Loading...
HomeMy WebLinkAbout0125583-Building (ramp) "e O~HKOSH ON THE WATER Job Address 20052007 PARKSIDE DR CITY OF OSHKOSH No 125583 BUILDING PERMIT - APPLICATION AND RECORD Owner ERWIN WARNKE Create Date 06/29/2007 Designer Contractor OWNER Category 142 - Decks, Patios, Ramps Plan Type . Building o Sign o Canopy o Fence o Raze Zoning Class of Const: Size Unfinished/Basement Sq.Ft. Sq.Ft. Sq. Ft. Rooms Height Ft. D Projection I Finished/Living Canopies Bedrooms Stories Signs Garage Baths Foundation . Poured Concrete 0 Floating Slab o Concrete Block 0 Post o Pier 0 Other o Treated Wood Occupancy Permit Not Required Occupancy Fee $0.00 Flood Plain Height Permit # Dwelling Units o # Structures o. Park Dedication Use/Nature :1005 Parkside/I nstalling a handicap ramp off the front of the house. A minimum of 48" of frost protection is required in addition to code of Work om pliant handrails and guardrails. Maximum pitch is 1 :8. Landscaping is required infront of the ramp. Plumbing Contractor HV AC Contractor Electric Contractor Fees: Valuatio~ ft, _____ $2,000.00 Plan Approval Issued By: ~ $0.00 Permit Fee Paid $32.00 Park Dedication $0.00 Date 06/29/2007 Final/O.P. 00/00/0000 D Permit Voided I Parcelld # 1215610000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this perm~.. ..' ~ion w. ithin a se ent, the City. strongly urges the permit applicant to contact the easement holder(s) and to secur~necessary ai=! roval efore starting such activity. Signature - . .~.., Dat~ ---- A entlOwner ( Address wi 54902 - 7515 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.