12 -04 Change Order #3 FINAL
SECTION I - PAVING
ITEM
DESCRIPTION
UNIT
BID
INSTALLED
NET
NET
UNIT
INCREASE IN
DECREASeIN
NUMBER
complete asspecified
Yards
QUANTITY
QUANTITIES
INCREASE
DECREASE
PRICE
CONTRACT PRICE
CONTRACT PR CCE
100
Pavement removal,
Square
complete asspecified
Yards
9,600
10458.90
858.90
$2.56
$2,198.78
101
Sidewalk and driveway
removal, complete as
Square
specified
Feet
55,925
55854.80
-70.20
$0.51
$35.80
102
Excavation, complete as
Cubic
specified
Yards
12,420
11896.90
- 523.10
$9.08
54,749.75
103
7" non - reinforced concrete
pavement, including
integral curb, 5° base
material and grading,
Square
complete as specified
Yards
22,395
23593.10
1,198.10
$27.56
$33,019.64
104
7" non - reinforced concrete
pavement, HES, including
integral curb, 5" base
material and grading,
Square
complete as specified
Yards
760
874.50
114.50
$39.41
$4,512.45
105
8" non - reinforced concrete
pavement, including
integral curb,
6" base material and
grading, complete as
Square
specified
Yards
2,640
1224.10
- 1,415.90
$30.83
$43,652,20
106
8" concrete pavement,
HES, including integral
curb and 6" base material
and grading, complete as
Square
specified
Yards
1,305
914.00
1 - 391.00
$41.24
$16,124.84
107
12" wide radius curb head,
complete as specified
Linear
Feet
1,075
965.00
- 110.00
$6.16
$677.60
108
Standard 30" curb & gutter,
7" (tie -in), complete as
Linear
specified
Feet
300
376.20
76.20
$20.52
$1,563.62
109
Sidewalk curb, complete as
Linear
s ecified
Feet
1 200
68.70
- 131.30
$21.10
$2,770.43
110
4" concrete sidewalk,
Square
complete asspecified
Feet
24,250
26644.70
2,394.70
$3.35
$8,022.25
111
6" concrete sidewalk and
driveway, complete as
Square
specified
Feet
35,700
31403.30
- 4,298.70
$3.80
$16,327.46
112
8° concrete sidewalk,
Square
complete asspecified
Feet
3,725
3611.90
- 113.10
$4.20
$475.02
113
2" asphaltic concrete
transition with base,
Square
complete asspecified
Yards
1 108
182.50
74.50
1
$27.50
$2,048.75
114
3'/2" asphaltic concrete
driveway /path with base,
Square
complete asspecified
Feet
555
858.20
303.20
$4.75
$1,440.20
115
3 Yx asphaltic concrete
transition with base,
Square
complete asspecified
Yards
270
715.90
1 445.90
$37.80
$16,855.02
Page 1 of 14
12 -04 Change Order #3 FINAL
ITEM
DESCRIPTION
UNIT
BID
INSTALLED
NET
NET
UNIT
INCREASEIN
DECREASEIN
NUMBER
UNIT
QUANTITY QUANTITIES
QUANTITY
QUANTITIES
INCREASE
DECREASE
PRICE
CONTRACTPRICE
CONTRACTPRICE
116
5" asphaltic concrete
I Each
0.00
261.00
261.00
$3.45
$900.45
transition, with base,
Square
cam fete as s ecified
Yards
705
741.10
36.10
$48.10
$1,736.41
117
f=urnish and install crushed
stone base course,
complete as specified
Tons
4,715
126.60
- 4,588.40
$6.87
531,522.31
118
Sawing, complete as
Linear
specified
Feet
1,510
2136.70 1
626.70
$2.00 1
$1,25140
119
Furnish and install
pavement ties (epoxy
coated), complete as
specified
Each
317
371.00
54.00
$7.18
$387.72
120
Adjust manholes and
inlets, complete as
,specified
Each
171
172.00
1.00
$165.00
$165.00
121
f=urnish and install No. 4
reinforcing bars (epoxy
coated), complete as
Linear
specified
Feet
6,240
7374.00
1,134.00
$0.77
$873.18
122
Remove trees and stumps,
complete as specified
Inch
Diameter
80
163.00
83.00
$25.00
$2,075.00
123
Furnish and install trees,
complete asspecified
Each
I 11
16.00
5.00
1 $236.00
$1,180.00
124
Furnish and install metal
detectable warning fields,
Square
complete asspecified
Feet
352
544.00
192.00
$25.65
$4,924.80
