HomeMy WebLinkAboutPW CNT 12-05/CH OR #2Y� w —71111 :111111 w m$ c P Y� A i_n n u 4 FT-m IWIC rrr, 12 -05 Change Order #2 FINAL SECTION I - PAVING ITEM Pavement removal, Square BID INSTALLED NET NET UNIT WCREASEIN DECREASE IN NUMBER DESCRIPTIQN UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACTPRICE CONTRACT 101 Sidewalk and driveway PRICE 100 Pavement removal, Square complete asspecified Yards 12,500 11,876.00 - 624.00 $2.65 $1,653.60 101 Sidewalk and driveway removal, complete as Square specified Feet 42,800 46,805.70 4,005.70 $0.51 $2,042.91 102 Excavation, complete as Cubic specified Yards 11,050 9,996.80 - 1,053.20 $9.95 $10,479.34 103 7' non - reinforced concrete pavement, including integral curb, 5° base material, and grading, complete as specified Square Yards 21,300 20,522.90 - 777.10 $26.64 $20,701.94 104 8" non - reinforced concrete pavement, including integral curb, 6" base material, and grading, complete as specified Square Yards 1,465 0.00 - 1,465.00 $32.04 $46,938.60 105 8' concrete pavement, HES, including integral curb and 6' base material, and grading, complete as Square specified Yards 425 551.60 126.60 $35.17 $4,452.52 106 12" wide radius curb head, complete as specified linear Feet 735 700.30 -34.70 $6.06 $210.28 107 Standard 30" curb and gutter, 7" (tie-in), complete Linear asspecified Feet 255 181.70 -73.30 $18.18 $1,332.59 108 Sidewalk curb, complete Linear asspecified Feet 70 39.50 -30.50 $17.17 $523.69 109 4" concrete sidewalk, Square com fete asspecified Feet 1 16,830 23,689.00 6,859.00 $3.55 $24,349.45 110 6" concrete sidewalk and driveway, complete as Square specified Feet 32,700 30,474.00 - 2,226.00 $3.85 $8,570.10 111 8' concrete sidewalk and driveway, complete as Square specified Feet 1,050 0.00 - 1,050.00 $4.25 $4,462.50 112 3YP asphaltic concrete drivewaylpath with base, Square complete asspecified Feet 420 108.90 - 311.10 $4.56 $1,418.62 113 3%' asphaltic concrete transition with base, Square complete ass ecified Yards 775 875.30 100.30 $37.07 $3,718.12 114 Furnish and install crushed stone base course, complete as specified Tons 4,225 622.40 - 3,602.60 $6.77 $24,389.60 115 Sawing, complete as Linear s ecified Feet 1 975 1.648.50 673.50 $2.00 $1,347.00 116 Furnish and install pavement ties (epoxy 1 coated), complete as specified Each 230 306.00 76.00 $7.07 $537.32 Page 1 of 17 12 -05 Change Order #2 FINAL ITEM DESCRIPTION UNIT BID INSTALLED NET NET UNIT INCREASE IN DECREASEIN CONTRACT NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACTPRICE PRICE 117 Adjust manholes and inlets, complete as specified Each 145 126.00 - 19.00 $252.50 $4,797.50 118 Furnish and install No. 4 reinforcing bars (epoxy coated), complete as Linear specified Feet 5,460 8,078.00 2,618.00 $0.81 $2,120.58 119 Remove trees and stumps, complete as specified Inch Diameter 40 111.00 71.00 $24.24 $1,721.04 120 Remove stumps, complete Inch asspecified Diameter 20 19.00 -1.00 $15.15 $15.15 121 Furnish and install trees, complete asspecified Each 3 8.00 5.00 $232.30 $1,161.50 122 Furnish and install metal detectable warning fields, Square complete asspecified Feel 440 376.00 - 64.00 $24.24 $1,551.36 123 Terrace work on West 6' Avenue, complete as Lump specified Sum 1 1.00 $21,415.00 124 Terrace work on Rugby Street, complete as Lump s ecified Sum 1 1.00 $4,000.00 125 Terrace work on West 7'h Avenue (Ohio Street to the west), complete as Lump specified Sum 1 1.00 $3,500.00 126 Terrace work on West 71' Avenue (South Sawyer Street to Knapp Street), Lump complete asspecified Sum 1 1 1.00 $12,100.00 127 Terrace work on West I& Avenue, complete as Lump specified Sum 1 1.00 $6,700.00 128 Terrace work on Osceola Street (Pearl Avenue to the north), complete as Lump specified Sum 1 0.80 -0.20 $5,000.00 $1,000.00 129 Profile saw cut concrete curb, complete as Linear s ecified f=eel 1 10 11.80 1.80. 1 $45.00 $81.00 130 Remove, salvage, and re- install brick pavers, Square complete asspecified Feet 80 11.30 - 68.70 $14.14 $971.42 131 Excavation special, complete asspecified Tons 600 3,170.80 2,570.80 $9.10 $23,394.28 132 Furnish and install cold weather covering, 1 -layer visquine, complete as Square s ecified Yards 6,000 0.00 - 6,000.00 $0.01 560.00 133 Furnish and install cold weather covering, 2 -layer visquine, complete as Square specified Yards 6,000 0.00 - 6,000.00 1 $0.01 $60.00 Page 2 of 17 12 -05 Change Order #2 FINAL ITEM DESCRIPTION UNIT BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN CONTRACT NUMBER complete ass ecified Yards QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACTPRICE PRICE 134 Furnish and install cold Square PRICE weather covering, 2 -layer Feet 670.00 1,053.30 383.30 $1.00 $383.30 102 visquine and 6' hay, Square com lete asspecified I