION III
!Tr rA
Additional labor, materials,
BID
INSTALLED
NET NET UNIT
INCREASEIN
DECREASE IN
NUdiBER
DESCRIPTION UNIT
QUANTITY
QUANTITIES
INCREASE DECREASE PRICE
CONTRACT
CONTRACT
I
PRICE
PRICE
30008
Additional labor, materials,
and equipment to cut away
eixsting casting to expose
existing 10" sanitary to
connect to it, on East Irving
Avenue, complete as
Lump
specified
Sum
0.00
1.00
1.00
$1,222.00
$1,222.00
30009
Additional labor, materials,
and equipment to saw and
hammer poured concrete
off drop to install manhole,
Lump
complete as specified
Sum
0.00
1.00
1.00
$728.75
$728.75
30010
Additional labor, materials,
and equipment for Four
Way Construction to
remove cones and sections
of existing sanitary
manholes and replace
cones to match proposed
grades on East living
Avenue, complete as
Lump
specified
Sum 1
0.00
11.00
1.00
$2,550.63
$2,550.63
30011
Additional labor, materials,
and equipment for Vinton
Construction to remove
cones and sections of
existing sanitary manholes
and replace cones to
match proposed grades on
East Irving Avenue,
complete as specified
Lump
Sum 1
0.00
1.00
1.00
$2,983.50
$2,983.50
Page 15 of 21
CONTRACT: 12.07 CHANGE ORDER # 3 FINAL
ADDITIONAL WORK: C.O. # 3 - (ITEt,1S 34008 - 34012) - SU8- TOTAL, $9,17D,86 $0.00
NET INCRE=ASE TO: SECTION III $11,931.05
SECTION IV -WATER MAIN
Furnish and install 4"
lNCR1ASElN
DCONTRACT
INCREASFIN
DEGREASEIN
rrFdr
NUt4Br R
DESCRIPTION
UNIT
BID
QUANTfrY
lNSrALLED
QURNTf71ES
NEr
INCREASE
NET
NET
UNIT
PRICE
CONTRACT
PRICE
CONTRACT
PRICE
30012
Furnish and Install 10"
Linear
sanitary sewer drop,
Vertical
30
33.00
3.00
$66.40
$199.20
4002
complete asspecified
Fe ei
0.00
2,81
2.61
$600.00
$1,686.00
ADDITIONAL WORK: C.O. # 3 - (ITEt,1S 34008 - 34012) - SU8- TOTAL, $9,17D,86 $0.00
NET INCRE=ASE TO: SECTION III $11,931.05
SECTION IV -WATER MAIN
4000
Furnish and install 4"
lNCR1ASElN
DCONTRACT
ITEIA
NUMBER
DESCRIPTION
UNIT
BID INSTALLED
QUANTITY QUANTITIES
NET NET
INCREASE DECREASE
UNIT
PRICE
CONTRACF
PRICE
CONTRACT
PRICE
4000
Furnish and install 4"
ductile iron water main with
poly wrap relay, complete
Linear
asspecified
Feet
30
33.00
3.00
$66.40
$199.20
4002
Furnish and install 6'
ductile Iron water main with
poly wrap relay, complete
Linear
asspecified
Feet
475
446.20
1
-28.80
$65.00
31,872.00
4004
and install 8'
ductile Iron water main with
IFurrilsh
poly wrap relay, complete
Linear
asspecified
Feet
4,900
4,851.00
-49.00
UC20
$3,145.80
4008
Furnish and install IT
ductile iron water main with
poly wrap relay, complete
Linear
ass eetifed
Feet
1 2,650
2,667.00
1 117.00
$82.15
$1,396.55
4036
Furnish and Install I' water
service relay, complete as
Linear
specified
Feet
4,500
5,015.50
515.50
$38.00
$19,589.00
4038
Furnish and Install 1`/7
water service relay,
Linear
complete asspecified
Feet
50
0.00
1 -50.00
$40.00
$2,000.00
4040
Furnish and Install 2' water
service relay, complete as
Linear
Feet
12
116.00
4.00
$60.00
$240.00
4048
.specified
Furnish and install 1'
corporation: and stop box,
complete asspecified
Each
1155
150.00
- 5.00
$273.00
$1,365.00
4050
f=urnish and Install I %.'