125
Terrace work on W. 12`a
Avenue, complete as
Lump
specified
Sum
1
1.00
$21,000.00
126
Terrace work on W. 1e
Avenue, complete as
Lump
specified
Sum
1
1.00
$14,000.00
127
Terrace work on W. 17`h
Avenue, complete as
Lump
specified
Sum
1
1.00
$11,000.00
128
Terrace work on Michigan
Street
(W. South Park Avenue to
W. 11O Avenue), complete
Lump
asspecified
Sum
1
1.00
$6,000.00
129
Terrace work on Michigan
Street
(W. I e Avenue to W. 17 h
Avenue), complete as
Lump
specified
Sum
1
1.00
$6,000.00
130
Excavation special,
com lete as s ecified
Tons
1 2,200
2147.69
-52.31
$9.10
$476.02
SECTION I -(BID ITEMS 100 -130) - SUB- TOTALS $82,256.22 ($116,811.43)
ADDITIONAL WORK REQUIRED: C,O. # 3- SECTION I
ITEM
Furnish and install #4 bars
BID INSTALLED
NE7
NET
UNIT
INCREASE IN
DECREASEIN
NUMBER
DESCRIPTION
UNIT
QUANTITY QUANTITIES
INCREASE
DECREASE
PRICE
CONTRACT PRICE
CONTRACTPRlCE
10000
Furnish and install #4 bars
into existing sidewalk,
1
1
complete as �
I Each
0.00
261.00
261.00
$3.45
$900.45
Page 2 of 14
12 -04 Change Order #3 FINAL_
ITEM
NUMBER
DESCRIPTION
UNIT
BID
QUANTITY
INSTALLED
QUANTITIES
NET
INCREASE
NET
DECREASE
UN1r
PRICE
INCREASEIN
CONTRACTPRICE
DECREASE IN
CONTRACTPRICE
10001
QUANTITY
QUANTITIES
INCREASE
DECREASE
PRICE
CONTRACT.PRICE
CONTRACTPRICE
$4,400.00
2034
Furnish and install curb at
building on the southeast
Linear
corner of W. 15th Avenue
Feet
30
31.00
1.00
$60.00
$60.00
2036
and Oregon Street,
Lump
complete as specified
Sum
0.00
1.00
1.00
$635.00
$635.00
10002
Additional labor and
Feet
1,250
1,216.90
-33.10
545.00
$1,489.50
2042
equipment to remove gate
at the east end of E. 15th
Linear
Avenue, complete as
Lump
1,650
1,619.90
- 30.10
$44.00
$1,324.40
2044
specified
Sum
1 0.00
1 1.00
1 1.00
1
$105.00
$105.00
ADDITIONAL WORK: C. o. # 3 - (ITEMS 10000 - 10002) - SUB-TOTAL $1,640.45 $0.00
NET DECREASE TO: SECTION 1 ($32,914.76)
SECTION 11- STORM SEWER
ITEM DESCRIPTION
UNIT
BID
INSTALLED
I NET
NET
UNIT
114CIZEASEIN
DECREASEIN
NUMBER
QUANTITY
QUANTITIES
INCREASE
DECREASE
PRICE
CONTRACT.PRICE
CONTRACTPRICE
2014
Utility line opening,
complete as specified
Each
5
0.00
-5.00
$880.00
$4,400.00
2034
Furnish and install 10"
storm sewer, complete as
Linear
s ecified
Feet
30
31.00
1.00
$60.00
$60.00
2036
Furnish and install 12"
storm sewer, complete as
Linear
specified
Feet
1,250
1,216.90
-33.10
545.00
$1,489.50
2042
Furnish and install 15"
storm sewer, complete as
Linear
specified
Feel
1,650
1,619.90
- 30.10
$44.00
$1,324.40
2044
Furnish and install 15"
RCP Class III storm sewer,
Linear
complete asspecified
Feet
400
388.10
-11.90
$47.00
$559.30
2048
Furnish and install 18"
storm sewer, complete as
Linear
specified
Feet
200
216.20
16.20
$55.00
$891.00
2054
Furnish and install 21"
storm sewer, complete as
Linear
specified
Feet
50
36.80
-13.20
$80.00
$1,056.00
2060
Furnish and install 24"
storm sewer, complete as
Linear
s ecified
Feel
275
253.20
-21.80
$60.00
$1,308.00
2066
Furnish and install 27"
storm sewer, complete as
Linear
specified
Feet
25
10.00
- 15.00
$85.00
$1,275,00
2072
Furnish and install 30"
storm sewer, complete as
Linear
specified
Feet
710
681.30
- 28.70
$70.00
$2,009.40
2078
Furnish and install 36"
storm sewer, complete as
Linear
specified
Feet
475
426.80
1
-48.20
$86.00
$4,145.20
2096
Furnish and install 54"
storm sewer, complete as
Linear
speciled
Feet
575
547.00
-28.00
$156.00
$4,368.00
2114
Fumish and install 72"
storm sewer, complete as
Linear
specified