Yards 1 6,000 1 0.00 1 1 - 6,000.00 1 $0.01 $60.00 SECTION I - (BID ITEMS 100 -134) - SUB - TOTALS $64,925.72 ($129,196.29) ADDITIONAL WORK REQUIRED: C.O. # 1 - SECTION I (WORK FOR CONTRACT 12 -28) ITEM Pavement removal, BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN DESCRIPTION UNIT complete ass ecified Yards 2200.00 2,284.60 84.60 CONTRACT NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACTPRICE removal, complete as Square PRICE 100 Pavement removal, Square complete ass ecified Yards 2200.00 2,284.60 84.60 $5.00 $423.00 101 Sidewalk and driveway removal, complete as Square specified Feet 670.00 1,053.30 383.30 $1.00 $383.30 102 Excavation, complete as Cubic specified Yards 435.00 435.00 $11.00 103 8' concrete pavement, HES, including integral curb and 6" base material, and grading, complete as Square specified Yards 1550.00 1,756.30 206.30 $41.00 $8,458.30 104 12" wide radius curb head, complete as specified Linear Feet 80.00 79.40 -0.60 $12.15 $7.25 105 Standard 24" curb and gutter, 8" (tie -in), complete Linear asspecified Feet 45.00 21.90 -23.10 $23.00 $531.30 106 6" concrete sidewalk and driveway, complete as Square specified Feet 845.00 1,124.30 279.30 $4.50 $1,256.85 107 4' asphaltic concrete pavement with base, Square complete asspecified Yards 790.00 469.60 - 320.40 $28.10 $9,003.24 108 Furnish and install crushed stone base course, complete as specified Tons 150.00 0.00 - 150.00 $10.00 $1,500.00 109 Sawing, complete as Linear specified Feet 1050.00 985.00 -65.00 $3.00 $195.00 110 Furnish and install pavement ties (epoxy - coated), complete as specified Each 310.00 316.00 6.00 $6.15 $36.90 111 Adjust manholes and inlets, complete as s ecified Each 12.00 14.00 2.00 $500.00 $1,000.00 112 Furnish and install metal detectable warning fields, Square complete asspecified Feet 24.00 24.00 $23.00 113 Terrace work on Ceape Avenue, complete as Lump specified Sum 1.00 1.00 $1,000.00 114 Terrace work on Commerce Street, Lump com fete ass ecified Sum 1.00 1.00 $1.000.00 115 Rout and seal existing crack, complete as Linear specified Foot 12.00 97.60 85,60 $3.00 $256.80 Page 3 of 17 12 -05 Change Order #2 FINAL ITEM DESCRIPTION UNIT BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN CONTRACT NUMBER BID INSTALLED QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE PRICE 116 Furnish and install cold INCREASE DECREASE PRICE CONTRACTPRICE CONTRACT PRICE $24.00 $412.80 PRICE 122 weather covering, 1 -layer Square 2036 visqulne, complete as Square 0.00 948.60 948.60 -94.00 $1.00 $948.60 $4,136.00 s ecified Yards 1 484.00 1,013.50 529.50 1 $1.00 $529.50 117 Furnish and install cold Linear 2042 weather covering, 2 -layer Feet 1,350 1,321.30 -28.70 $47.00 $1,348.90 visquine, complete as Square specified Yards 484.00 0.00 - 484.40 $2.00 $968.00 118 Furnish and install cold Feet 1,875 1,869.90 -5.10 $51.00 $260.10 weather covering, 2 -layer visquine and 6° hay, Square 2054 com lets asspecified Yards 1 484.00 0.40 - 484.00 $3.00 $1,452.00 119 Retaining wail, complete Linear asspecified Feet 38.00 38.00 $60.00 120 Standard 18" Type "B" Feet 1,050 976.70 -73.30 $59.00 $4,324.70 curb, complete as Linear specified Feet 35.00 36.10 1.10 $25.00 $27,50 ADDITIONAL•., WORK: C.O. # 1 - (ITEMS 100 -120) - SUB -TOTAL $12,372.15 ($13,656.83) ADDITIONAL WORK REQUIRED: C.O. # 2 - SECTION I 121 sidewalk curb ne corner DECREASE IN ITEM ITEM BID INSTALLED NET NET UNIT INCREASE IN UNIT I NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACTPRICE CONTRACT PRICE 121 sidewalk curb ne corner DECREASE IN ITEM Ceape and Commerce Linear BID INSTALLED NET NET UNIT I INCREASE IN CONTRACT NUMBER Street Feet 0 17.2 17.20 DECREASE $24.00 $412.80 PRICE 122 Reinforcing for loading bay Square 2036 concrete (city Portion) Feet 0.00 948.60 948.60 -94.00 $1.00 $948.60 $4,136.00 ADDITIONAL WORK: C.O. 4 2 - (ITEMS 121 -122) - SUB -TOTAL $1,361.40 $0.00 NET DECREASE TO: SECTION 1 ($84,193.85) SECTION II - STORM SEWER Page 4 of 17 Utility Line Opening (ULO), DECREASE IN ITEM DESCRIPTION UNIT BID INSTALLED NET NET UNIT I INCREASE IN CONTRACT NUMBER Furnish and install 12" QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE PRICE Page 4 of 17 Utility Line Opening (ULO), 2014 complete asspecified Each 5 1.00 -4.00 $300.00 $1,200.00 Furnish and install 12" storm sewer, complete as Linear 2036 s ecifed Feet 1,075 981.00 -94.00 $44.00 $4,136.00 Furnish and install 15" storm sewer, complete as Linear 2042 specified Feet 1,350 1,321.30 -28.70 $47.00 $1,348.90 Furnish and install 18" storm sewer, complete as Linear 2048 specified Feet 1,875 1,869.90 -5.10 $51.00 $260.10 Furnish and install 21" storm sewer, complete as Linear 2054 specified Feet 350 326.00 -24.00 $56.00 $1,344.00 Furnish and install 24" storm