corporation and stop box,
complete asspecified
Each
1
0.00
-1.00
1 $535.00
$535.00
4052
Furnish and Install 2'
corporation and stop box,
com fete asspecified
Each
1
1.00'
$720.00
4054
Furnish and install water
service clay dams,
complete asspecified
Each
155
155.00
$45.00
4056
Furnish and install
connections to existing 4"
water main, complete as
s ecified
Each
1
1 1.00
1
1
1 $1,382,00
Page 16 of 21
CONTRACT. 12.07 CHANGE ORDER 9 3 FINAL
ITEM
DESCRIPTION
UNIT
81D
INSTALLED
NET
NET
UNIT
INCREASEIN
CONTRACT
DECREASEIN
CONTRACT
NUMBEFR
QUANTITY
QUANTITIES
INCREASE
Dl=CRFASE
PRICE
PRICE
PRICE
4058
f=urnish and install
connections to existing 6"
water main, complete as
specified
Each
8
16.00
8.00
$1,425.00
$11,400.00
4060
Furnish and install
connections to existing 8"
water main, compfele as
specified
Each
1 7
7.00
$1,474.00
4064
Furnish and install
connections to existing 12"
water main, complete as
specified
Each
3
5.00
2.00
$1,944.OD
$3,888.0D
4108
Furnish and install a" x 4"
tee, complete asspecified
Each
1
0.00
-1.00
$440.00
$440.00
4110
Furnish and Install 8" x 6"
tea, cam tote as specified
Each
15
14.00
-1.00
$394.00
$394.00
4111
Furnish and install 8 "x 8"
tee, complete asspecified
Each
2
1.00
-100
$478.00
$478.00
4128
Furnish and Install 12" x 6"
tee, complete asspecified
Each
8
7.00
-1.00
$668.00
$668.00
4129
Furnish and install 12" x 8"
lee, complete asspecified
Each
8
6.00
-2.00
$715.00
$1,430.00
4131
Furnish and install 12" x
12" tee, complete as
s ecified
Each
1
1 1.00
$1,050.00
4189
Furnish and Install 8" x 8"
cross, complete as
specified
Each
4
4.00
$640.00
4191
Furnish and install 8" x 12"
cross, complete as
specified
Each
2
2.00
$840.00
4219
Furnish and €nstaIt 8" 11 A
degree bend, complete as
s ecified
Each
1 4
3.00
-1.00
$269.00
$2$9.00
4227
Furnish and install 6` 22'/
degree bend, complete as
specified
Each
2 1
0.00
-2.00 1
$205.00
$410.00
4228
Furnish and install 8' 22%:
degree bend, complete as
s ecif €ed
Each
2
0.00
-2.00
$280.00
$560.00
4230
Furnish and Install 12' 22%
degree band, complete as
specified
Each
2
0.00
1 -2,0D
$507.00
$1,014.00
4235
Furnish and Install 4' 45
degreo bend, complete as
s ecified
Each
4
3,00
-1.00
$162.00
$162.00
4236
Furnish and install 6" 45
degree bend, comploto as
s ecilled
Each
26
59.00
33.00
$204.00
$6,732.00
4237
Furnish and install 8'45
degree bend, complete as
specified
Each
16 1
19.00
3.00
$282.00 1
$846.00
4239
Furnish and Install 12" 45
degree bend, complete as
s ecified
Each
6
4.00
- 2.00
$552.00
$1,104.00
4254
Furnish and Install 6' cap,
1complete
ass ecif €ed
Each
3
2.00
-1.00
$105.00
5105.00
Page 17 of 21
CONTRACT: 12.07 CHANGE ORDER # 3 FINAL.
