HomeMy WebLinkAbout0125583-Building (ramp)
"e
O~HKOSH
ON THE WATER
Job Address 20052007 PARKSIDE DR
CITY OF OSHKOSH No
125583
BUILDING PERMIT - APPLICATION AND RECORD
Owner ERWIN WARNKE Create Date
06/29/2007
Designer
Contractor OWNER
Category
142 - Decks, Patios, Ramps Plan
Type
. Building
o Sign
o Canopy
o Fence
o Raze
Zoning
Class of Const:
Size
Unfinished/Basement
Sq.Ft.
Sq.Ft.
Sq. Ft.
Rooms
Height
Ft.
D Projection I
Finished/Living
Canopies
Bedrooms
Stories
Signs
Garage
Baths
Foundation . Poured Concrete 0 Floating Slab
o Concrete Block 0 Post
o Pier 0 Other
o Treated Wood
Occupancy Permit Not Required
Occupancy Fee
$0.00 Flood Plain
Height Permit
# Dwelling Units
o
# Structures
o.
Park Dedication
Use/Nature :1005 Parkside/I nstalling a handicap ramp off the front of the house. A minimum of 48" of frost protection is required in addition to code
of Work om pliant handrails and guardrails. Maximum pitch is 1 :8. Landscaping is required infront of the ramp.
Plumbing Contractor
HV AC Contractor
Electric Contractor
Fees: Valuatio~ ft, _____ $2,000.00 Plan Approval
Issued By: ~
$0.00 Permit Fee Paid
$32.00 Park Dedication
$0.00
Date 06/29/2007
Final/O.P. 00/00/0000
D Permit Voided I
Parcelld # 1215610000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this perm~.. ..' ~ion w. ithin a se ent, the City. strongly urges the permit applicant to contact the easement
holder(s) and to secur~necessary ai=! roval efore starting such activity.
Signature - . .~.., Dat~
---- A entlOwner (
Address wi 54902 - 7515 Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.