sewer, complete as Linear 2060 specified Feet 1,050 976.70 -73.30 $59.00 $4,324.70 Page 4 of 17 12 -05 Change Order #2 FINAL ITEM DESCRIPTION UNIT BID INSTALLED NET NET UNIT INCREASE IN DECREASEIN CONTRACT NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACTPRICE PRICE Furnish and install 27" storm sewer, complete as Linear 2066 specified Feet 875 855.30 -19.70 $67.00 $1,319.90 Furnish and install Tx 6' box culvert storm sewer, Linear 2172 complete asspecified Feet 250 251.40 1.40 $355.00 $497.00 Furnish and install Tx 6' box culvert storm sewer with manhole or inlet riser, Linear 2220 complete ass pacified Feet 40 35.00 -5.00 $355.00 $1,775.00 Furnish and install 6" storm lateral, complete as Linear 2280 specified Feet 5,000 4,846.10 - 153.90 $31.00 $4,770.90 Furnish and install 8" storm lateral, complete as Linear 2282 specified Feet 40 60.90 20.90 $50.00 $1,045.00 Furnish and install storm sewer marker balls, 2284 1complete asspecified Each 311 316.00 5.00 $20M $100.00 Furnish and install clay dams, complete as 2286 specified Each 158 156.00 - 2.00 $50.00 $100.00 Furnish and install lateral 2288 inlet, complete asspecified Each 158 939.00 - 19.00 $330.00 $6,270.00 Furnish and install standard storm manhole (4' diameter), complete as Vertical 2532 specified Feet 119 127.41 8.41 $285.00 $2,396.85 Furnish and install standard storm manhole (5' diameter), complete as Vertical 2534 specified Feet 24 23.53 - 0.47 $350.00 $164.50 Furnish and install standard storm inlet manhole (4' diameter), Vertical 2556 complete asspecified Feet 6 4.96 -1.04 $300.00 $312.00 Furnish and install standard storm manhole riser (4' diameter), Vertical 2584 complete asspecified Feet 2 4.99 2.99 $250.00 $747.50 Furnish and install Type 1 2612 inlet, complete asspecified Each 4 3.00 -1.00 $1,425.00 $1,425.00 Furnish and install Type 3 inlet (with 18" sump), 2614 complete asspecified Each 62 60.00 -2.00 $1,450.00 $2,900.00 Furnish and install Type 3 inlet riser, complete as 2618 specified Each 4 4.00 $300.00 Connect to existing storm sewer, complete as 2800 specified Each 5 5.00 $300.00 Connect to existing storm lateral, complete as 2802 specified Each 45 0.00 -45.00 $100.00 $4,500.00 Connect to existing manhole, complete as 2806 Ispecified Each 12 12.00 $500.00 Connect to existing inlet, 2808 com lete asspecified Each 2 2.00 $400.00 Page 5ot17 12 -05 Change Order #2 FINAL ITEM DESCRIPTION UNIT BID INSTALLED NET NET UNIT INCREASEIN DECREASEIN CONTRACT NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACTPRICE PRICE Abandon 8" - 12" storm Each QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACTPRICE $3,000.00 2036 sewer, complete as linear PRICE 2820 specified Feet 700 700.00 $4.00 Abandon 15" and larger Feet 120.00 113.50 -6.50 $90.00 $585.00 2048 storm sewer, complete as Ispecified Linear 2822 Feet 600 600.00 $12.00 Remove 30" and smaller f=eet 1 30.00 23.50 -6.50 $103.00 5669.50 2080 storm sewer, complete as Linear 2824 specified Feet 1,100 1,100.00 $15.00 Abandon storm manholes Linear and inlets, complete as Feet 12.00 12.00 $165.00 2830 specified Each 20 20.00 $250.00 Remove storm manholes Linear and inlets, complete as Feet 1 114.00 100.90 -13.10 $250.00 $3,275.00 2832 specified Each 10 10.00 $250.00 Furnish, install, maintain, and remove Type D Linear modified inlet protection, Feet 36.00 40.00 4.00 $700.00 $2,800.00 2858 complete asspecified Each 204 102.00 - 102.00 $60.00 $6,120.00 Sediment removal -Type Linear D modified inlet protection, Feet 125.00 109.40 -15.60 $415.00 $6,474.00 2860 complete asspecified Each 204 0.00 - 204.00 $5.00 $1,020,00 Furnish, install, maintain, and remove stone bag, 2866 Icomplete asspecified Each 50 0.00 -50.00 $10.00 $500.00 Rock excavation, complete Cubic 2960 1 asspecified Yards 50 0.00 -50.00 $0.01 $0.50 SECTION II - (BID ITEMS 2014 - 2960) - SUB - TOTALS $4,786.35 ($43,791.50) ADDITIONAL WORK REQUIRED: C.O. # 1 - SECTION Il (WORK FORM CONTRACT 12 -28) 2014 Storm sewer utility line DECREASE. ITEM DESCRIPTION UNIT BID INSTALLED NET NET UNIT INCREASEIN CONTRACT Each QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACTPRICE $3,000.00 2036 Furnish and install 12" PRICE 2014 Storm sewer utility line opening (ULO), complete asspecified Each 5.00 0.00 -5.00 $600.00 $3,000.00 2036 Furnish and install 12" storm sewer, complete as Linear specified Feet 120.00 113.50 -6.50 $90.00 $585.00 2048 Furnish and install 18" storm sewer, complete as Linear s ecified f=eet 1 30.00 23.50 -6.50 $103.00 5669.50 2080 Furnish and install 36" RCP Class III Storm Sewer, complete as Linear specified Feet 12.00 12.00 $165.00 2102 Furnish and install 60" storm sewer, complete as Linear s ecified Feet 1 114.00 100.90 -13.10 $250.00 $3,275.00 2103 Furnish and install