Page 18 of 21
INCREASE' IN
DECREASE IN
fT£!!
DESCRIPTION
UNIT
810
QUANTITY
INSTALLED
QUANTITIES
NET NET
rNCR>ASE DECREASE
UNIT CI ONTRAC T
PRICE PRICE
CONTRACT
PRICE
NUIfBSft
8255
Furnish and install 8' cap,
-1.00
$145.00
$145.00)
complete asspecified
Each
2
1.00
4263
Furnish and install 8" x 4"
reducer, complete as
specified
Each
2
2.00
$220.00
4264
Furnish and Install B" x 6"
reducer, complete as
specified
Each
15
13,00
-2.00
$240.00
$480.06
4352
Cut and cap existing 6"
water main, complete as
$1,120,00
s ecified
Each
2
2.00
4401
Furnish and Install 6' gate
valve, complete as
specified
Each
22
20.00
-2.OD
$969.00
$1,538.04
4402
Furnish and Install 8' gale
valve, complete as
specified
Each
35
30.00
- 5.00
367.00
$6,635.00
4404
Furnish and fnstali 12' gate
valve, complete as
specified
Each
18
14.00
- 4.00
r$2,360.00
$9,440.00
Furnish and install 6" x 6"
r
tapping valve and sleeve, com lete as S acifled
Each
3
2,00
-1.DD
$2,096.00
$2,036.00
Furnish and install 12" x 8"
tapping valve and sleeve,
2
1.00
-1.00
$2,608.00
$ 2,60B.00
cats ass specified
m le
Each
4458
Furnish and install 16" x V'
tapping valve and s€oove,
1
1.06
$ 3,616.00
complete asspecified
Each
r4504
Furnish and install hydrant,
com fete ass ecified
Each
18
17.00
-1.00
$2,854.00
$2.854.04
Furnish and install gradalok
for hydrant branches,
complete asspecified
Each
It)
0.00
-18.00
$307.00
$5,526.00
4730
Furnish and install 24' steel
casing pipe, complete as
Linear
$406M
specified
Feat
50
50.04
4900
Abandon water main on
Day Street, Complete as
Lump
$1,550.00
s ecified
Sum
1
1.40
4902
lAbandon water main on
Boyd Street, complete as
Lump
$1,600,00
specified
Sum
1
1.00
4904
Abandon water main on E.
Irving Avenue, completo as
Lump
$ 3,700.00
specified
Sum
1
1.00
4906
Abandon water main on
SchoolAvanue, complete
Lump
$600.00
asSpecified
Sum
1
1,00
4908
Abandon water main on
Shawano Avenue,
Lump
1.00
$300.00
complete asspecified
Sum
1
4920
Remove water main,
cam lele asspecified
Linear
Feet
315
1,357.00
1,042A6
320.00 t,20,,40.,,
Page 18 of 21
CONTRACT, 12 -07 CHANGE ORDER # 3 FINAL
SE(MUNIV -(13113 [ItIMSAUUU- 9B2Uj- bU1s-iVIALO NPoo,IOU.!o «Y11 o10.VV1
ADDITIONAL WORK REQUIRED,. C,O. # 1 - SECTION IV
Additional tabor, mater €ats,
and equipment to repair an
existing broken water valve
on Bay Street, per Invoice
dated 6/22112, complete as
specified
Lump
Sum
1.00
1.00
INCREASE IN
INGRFASElN
DECREASE IN
1TER{ DESCRIPTION
UNIT
BID
INSTALLED
NET
NET UNIT
CONTRACT
CONTRACT
NUMBER
QUANTITY 4UANTITII;S
QUANTITY
QUANTITIES
INCREASE
DECREASE P RICE
PRICE
PRICE
SE(MUNIV -(13113 [ItIMSAUUU- 9B2Uj- bU1s-iVIALO NPoo,IOU.!o «Y11 o10.VV1
ADDITIONAL WORK REQUIRED,. C,O. # 1 - SECTION IV
44000
Additional tabor, mater €ats,
and equipment to repair an
existing broken water valve
