Loading...
HomeMy WebLinkAboutPW CNT 12-11/CH OR #1 DEPARTMENT OF PUBLIC WORKS 215 Church Avenue P.O.Box 1130 Oshkosh,Wisconsin 54903-1130 Fax((92)236-5068 OlH<OJH ON THE WATER February 21, 2013 Mr. Steve Horn PTS Contractors, Inc. 4075 Eaton Road Green Bay, WI 54311-9340 Re: Change Order No. 1 Contract 12-11 Dear Mr. Horn: Enclosed is an executed copy of Change Order No. 1 between the City of Oshkosh and PTS Contractors, Inc. regarding the abovementioned project. If you have any questions, please call our office at (920)236-5065. Sincerely, DAA,:c0 C10 -1 David C. Patek Director of Public Works DCP/tlt Enclosure: Change Order No. 1 cc: Pam Ubrig, City Clerk (w/original) Lynn Lorenson, City Attorney (w/copy) Peggy Steeno, Finance Director(w/copy) File (w/original) 1:1Engineering\12-11 San MH Rehab-I&I Reduction ProgV'roject_Information\Contract Info\Change Orders 12-I I Page I Of I Executed CO El Ltr_2-21-13.docx TO: PTS Contractors, Inc. CHANGE ORDER# 1 4075 Eaton Road DATED: February 7, 2013 Green Bay, WI 54311-9340 Your present contract with the City of Oshkosh, Contract 12-11, awarded October 23, 2012, is hereby amended and changed as follows: NET INCREASE TO: SECTION I $5,293.62 NET INCREASE TO: SECTION II $3,438.75 NET INCREASE TO: SECTION III $0.00 NET INCREASE TO: SECTION IV $0.00 NET INCREASE TO: SECTION V $0.00 NET INCREASE TO CONTRACT $8,732.37 Section I Section II Section III Section IV Section V Totals Bid Total $790,037.42 $94,876.00 $12,512.50 $8,897.20 $4,882.50 $911,205.62 C.O.#1 $5,293.62 $3,438.75 $0.00 $0.00 $0.00 $8,732.37 Contract Total $795,331.04 $98,314.75 $12,512.50 $8,897.20 $4,882.50 $919,937.99 CITY OF OSHKOSH BY: Recommended: - City Man-. - n -1 A -1 Amu ata--Yi- Director of Public Works City Clerk A oved and accepted: Contractor I certify that provision has been made to pay the liability that will crue to the City of Oshkosh, Wisconsin, under the within Change Order. 2 I Le4 3,4- C`6mptroller Approve as to form: ' l Clttorney CONTRACT: 12-11 CHANGE ORDER#1 SECTION I-Replace Sanitary Manholes,Sections, Frames and Lids ADDITIONAL WORK REQUIRED: C.O.#1 - SECTION I INCREASE IN DECREASE IN ITEM DESCRIPTION UNIT BID INSTALLED NET NET UNIT CONTRACT CONTRACT NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE PRICE PRICE 101 4'diameter manhole riser, Linear 0.00 4.00 4.00 $337.00 $1,348.00 complete as specified. Feet 1001 Sanitary sewer main repair on Fairview. Segment was Lump 0.00 1.00 1.00 $2,265.00 $2,265.00 identified for repair by Sum televising. 1002 Storm sewer main repair on Fairview. Previously damaged CMP storm Sump 0.00 1.00 1.00 $1,130.62 $1,130.62 sewer was replaced with SDR 35. 1003 Additional sealing of the partial depth sawcuts Linear 0.00 200.00 200.00 $2.75 $550.00 added to save on concrete Feet removal. ADDITIONAL WORK:C.O.#1 -(ITEMS 101-1103)-SUB-TOTAL $5,293.62 $0.00 NET INCREASE TO: SECTION I $5,293.62 SECTION II-Sanitary Manhole Grouting(Cones&Walls) ADDITIONAL WORK REQUIRED: C.O.#1 - SECTION II ITEM BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT CONTRACT PRICE PRICE 2001 Cost to seal the sanitary manhole in the park near Hazel/Parkway intersection. Additional Sump 0.00 1.00 1.00 $3,438.75 $3,438.75 effort required than what was bid due to failed cap on an abandoned line. ADDITIONAL WORK: C.O.#1 -(ITEM 2001)-SUB-TOTAL $3,438.75 $0.00 NET INCREASE TO: SECTION II $3,438.75 NET INCREASE TO SECTIONS I,II $8,732.37 NET DECREASE TO SECTIONS I,II $0.00 NET INCREASE TO CONTRACT: $8,732.37 • Page 1 of 1