structurally- supported 60" storm sewer, complete as Linear specified Feet 36.00 40.00 4.00 $700.00 $2,800.00 2172 Furnish and install 3'x 6' box culvert storm sewer, Linear complete asspecified Feet 125.00 109.40 -15.60 $415.00 $6,474.00 Page 6 of 17 12 -05 Change Order #2 FINAL trEM DESCRIPTION UNIT BID 1NS7ALLED NET NET UNIT INCREASElN DECREASEIN CONTRACT NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACTPRICE PRICE 2220 Furnish and install 3'x6' box culvert storm sewer w/ manhole or inlet riser, Linear complete asspecified Feet 8.00 7.00 - 1.00 $435.00 $435.00 2287 Furnish and install bentonite slurry dam, complete asspecified Each 1.00 1.00 $2,000.00 2556 Furnish and install standard storm inlet manhole (4' diameter), Vertical com lets asspecified Feet 3.00 3.49 0.49 $300.00 $147.00 2580 Furnish and install storm junction chamber, complete asspecified Each 3.00 3.00 $17,000.00 2584 Furnish and install standard storm manhole riser (4' diameter), Vertical complete asspecified Feet 2.00 1.30 -0.70 $300.00 $210.00 2596 Furnish and install storm in line tee base manhole, cam lete ass ecified Each 1.00 1.00 $15,000.00 2614 Furnish and install Type 3 inlet (with 18" sump), com lete ass ecified Each 3.00 3.00 $1,550.00 2616 Furnish and install Type 3 inlet, complete asspecified Each 1.00 1 .00 $1,500.00 2800 Connect to existing storm sewer, complete as specified Each 1.00 1.00 $300.00 2806 Connect to existing manhole, complete as specified Each 1.00 1.00 $500.00 2824 Remove 30" and smaller storm sewer, complete as Linear specified Feet 125.00 114.00 -11.00 $20.00 $220.00 2826 Remove 33" - 60" storm sewer, complete as Linear specified Feet 190.00 178.00 - 12.00 $22.00 $264.00 2832 Remove storm manholes and inlets, complete as s ecified Each 7.00 7.00 $300.00 2858 Furnish, install, maintain, and remove Type D modified inlet protection, com fete ass ecified Each 22.00 20.00 - 2.00 $85.00 $170.00 2860 Sediment removal - Type D modified inlet protection, comp lete asspecified Each 22.00 20.00 -2.00 $5.00 $10.00 2866 Furnish, install, maintain, and remove stone bag, complete asspecified Each 50.00 0.00 - 50.00 $10.00 $500.00 Page 7 of 17 12 -05 Change Order #2 FINAL ITEM DESCRIPTION UNIT BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN CONTRACT NUMBER storm lateral (Contract 12- Linear QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE 28), com fete asspecified Feet 0.00 10.50 10.50 $40.00 $420.00 PRICE 2964 Over excavation, complete Cubic asspecified Yards 150.00 16.00 - 134.00 $25.00 $3,350AO ADDITIONAL WORK: C.O. # 1 - (ITEMS 2014 - 2964) - SUB -TOTAL ADDITIONAL WORK REQUIRED: G.O. # 2 - SECTION II $2,947.00 ($19,162.50) ITEM I BID I INSTALLED, NET NET UIT INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT QUANTI TY QUANTITIES I !N REASE l DECREASE I PRICE I CONTRACT PRICE CONRTRACT 2280 Furnish and install 476" storm lateral (Contract 12- Linear 28), com fete asspecified Feet 0.00 10.50 10.50 $40.00 $420.00 2284 Furnish and install storm sewer marker balls (Contract 12 -28), complete asspecified Each 0.00 6.00 8.00 $20.00 $120.00 2800 Connect to existing storm sewer for parking garage (Contract 12 -28), complete asspecified Each 0.00 1.00 1.00 $1,450.00 $1,450.00 2802 Connect to existing 4" and 6" storm laterals for City Center Hotel (Contract 12- 28), complete asspecified Each 0.00 2.00 2.00 $900.00 $1,800.00 20000 Additional labor, equipment, and materials to replace an existing storm inlet that was in conflict with the proposed construction, complete as Lump specified Sum 0.00 1.00 1.00 $1,350.00 $1,350.00 20001 Additional labor, equipment, and materials to relay 33 linear feet of new 15" storm sewer in grass at UW -O's parking structure. Crew had to cut into new box culvert and re- route storm main, Lump com fete asspecified Sum 0.00 1.00 1.00 $6,542.50 $6,542.50 20002 Additional labor, equipment, and materials to install and connect a 2" PVC drain for the UW -O's steam tunnel fromsump pump pit discharge to storm inlet 0 -18, complete Lump asspecified Sum 0.00 1.00 1.00 $2,180.00 $2,180.00 20003 Additional labor and materials to remove an existing storm manhole on Osceola Street thatwas in conflict with the proposed box culvert, complete as Lump s ecifed I Sum 1 0.00 1 1.00 1 1.00 1 $945.00 1 $945.00 Page 8 of 17 12 -05 Change Order #2 FINAL ITEM DESCRIPTION UNIT BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN CONTRACT NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE PRICE 20004 Additional labor, Feet 5,100 4,817.20 - 282.80 $62,00 PRICE equipment, and materials to remove and cap storm Linear 3004 lateral, locate and conect Feet 35 23.50 -11.50 $100.00 $1,150.00 existing storm lateral at 1044 West 1othAvenue, Lump 3060 complete as s ecifed Sum 