HomeMy WebLinkAbout12. 13-79 FEBRUARY 26, 2013 13-79 RESOLUTION (CARRIED___7-0____LOST________LAID OVER________WITHDRAWN________) PURPOSE: ACCEPT ACCESS AND DRAINAGE EASEMENT ON VACANT PARCEL SOUTH OF 2150 SOUTH WASHBURN STREET INITIATED BY: DEPARTMENT OF PUBLIC WORKS PLAN COMMISSION RECOMMENDATION: Approved BE IT RESOLVED by the Common Council of the City of Oshkosh that the proper City officials are hereby authorized and directed to accept an access and drainage easement on the vacant parcel south of 2150 South Washburn Street to facilitate the City's long term operation and maintenance of the storm water conveyance system in this area, per the attached, and to execute any and all documents necessary for purposes of same 0 O.IHK lH ON TIE WATER TO: Honorable Mayor and Members of the Common Council FROM: Darryn Burich Director of Planning Services DATE: February 21, 2013 RE: Accept Access and Drainage Easement on Vacant Parcel South of 2150 S. Washburn Street (Plan Commission recommends approval) BACKGROUND The 1.90 acre subject site is located on the east side of S. Washburn Street, approximately 1,000 feet south of W. 20th Avenue. The parcel shares frontage with U.S. Highway 41 to the functional rear of the parcel. The parcel is currently undeveloped, mainly due to a drainage way that diagonally bisects the property, making it difficult or possibly impossible to develop. The site is surrounded by industrial uses to the north, south, and west, and U.S. Highway 41 to the east. ANALYSIS The property owner contacted the Department of Public Works to determine if it would be possible to divert the existing drainage way to make the site developable. The drainage way receives storm water runoff from 100 acres of land southwest of the subject site and the owner's consultant submitted plans to the City for review which the Department of Public Works found would be able to adequately handle the flowage. To ensure the operation and maintenance of the drainage way, the City needs to acquire an access and drainage easement to allow the City legal access to the site. The Department of Public Works and the City Attorney will work with the property owner to have the appropriate easement documents prepared, signed and recorded at the Winnebago County Register of Deeds. FISCAL IMPACT None anticipated. RECOMMENDATION The Plan Commission approved of this request at its February 19, 2013 meeting. Approved, City Manager ITEM: ACCEPT DRAINAGE AND ACCESS EASEMENTS FOR PROPERTY SOUTH OF 2150 S. WASHBURN STREET Plan Commission meeting of February 19, 2013 GENERAL INFORMATION Petitioner: City of Oshkosh Department of Public Works Owner: Riviera Ventures, LLC Action Requested: The Department of Public Works is requesting the acceptance of a 15 -foot wide by approximately 600 -foot access and drainage easement located on a vacant parcel south of 2150 S. Washburn Street. Applicable Ordinance Provisions: N/A Property Location and Type: The 1.90 acre subject site is located on the east side of S. Washburn Street, approximately 1,000 feet south of W. 20"' Avenue. The parcel shares frontage with U.S. Highway 41 to the functional rear of the parcel. The parcel is currently undeveloped, mainly due to a drainage way that diagonally bisects the property, making it difficult or possibly impossible to develop. The site is surrounded by industrial uses to the north, south, and west, and U.S. Highway 41 to the east. Analysis: Riviera Ventures, LLC, the owner of the property, contacted the Department of Public Works to determine if it would be possible to divert the existing drainage way to make the site developable. The drainage way receives storm runoff from approximately 100 acres of land southwest of the subject site, The owner's consultant submitted plans to the Department of Public Works for review and Public Works found the proposal would be able to adequately handle flowage. To ensure long term operation and maintenance of the drainage way, the City needs to acquire an access and drainage easement to enable the City legal access to the site. The Department of Public Works and City Attorney is working with the property owner to have appropriate easement documents prepared, signed and recorded at the Winnebago County Register of Deeds. Staff supports the easement request as this will not have a negative impact on the surrounding properties and will prepare and enable the site for future development. RECOMMENDATION /CONDITION Staff recommends approval of the granting of the proposed drainage and access easements as requested, The Plan Commission approved of the easements as requested. The following is the Plan Commission's discussion on this item. Mr. Nau presented the item and reviewed the site and surrounding area as well as the zoning classifications and land use in said area. He explained the reasoning for the easement request which will enable the site to be developed in the future. He also reviewed the site plan for the easement. Ms. Propp questioned if this easement would possess an open drainage area. Mr. Nau responded affirmatively. Motion by Nollenberger to approve the acceptance of the drainage and access easements for property south of 2150 S. Washburn Street. Seconded by Borsuk. Motion carried 8-0. Item - Accept Easements/2100 block S Washbuni St ,7r, •a•s•a � h .� X P4 ® N! n E � � • 1 - t �• i _ {��1j 7 r 1 .✓�34� I i I 1 1� • tip •�' _ ,} �\\ !1 1- ; � hibit 7107�l7�61 1311G 161! �P'1!+�+lu y [1971 +iwwi�8'M�W!}I [thiWltiVK 1 ;T�K ]71 2 Drainage and Access Easements Parcel 91325540100 The property owner of Parcel 91325540100 wishes to reconstruct a drainage way that traverses the property, in order to make the parcel more developable. This existing drainage way receives storm water runoff from approximately 100 acres of land to the southwest of the parcel in question. The property owner contacted the Department of Public Works to discuss the potential to reconstruct the drainage way. The Department of Public Works has reviewed the proposed reconstruction, and the drainage and access easements and recommend the acceptance of these easements to facilitate the City's long term operation and maintenance of the storm water conveyance system. 3 e` rpi - c �+ 0 N - O B 1I 41 4 r e N _ war Qy: v ■ [A A X ABM ff��V cli1G i 6 TM � � v tin= 0.43mi s _ = tin =150 ft =' The City of Oshkosh crea,es and mainWas GIS maps and data for its aem use. They may show the appropmate relative location of property, boundaries and other feature from a variety of sources, HKOf Printing Date: 211/2013 D,f H These map(sydalasets are provided for lnformaSon purposes only and may not be sufficient or appropriate for legal, engineering, or surveying purposes. They are provided 'AS-IS' v ithout Prepared by_ City of Oshkosh, Wl ON Imr WATER warranties of any kind and the City of Oshkosh assumes no Labifty for use or misuse. J:1GIS4t Iann nglPlan commission Site Plan Map Temp!alelP°ian Uffrrn wn Si,,e Man Vap Temp.ate.mxd User debxahl 4 Plan Map 1 in = 0.19 mi I in = 1,000 ft Printing Date: 2/1/2013 Prepared by: City of Oshkosh, WJ QJHKO-f H ON UF WATER User, &we: IOU.�! J r JrJ�Jr Ifl The City of Oshkosh cfeates and ma nta'ns GIS maps and data for its own use. They may shah the approximate felative location of property, boundaries and other feature from a variety of sources. These map(sydatasets afe prcMed for information purposes only and may not be suffiaent or appropriate for legal, engineering, or surveying purposes. They are provded 'AS-IS' vrthout vrananties of any Knd and the City of Oshkosh assumes no liability for use or misuse. .Iir;I.S;Planninn'.Pian r'.nmmlee'hn Si+p Flan rJan TRmnla!n�Pian ('.nmm:eelnn Si!a R;..n A4an Tmmrla!P marl tin= 0.03mi 'A tin =150 ft Printing Date: 2/112013 Prepared by: City of Oshkosh, Wi o rHKOf H 04 rHF WATER �f s