on Bay Street, per Invoice
dated 6/22112, complete as
specified
Lump
Sum
1.00
1.00
INCREASE IN
DECREASE IN
ITEM
DESCRIPTION
I
UNIT
81L) INSTALLED
NET NET UNIT
I
CONTRACT
CONTRACT
I
NUMBER
QUANTITY 4UANTITII;S
INCREASE DECREASE PRICE
pRICE
PRICE
44000
Additional tabor, mater €ats,
and equipment to repair an
existing broken water valve
on Bay Street, per Invoice
dated 6/22112, complete as
specified
Lump
Sum
1.00
1.00
$880•(}0
40001
Additional labor, materials,
and equipment to cut out
an existing main and install
a new 6" x V' tee. Plans
called for a tapping tee, but
tapping could not be used
due to oversized main, per
Invoice dated 6119112,
complete as specified
Lump
Sum
1.00
1.00
$2,464.00
40002
Additional labor, materials,
and equipment to fix
broken exlsling water main
on Boyd Street, per Invoice
dated 713112, complete as
Lump
specified
Sum
1.00
1.00
$ 2,035.23
40003
Additional labor, materials,
and equipment to repair
existing S" broken water
main on Boyd Street at
station 87 +72, per Invoice
dated 719/12, complete as
Lump
s ecified
Sum
I 1.00
1.00
$832.00
Page 19 of 21
CONTRACT: 12.07 CHANGE ORDER # 3 FINAL
ITEI,!
NUIMER
DESCRIPTION
UNIT
RID
QUANTITY
INSTALLED
QUANTITIES
NET
INCREASE
NET
DECREASE
UNIT
PRICE
INCREASEIN
CONTRACT
PRICE
DECREASEIN
CONTRACT
PRICE
40004
Construction crew down
QUANTITY
QUANTITIES
INCREASE
09CREA SI
PRICE CONTRACT
CONTRACT
time for City not being able
Feet
9D.00
120.00
PRICE
PRICE
$36.00
$1,000.00
4048
to shut down the existing
wafer main for a valve
abandonment in (he
Each
3.00
O.OD
2.00
-3.00
$342.00
$1,070.00
$1,026.00
4054
Washington Avenue and
Boyd Street Inlersectlon.
Down lime was approved
Each
1 3.00
1 6.00
3.00
$50.00
$150.00
by the Water Inspector on
s1le, per Invoice dated
7126/12, complete as
specifled
Hours
I 1.OD
1 1.00
$$728.75
ADDITIONAL WORK: C.O. # 1 (ITEMS 40000 .40003) • SU13 -TOTAL $0.00 $0.00
ADDITIONAL WORK REQUIRED: C.O. # 2 - SECTION IV (CONTRACT 12 -22)
ITEM
DESCRIPTION
UNIT
BID
INSTALED
NET
NEr
UNIF INCREASEIN
DECREASEIN
NUMBER
service relay, complete as
QUANTITY
QUANTITIES
INCREASE
09CREA SI
PRICE CONTRACT
CONTRACT
specified
Feet
9D.00
120.00
PRICE
PRICE
4036
Furnish and Install 1° water
UNIT
BIO
iNSTALlED NET
NET UNIT
INCREASEIN
CONTRACT
DECREASEIN
CONTRACT
NUMBER
service relay, complete as
Linear
DECREASE PRICE
specified
Feet
9D.00
120.00
30.00
$36.00
$1,000.00
4048
Fumish and Install 1'
corporation and stop box,
complete asspecified
Each
3.00
O.OD
2.00
-3.00
$342.00
$1,070.00
$1,026.00
4054
Furnish and install water
service clay dams,
com lete as specified I
Each
1 3.00
1 6.00
3.00
$50.00
$150.00
ADDITIONAL WORK: C.O. # 2 (ITEMS 4036 - 4064) • 5Uf3.TOTAL $1,230.00 ($1,028.00)
ADDITIONAL WORK REQUIRED: C.O. N 3 • SECTION IV (CONTRACT 12 -22)
lTEh!