0.00 1.00 1.00 -4.63 $2,550.00 $2,550.00 $1,852.00 20005 Additional labor, equipment, and materials to rebuild a storm manhole Vertical 3100 in Sawyer Street west of Feet 235 232.12 -2.88 $220.00 $633.60 7th Avenue, that was determined by the City to 3114 be in poor condition and Each 25 23.00 -2.00 $455.00 $910.00 added to the contract, Lump complete asspecified Sum 0.00 1.00 1.00 $1,162.50 $1,162.50 20006 Additional labor to core drill 3116 Ispecified a 2" hole in the box culvert Each 2 0.00 -2.00 $405.00 $810.00 for the UW- Oshkosh sump pump line from the stream 3118 tunnels, complete as Lump 2 0.00 -2,00 $300.00 $600.00 specified I Sum 0.00 1.00 1.00 $675.00 $675.00 ADDITIONAL_ WORK: C.O. It 2 - (ITEMS 2280 - 20006) - SUB-TOTAL $19,195.00 $0.00 NET DECREASE TO: SECTION It ($36,025.65) SECTION III - SANITARY SEWER 17EM Furnish and install 8" B!D INSTALLED NET NET UNIT INCREASEIN DECREASE IN NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRdCTPRICE CONTRACT 3000 complete asspecified Feet 5,100 4,817.20 - 282.80 $62,00 PRICE Page 9 of 17 Furnish and install 8" sanitary sewer relay, Linear 3000 complete asspecified Feet 5,100 4,817.20 - 282.80 $62,00 $17,533.60 Furnish and install 12' sanitary sewer relay, Linear 3004 complete asspecified Feet 35 23.50 -11.50 $100.00 $1,150.00 Furnish and install 8° sanitary sewer drop, Vertical 3060 complete asspecified Feet 18 13.37 -4.63 $400.00 $1,852.00 Furnish and install standard sanitary manhole (4' diameter), complete as Vertical 3100 Ispecified Feet 235 232.12 -2.88 $220.00 $633.60 Furnish and install external manhole chimney seal, 3114 complete asspecified Each 25 23.00 -2.00 $455.00 $910.00 Furnish and install external manhole chimney seal extension, complete as 3116 Ispecified Each 2 0.00 -2.00 $405.00 $810.00 Furnish and install internal manhole chimney seal, 3118 complete asspecified Each 2 0.00 -2,00 $300.00 $600.00 Furnish and install 8" x 6" factory wyes or tees, 3210 com late asspecified Each 155 153,00 -2.00 $95.00 $190.00 Page 9 of 17 12 -05 Change Order #2 FINAL ITEM DESCRIPTION UNIT BID INSTALLED NET NET UNIT INCREASEIN DECREASEIN CONTRACT NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE PRICE Furnish and install 6' "Insert -A -Tee" or "Kor -N- Seal", complete as 3222 ispecified Each 1 2 2.00 1 $225.00 Furnish and install 4' sanitary laterals new, Linear 3230 complete asspecified Feet 40 0.00 -40.00 $60.00 $2,400.00 Furnish and install 4' sanitary riser new, Linear 3231 complete asspecified Feet 2 0.00 -2.00 $70.00 $140.00 Furnish and install 4 °!6" sanitary lateral relay, Linear 3234 complete asspecified Feet 4,500 4,865.70. 365.70 $59.00 $21,576.30 Furnish and install 4'16" sanitary riser relay, Linear 3235 complete asspecified Feet 215 214.00 -1.00 $70.06 $70.00 Furnish and install sanitary lateral marker balls, 3236 complete asspecified Each 310 321.00 11.00 $20.00 $220.00 Furnish and install clay dams, complete as 3238 specified Each 160 152.00 -8.00 $65.00 $520.00 Furnish and install connections to existing 8" mains, complete as 3300 specified Each 8 10.00 2.00 $500.06 $1,000.00 Furnish and install connections to existing 12" mains, complete as 3304 specified Each 4 4.00 $640.OD Core into existing manhole, complete as 3332 specified Each 2 1.00 -1.00 $600.00 $600.00 Rock excavation, complete Cubic 3600 asspecified Yards 50 0.00 -50.00 $0.01 $0.50 Televise sanitary sewer, Linear 3700 complete asspecified Feet 5,135 4,837.10 - 297.90 $1.50 $446.85 Abandon sanitary manholes, complete as 3800 specified Each 16 16.00 $400.00 Abandon 8" sanitary sewer, complete as Linear 3802 specified Feet 3,060 3,060.00 $3.00 Abandon 10' sanitary sewer, complete as Linear 3804 s eeifiied Feet 490 490.00 $3.50 Abandon 12' sanitary sewer, complete as Linear 3806 specified Feet 200 200.00 $4.00 Page 10 of 17 12 -05 Change Order #2 FINAL ITEM DESCRIPTION UNIT BID INSTALLED NET NET UNIT INCREASEIN DECREASEIN CONTRACT NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT NUMBER complete ass ecifed Feet QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE PRICE 3002 Remove sanitary sewer, Linear PRICE 3850 complete asspecified Feet 230 333.00 103.00 $18.00 $1,854.00 SECTION III - (BID ITEMS 3000 - 3850) - SUB- TOTALS $24,650.30 ($27,856.55) ADDITIONAL WORK REQUIRED: C.O. # 1 - SECTION HI (WORK FOR CONTRACT 12 -28) ITEM Furnish and install 8" BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN DESCRIPTION UNIT I CONTRACT NUMBER complete ass ecifed Feet QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE 3002 Furnish and install 10" PRICE 3000 Furnish and install 8" sanitary sewer relay, Linear complete ass ecifed Feet 5.00 52.00 47.00 $130.00 $6,110.00 3002 Furnish and install 10" sanitary sewer relay, Linear complete