Feet
110
100.00
-10.00
$1,835.00
$18,350.00
Page 3 Of 14
12 -04 Change Order #3 FINAL
ITEM
DESCRIPTION
UNIT
SID
INSTALLED
NET
NET
UNIT
INCREASE IN
DECREASEIN
NUMBER
QUANTITY
QUANTITIES
INCREASE
DECREASE
PRICE
CONTRACTPRICE
CONTRACTPRICE
2116
Furnish and install 72"
RCP Class III storm sewer,
Linear
complete asspecified
Feet
50
47.60
-2.40
$332.00
$796.80
2120
Furnish and install 14 "x
23" HERCP Class III storm
sewer, complete as
Linear
specified
Feet
310
299.80
-10.20
$65.50
$688,10
2128
Furnish and install 24 "x
38" HERCP Class III storm
sewer, complete as
Linear
specified
Feet
375
366.00
-9.00
$91.30
$821.70
2132
Furnish and install 29" x
45" HERCP Class III storm
sewer, complete as
Linear
specified
Feet
300
269.50
-30.50
$115.00
$
2140
f=urnish and install 38" x
60" HERCP Class III storm
sewer, complete as
Linear
specified
Feet
675
640.30
1
-34.70
$156.50
2172
Furnish and install 3' x 6'
box culvert storm sewer,
Linear
corn lete ass ecified
Feel
600
566.30
-33.70
$311.00
;($5,430.55)
.70
2174
Furnish and install 4'x 6'
box culvert storm sewer,
Linear
complete as specified
Feel
1 350
347.80
1 - 2.20
$342.00
$752.40
2220
Furnish and install 3' x 6'
box culvert storm sewer
with manhole or inlet riser,
Linear
complete asspecified
Feet
8
8.00
$352.00
2222
Furnish and install 4'x 6'
box culvert storm sewer
with manhole or inlet riser,
Linear
complete ass ecified
Feet
16
16.00
$356.00
2280
Furnish and install 6" storm
lateral, complete as
Linear
specified
Feet
4,800
4,567.40
- 232.60
$34.50
$8,024,70
2284
Furnish and install storm
sewer marker balls,
corn fete ass ecified
Each
350
324.00
1
-26.00
$20.00
$520.00
2286
Furnish & Install clay dams,
cam fete asspecified
Each
175
161.00
-14.00
$30.00
$420.00
2288
Furnish & install lateral
inlet, complete asspecified
Each
175
132.00
-43.00
$327.00
$14,061.00
2326
Furnish and install 72"
RCP Class III apron
endwall with joint ties,
complete as specified
Each
1
1.00
$5,500.00
2488
Furnish and install 84"
casing pipe by trenchless
methods, complete as
Linear
specified
Feet
110
79.90
-30.10
$1.00
$30.10
2532
Furnish and install
standard storm manhole (4'
diameter), complete as
Vertical
specified
Feet
1 100
100.69
0.69
1
$250.00
$172.50
2534
Furnish and install
standard storm manhole (5'
diameter), complete as
Vertical
specified
Feet
18
17.17
-0.83
$385.00
$319.55
Page 4 of 14
12 -04 Change Order #3 FINAL.
ITEM
DESCRIPTION
UNIT
BID
INSTALLED
NET
NET
UNIT
INCREASE IN
DECREASE IN
NUMBER
QUANTITY
QUANTITIES
INCREASE
DECREASE
PRICE
CONTRACTPRICE
CONTRACTPRICE
2536
Furnish and install
standard storm manhole (6'
diameter), complete as
Vertical
specified
Feet
10
12.55
2.55
$435.00
$1,107.51
2538
Furnish and install
standard storm manhole (7'
diameter), complete as
Vertical
specified
Feet
16
10.75
-5.25
$570.00
52,992.50
2550
Furnish and install
standard storm manhole (7'
x 7' box), complete as
Vertical
specified
Feet
60
58.96
-1.04
$910.00
$946.40
2558
Furnish and install
standard storm inlet
manhole (5' diameter),
Vertical
complete ass specified
Feet
15
1 11.88
-112
1 $327.00
51,020.24
2580
Furnish and install storm
junction chamber,
complete as specified
Each
5
5.00
$18,200.00
2584
Furnish and install
standard storm manhole
riser (4' diameter),
Vertical
complete as specified
Feet
5
6.45
1.45
$250.00
$362.50
2612
Furnish and install Type 1
inlet, complete ass specified
Each
4
3.00
-1.00
$1,370.00
51,370.00
2614
Furnish and install Type 3