DESCRIPTION
UNIT
BIO
iNSTALlED NET
NET UNIT
INCREASEIN
CONTRACT
DECREASEIN
CONTRACT
NUMBER
QUANTITY
QUANTITIES INCREASE
DECREASE PRICE
complete ass eolfed
PRICE
PRICE
40005
Furnish & Install only V1
Stop Box and Rod,
complete ass eolfed
Each
0.00
6.0D
6.00
$115.00
$590.00
40006
Furnish and install I -114"
corporation and stop box,
complete as specified
Each
0.04
2.00
2.00
$535.00
$1,070.00
Page 20 of 21
CONTRACT: 52.07 CHANGE ORDER # 3 FINAL
ITEM
NUMBER
OESCRIPTtON
UNIT
BID
INSTALLED
NET
NET
UNIT
INCREASEIN
DECREASEIN
WORK, C.O. # 3 (ITEM 40006) - SUO -TOTAL
S4,958.00
QUANTITY
QUANTITIES
INCREASE
DECREASE
PRICE
CONTRACT
CONTRACT
40007
Furnish and install -I- 5J4'
ITEM
DESCRlPrlON
UNlr
PRICE
PRICE
UNIT
water service relay.
Linear
QUANTITY C2UANTlTlES
INCREASE bECREASE
PRICE
com lele asspecified
Feet
0.00
82 00
82 00
PRICE
NET INCREASE TO SECTIONS I, 11, 111, IV, V $270,746,66
NET DECREASE TO SECTIONS 1, 11, 111, 1V, V ($232,793,18)
NET INCREASE TO CONTRACT: $37,
Page 21 of 21
539.00
i $3,198.00
ADDITIONAL
WORK, C.O. # 3 (ITEM 40006) - SUO -TOTAL
S4,958.00
$0.00
NET INCREASE TO: SECTION IV
$22,418.95
SECTION V- ELECTRICAL
ITEM
DESCRlPrlON
UNlr
BID JNSTALLED
NET NEr
UNIT
lNCREASEfN
DECR&iSEIN
QUANTITY C2UANTlTlES
INCREASE bECREASE
PRICE
CONTRACT
CONTRACT
PRICE
PRICE
50gD
pui! box - - steel, 24"x 42 ",
com fete as specified
Each
1
1.00
$575.00
5001
Communication vault -- 30"
x 48 ', complete as
s ecified
Each
6
5.00 •
$1,500.00
5002
6'x 6' Signal loan, 1' SCH
80 PVC, complete as
s ecified
Each
2
2.00
$250.00
5003
6'X 12' Signal loop, 1'
SCH 80 PVC, complete as
specified
Each
1
1.00
$275.00
5004
6'x 20' Signal loop,l' SCH
89 PVC, complete as
specified
Each
1
1.00
$350,00
5005
3' SCH 40 PVC, complete
Linear
asspecified
Feet
2,450
2,197.00
- 253.00
$5.00
$1,265.00
5006
3' SCH 80 PVC, complete
Linear
asspecified
Feet
350
374.00
24.00
$6.00
$144.00
5007
Connect to existing
manhole, complete as
specified
Each
4
4.00
$75.00
5008
Connect to existing
electrical conduit, complete
ass aciffed
Each
Each
1
1.00
$75.00
5009
6" casing pipe and boring,
com fete as specified
50.00
$100.00
SECTION V - (BID ITEMS 5000 - 5009) - SMTOTALS
$144,00
($1,285.00)
NET DECREASE= TO: SECTION V
($5,521,00)
NET INCREASE TO SECTIONS I, 11, 111, IV, V $270,746,66
NET DECREASE TO SECTIONS 1, 11, 111, 1V, V ($232,793,18)
NET INCREASE TO CONTRACT: $37,
Page 21 of 21