asspecified Feet 90.00 85.10 -4.90 $100.00 $490.00 3015 Furnish and install 33" sanitary sewer relay, Linear complete asspecified Feet 10-00 10.00 $150.00 3100 Furnish and install standard sanitary manhole (4' diameter), complete as Vertical specified Feet 7.00 7.07 0.07 $300.00 $21.00 3102 Furnish and install standard sanitary manhole (5' diameter), complete as Vertical s ecified Feet 1 7.00 6.53 -0.37 $500.00 $185.00 3114 Furnish and install external manhole chimney seal, complete asspecified Each 2.00 0.00 -2.00 $350.00 $700.00 3116 Furnish and install external manhole chimney seal extension, complete as specified Each 2.00 1.00 -1.00 $300.00 $300.00 3222 Furnish and install 6" "Insert-A -Tee" or "Kor -N- Seal", complete as s ecified Each 1.00 1.00 $200.00 3234 Furnish and install 4'16" sanitary lateral relay, Linear ]complete asspecified Feet 5.00 2.00 - 3.00 $120.00 $360.00 3236 Furnish and install sanitary lateral marker balls, complete asspecified Each 2.00 1.00 - 1.00 $20.00 520-00 3300 Furnish and install connections to existing 8" mains, complete as specified Each 1.00 2,00 1.00 $500.00 $600.00 3302 Furnish and install connections to existing 10" mains, complete as specified Each 1.00 1.00 $700.00 3315 Furnish and install connections to existing 33" mains, complete as Spec led Each 3.00 4.00 1.00 $1,000.00 $1,000.00 3408 Furnish and install 16" open cut casing pipes, Linear complete as specified Feet 25.00 20.00 -5.00 $120.00 $600.00 Page 11 of 17 12 -05 Change Order #2 FINAL ITEM Furnish and install internal BID INSTALLED NET NET UNIT 1NCREASEIN DECRE4SEIN NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACTPRICE CONTRACT NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE I DECREASE I PRICE CONTRACTPRICE PRICE 3700 Televise sanitary sewer, Linear 0.00 2.00 2.00 $300.00 $600.00 PRICE 30000 com late ass ecified Feet 105.00 147.10 42.10 $3.00 $126.30 3800 Abandon sanitary manholes, complete as s ecified Each 1 1.00 1.00 1 $400.00 3802 Abandon 8" sanitary sewer, complete as Linear 0.00 2.50 2.50 $1,055.00 $2,637.50 30001 specified Feet 25.00 25.00 $8.00 3817 Abandon 33" sanitary sewer, complete as Linear specified Feel 90.00 90.00 $20.00 3850 Remove sanitary sewer, Linear complete asspecified Feet 1 75.00 75.00 $20.00 ADDITIONAL WORK: C. O. # 1 - (ITEMS 3000 -3850) - SUB -TOTAL $7,857.30 ($2,655.00) ADDITIONAL WORK REQUIRED: C.O. # 2 - SECTION III 3118 Furnish and install internal DECREASEIN ITEM chimney seals (Contact 12- BID INSTALLED NET NET UNIT INCREASEIN NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE I DECREASE I PRICE CONTRACTPRICE CONTRACT Each 0.00 2.00 2.00 $300.00 $600.00 PRICE 3118 Furnish and install internal chimney seals (Contact 12- 28), complete as specified Each 0.00 2.00 2.00 $300.00 $600.00 30000 Additional time to excavate around double gas laterals and install sanitary sewer laterals at 10 locations, complete as specified Hours 0.00 2.50 2.50 $1,055.00 $2,637.50 30001 Additional labor, equipment, and materials to adjust existing back - pitched sanitary manhole in the intersection of West 6th Avenue & Ohio Street, complete as specified Lump Sum 0.00 1.00 1.00 $2,665.00 $2,665.00 30002 Additional labor, equipment, and materials to remove and replace sanitary manhole in the intersection of West 6th Avenue & Ohio Street, Lump complete as specified Sum 0.00 1.00 1.00 $5,275.00 $5,275.00 30003 Additional labor and equipment to remove concrete encasement around electricial duct package that was in conflict with the proposed sanitary sewer (Contract 12 -28), complete as Lump specified Sum 0.00 1.00 1.00 $2,110.00 $2,110.00 30004 Additional labor, equipment, and materials to abandon three sanitary laterals on Commerce Street (Contract 12 -28), Lump complete as specified Sum 0.00 1.00 1.00 $1,350.00 $1,350.00 Page 12 of 17 12 -05 Change Order #2 FINAL ITEM DESCRIPTION UNIT SID INSTALLED NET NET UNIT INCREASE IN DECREASE IN CONTRACT NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACTPRICE CONTRACT NUMBER poly wrap relay, complete Linear QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACTPRICE PRICE 30005 City agreed to split cost of Feet 285 280.00 -5.00 $74.00 PRICE 4004 repairs to fix missed sanitary lateralat 959 W. 6th Ave, for work Lump performed on 12/11/12 Sum 0.00 1.00 1.00 - 305.50 $957.50 $957.50 $19,552.00 ADDITIONAL WORK: C. O. # 2 - (ITEMS 3118 - 30006) - SUB -TOTAL $15,595.00 $0.00 NET INCREASE TO: SECTION Ilf $17,591.05 SECTION IV - WATER MAIN ITEM Furnish and install 6" BID INSTALLED NET NET UNIT INCREASEIN DECREASEIN DESCRIPTION UNIT I I CONTRACT NUMBER poly wrap relay, complete Linear QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACTPRICE asspecified Feet 285 280.00 -5.00 $74.00 PRICE 4002 Furnish and install 6" ductile iron water main with poly wrap relay, complete Linear asspecified Feet 285 280.00 -5.00 $74.00 $370.00 4004 f=urnish and install 8' ductile iron water main with poly wrap relay, complete Linear asspecified Feet 4,430 4,124.50 - 305.50 $64.00 $19,552.00 4008 Furnish and install 12' ductile iron water main with poly wrap relay, complete Linear asspecified Feet 1,015 829.50 - 185.50 $90.00 $16,695.O0 4036 Fumish and install 1' water service relay, complete as Linear specified Feet 3,900 4,692.00 792.00 $51.00 $40,392.00 4038 Furnish and install 1'/2' water service relay, Linear cam fete ass ecified Feet 25 16.00 -9.00 $68.00 $612.00 4042 Furnish and install 1' water service new, complete as Linear specified Feet 30 0.00 -30.00 $52.00 $1,560.00 4046 Furnish and install 2° water service new, complete as Linear s ecified Feet 30 23.00 -7.00 $70.00 $490.00 4048 Furnish and install 1' corporation and stop box, complete asspecified Each 159 149.00 -10.00 $250.00 $2,500.00 4050 Furnish and install 1'h' corporation and stop box, complete asspecified Each 1 1.00 $550.00 4052 f=urnish and install 2' corporation and stop box, com fete ass ecified Each 1 1.00 $700.00 4054 Furnish and install water service clay dams, com fete ass ecified Each 160 151.00 - 9.00 $50.00 $450.D0 4058 Furnish and install connections to existing 6" water main, complete as s ecified Each 4 6.00 2.00 $900.00 $1,800.00 4060 Furnish and install connections to existing 8" water main, complete as s ecified Each 1 6 1 6.00 1 1 1 $1,100.00 Page 13 of 17 12 -05 Change Order #2 FINAL ITEM DESCRIPTION UNIT BID INSTALLED NET NET UNIT INCREASE IN DECREASEIN CONTRACT NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE PRICE 4064 Furnish and install connections to existing 12" water main, complete as ,specified Each 2 4.00 2.00 $1,300.00 $2,600.00 4110 Furnish and install 8" x 6" tee, complete asspecified Each 11 9.00 -2.00 $380.00 $760.00 4111 Furnish and install 8" x 8" tee, complete asspecified Each 3 2.00 -1.00 $450.00 5450.00 4128 Furnish and install 12" x 6" tee, complete asspecified Each 4 3.00 -1.00 $650.00 $650.00 4129 Furnish and install 12" x 8" tee, complete asspecified Each 2 1.00 - 1.00 $675.00 $675.00 4236 Furnish and install 6° 45° bend, complete as specified Each 9 31.00 22.00 $210.00 $4,620.00 4237 Furnish and install 8' 45° bend, complete as specified Each 9 7.00 -2.00 $250.00 $500.00 4239 Furnish and install 12'45' bend, complete as specified Each 3 2.00 -1.00 $550.00 $550.00 4264 Furnish and install 8" x 6" reducer, complete as specified Each 6 5.00 - 1.00 $225.00 $225.00 4401 Furnish and install 6" gate valve, complete as s ecified Each 12 14.00 2.00 $1,050.00 $2,100.00 4402 Furnish and install 8" gate valve, complete as specified Each 12 14.00 2.00 $1,400.00 $2,800.00 4404 Furnish and install 12° gate valve, complete as specified Each 5 4.00 -1.00 $2,450.00 $2,450.00 4419 Furnish and install 6" x 6" tapping valve & sleeve, complete asspecified Each 2 1.00 -1.00 $2,200.00 $2,200.00 4500 Furnish and install hydrant, com late ass ecified Each 14 12.00 -2.00 $2,900.00 $5,800.00 4504 Furnish and install gradelok for hydrant branches, complete as specified Each 14 O.OD -14.00 $0.01 $0.14 4900 Abandon water main on West 6L' Avenue, complete Lump ass ecified sum 1 1.00 $3,900.00 4902 Abandon water main on West 7t' Avenue (Ohio Street to the west), Lump complete asspecified sum 1 1.00 $1,000.00 4904 Abandon water main on West 7h Avenue (South Sawyer Street to Knapp Street), complete as Lump s ecified sum 1 1.00 $2,100.00 4906 Abandon water main on West 100' Avenue, Lump complete asspecified sum 1 1.00 $1,500.00 Page 14 of 17 12 -05 Change Order #2 FINAL ITEM DESCRIPTION UNIT BID INSTALLED NET NET UNIT INCREASEIN DECREASE IN CONTRACT NUMBER ductile iron water main QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACTPRICE relay with poly wrap, Linear PRICE 4920 Remove water main, Linear 10.00 19.50 9.50 $110.00 $1,045.00 4002 com Eete ass ecified Feet 535 510.00 -25.00 $20.00 $500.00 SECTION IV - (BID ITEMS 4002 -4920) - SUB- TOTALS $54,312.00 ($56,989.14) ADDITIONAL WORK REQUIRED: C.O. # 1 - SECTION IV (WORK FOR CONTRACT 12 -28) ITEM DESCRIPTION UNIT BID INSTALLED I NET NET UNIT INCREASEIN DECREASEIN CONTRACT NUMBER ductile iron water main QUANTITY QUANTITIES IN DECREASE PRICE CONTRACT PRICE relay with poly wrap, Linear PRICE 4000 Furnish and install 4" ductile iron water main relay with poly wrap, Linear complete asspecified Feet 10.00 19.50 9.50 $110.00 $1,045.00 4002 Furnish and install 6" ductile iron water main relay with poly wrap, Linear com lete asspecified Feet 10.00 13.00 3.00 $120.00 $360.00 4004 Furnish and install 8" ductile iron water main relay with poly wrap, Linear complete asspecified Feet 45.00 50.80 5.80 $120.00 $696.00 4008 Furnish and install 12" ductile iron water main relay with poly wrap, Linear complete asspecified Feet 325.00 337.00 12.00 $125.00 $1,500.00 4036 Furnish and install 1" water service relay, complete as Linear specified Feet 100.00 90.00 -10.00 $85.00 $850.00 4048 Furnish and install 1" corporation and stop box, complete asspecified Each 1.00 1.00 $300.00 4054 Furnish and install water service clay dams, complete asspecified Each 1.00 1.00 $85.00 4056 Furnish and install connections to existing 4" water mainr complete as specified Each 1.00 1.00 $1,300.00 4058 Furnish and install connections to existing 6" water main, complete as specified Each 1.00 1.00 $1,400.00 4060 Furnish and install connections to existing 8" water main, complete as specified Each 2.00 2.00 $1,500.00 4084 Furnish and install connections to existing 12" water main, complete as s ecified Each 2.00 2.00 $2,000.00 4127 Furnish and install 12" x 4" tee, complete asspecified Each 1 .00 1.00 $600.00 4129 Furnish and install 12" x 8" tee, complete ass ecified Each 2.90 2.00 $700.00 4131 Furnish and install 12"x 12" tee, complete as L$850.00 specified Each 1.00 1.00 Page 15 of 17 12 -05 Change Order #2 FINAL ITEM DESCRIPTION UNIT BID INSTALLED NET NET UNIT INCREASE IN DECREASEIN CONTRACT NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACTPRICE PRICE 4221 Furnish and install 12" Each QUANTITY QUANTITIES INCREASE PRICE CONTRACT PRICE PRICE 4101 11Y; bend, complete as specified Each 4.00 2.00 -2.00 $500.00 $1,000.00 4235 Furnish and install 4" 45° Each 0.00 1.00 1.00 $350.00 $350.00 4230 bend, complete as specified Each 2.00 2.00 $150.00 4236 Furnish and install 6" 45° Each 0.00 1.00 1.00 $500.00 $500.00 40000 bend, complete as specified Each 4.00 2.00 -2.00 $200.00 $400.00 4237 Furnish and install 8" 45° bend, complete as specified Each 4.00 4.00 $300.00 4239 Furnish and install 12" 45° Hours 1 0.00 2.50 2.50 1 1 $1,055.00 1 $2,637.50 bend, complete as specified Each 10.00 9.00 -1.00 $570.00 $570.00 4269 Furnish and install 12" x 6" reducer, complete as specified Each 1.00 1.00 $370.00 4400 Furnish and install 4" gate valve, complete as s ecified Each 1 1.00 1.00 $1,000.00 4402 Furnish and install 8" gate valve, complete as specified Each 2.00 2.00 $1,550.00 4404 Furnish and install 12" gate valve, complete as specified Each 4.00 3.00 - 1.00 $2,600.00 $2,600.00 4712 Furnish and install 2" steel casing pipe, complete as Linear specified Feet 20.00 20.00 $50.00 4728 Furnish and install 20" steel casing pipe, Linear com fete asspecified Feet 1 20.00 20.04 1 $150.00 4900 Abandon water main on Ceape Avenue, complete Lump asspecified Sum 1.00 1.00 $800.00 4920 Remove water main, Linear complete asspecified Feet 90.00 114.00 24.00 $20.00 $480.00 ADDITIONAL WORK: C.O. # 2 (ITEMS 4000. 4920) - sus -TOTAL $4,081.00 ($5,420.00) ADDITIONAL WORK REQUIRED: C.O. # 2 - SECTION 1V ITEM Furnish and install BID INSTALLED NET NET NET UNIT INCRWEIN DECREASE IN DESCRIPTION UNIT I CONTRACT NUMBER complete asspecified Each QUANTITY QUANTITIES INCREASE PRICE CONTRACT PRICE PRICE 2287 Furnish and install benlonite slurry dam, complete asspecified Each 0.00 4.00 4.00 $2,000.00 $8,000.00 4101 Furnish and install 6" x 6" tees, complete as s ecifed Each 0.00 1.00 1.00 $350.00 $350.00 4230 Furnish and install 12" - 22- 112 degree bend, complete ass ecified Each 0.00 1.00 1.00 $500.00 $500.00 40000 Additional time to excavate around double gas laterals and install sanitary sewer laterals at 10 locations, complete as specified Hours 1 0.00 2.50 2.50 1 1 $1,055.00 1 $2,637.50 Page 16 of 17 12 -05 Change Order #2 FINAL ITEM DESCRIPTION UNIT BID INSTALLED NET NET UNIT INCREASEIN DECREASEIN CONTRACT NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACTPRICE PRICE 40001 Additional labor and equipment to remove and replace water main in he intersection of West 7th Avenue and Sawyer Street, per Water Department's request, Lump complete asspecified Sum 0.00 1.00 1.00 $5,830.00 $5,830.00 40002 Additional labor, equipment, and meterials to out out valve and cap existing tee for the River Commons water lateral, per Water Department's request, complete as Lump specified Sum 0.00 1.00 1.00 $6,885.00 $6,885.00 40003 Additional labor, materials, and equipment to remove contaminated soil from site, reload after testing, and haul to landfill (Contract 12 -28), complete Lump as specified Sum 0.00 1.00 1.00 $4,017.64 $4,017.64 ADDITIONAL WORK: C.O. # 2 (ITEMS 2287 - 40003) - SUB-TOTAL NET INCREASE TO: SECTION IV $28,220.14 $0.00 $24,204.00 NET INCREASE TO SECTIONS 1, 11, 111, IV $240,303.36 NET DECREASE TO SECTIONS I, 11, 111, 1V ($298,727.81) NET DECREASE TO CONTRACT: ($56,424.45) Page 17 of 117