inlet (with 18" sump),
complete as specified
Each
75
73.00
-2.00
$1,510.00
53,020.00
2800
Connect to existing stoma
sewer, complete as
specified
Each
2
7.00
5.00
$300.00
$1,500.00
2802
Connect to existing storm
lateral, complete as
specified
Each
15
4.00
-11.00
$100.00
51,100.00
2806
Connect to existing
manhole, complete as
specified
Each
1
0.00
-1.00
$735.00
$735.00
2808
Connect to existing inlet,
complete ass specified
Each
1
0.00
-1.00
$735.00
5735.00
2820
Abandon 8" -12" storm
sewer, complete as
Linear
specified
Feel
975
1 975.00
1
1 $2.90
Page 5 of 14
12 -04 Change Order #3 FINAL
ITEM
DESCRIPTION
UNIT
BID
INSTALLED
NET
NET
UNIT
INCREASEIN
DECREASEIN
NUMBER
DESCRIPTION
UNIT
QUANTITY
QUANTITIES
INCREASE
DECREASE
PRICE
CONTRACT PRICE
CONTRACT PRICE
2822
Abandon 16'& larger
storm sewer, complete as
Linear
s ecified
Feet
800
800.00
$4.00
2824
Remove 30' & smaller
storm sewer, complete as
specified
Each
1,325
1,325.00
$20.25
2830
Abandon storm manholes
Each
1 -4.00
1 -4.00
1
$2,500.00
and inlets, complete as
specified
Each
50
47.00
-3.00
$340.00
51,020.00
2858
Furnish, install, maintain,
and remove Type D
modified inlet protection,
complete as specified
Each
239
168.00
-71.00
$60.00
$4,260.00
2860
Sediment removal - Type D
modified inlet protection,
complete asspecified
Each
239
12.00
- 227.00
$10.00
$2,270.00
2866
Furnish, install, maintain,
and remove stone bag,
complete as specified
Each
50
0.00
- 50.00
$13.00
$650.00
2888
Furnish, install, maintain
and remove 12" diameter
sediment togs, complete as
Linear
specified
Feet
120
96.00
-24.00
$11.00
$284.00
2876
Furnish, install, maintain,
and remove turbidity
barrier, complete as
specified
Each
1
1.00
1
$2,000.00
2930
Furnish and install Class I,
Type A erosion control
Square
mat, complete as specified
Yards
63
1,593.89
1,530.89
$11.00
$16,839.79
2948
Furnish and install heavy
rip -rap with filter fabric,
Square
complete asspecified
Yards
122
89.00
-33.00
$190.00
$6,270.00
SECTION II - (BID ITEMS 2014 -2948) - SUB - TOTALS $20,933.30 ($112,770.64)
ADDITIONAL. WORK REQUIRED, C.O. # 2 - SECTION II
ITEM
Furnish & install 8 -inch
storm sewer, complete as
specified
Linear
Foot
BID
INSTALLED
NET
NET
UNIT
INCREASE IN
DECREASE IN
NUMBER
DESCRIPTION
UNIT
QUANTITY
QUANTITIES
I
INCREASE
DECREASE
PRICE
CONTRACT PRICE
CONTRACT PRICE
2032
Furnish & install 8 -inch
storm sewer, complete as
specified
Linear
Foot
54.50
54.50
$60.00
20000
Credit given to City to allow
PTS Contractors to Cast -In
Place, instead of using Pre -
Cast Structures for four
Junction Chambers, per
letter dated June 12, 2012,
complete as specified
Each
1 -4.00
1 -4.00
1
$2,500.00
Page 6 of 14
12 -04 Change Order #3 FINAL
ITEM
NUMBER
DESCRIPTION
UNIT
BID
QUANTITY
INSTALLED
QUANTITIES
NET
INCREASE
NET
DECREASE
UNIT
PRICE
INCREASE IN
CONTRACTPRICE
DECREASEIN
CONTRACTPRICE
20001
Additional labor, materials,
UNIT
QUANTITY
QUANTITIES
IN
DECREASE
PRICE
CONTRACTPRICE
CONTRACTPRICE
and equipment to modify
Feet
3,950
3,877.50
-72.50
$56.60
$4,103.54
3002
Junction Chamber 15 -23 to
include a Type III Inlet, per
Lump
Invoice number 12 -605
Sum
0.00
1.00
1.00
-17.30
$813.61
$813.61
$1,110.66
20001
T &M -10, dated August 6,
2012, complete as
Lump
s ecified
Sum
1 1.00
1 1.00
1
1
$2,820.00
$3,586.44
ADDITIONAL WORK: C.O. # 2 -(ITEMS 2036 & 20000 - 20001) - SUB -TOTAL $0.00 $0.00
ADDITIONAL WORK REQUIRED: C.O. # 3 - SECTION It
ITEM
DESCRIPTION
UNIT
BID
INSTALLED
NET
NET
UNIT
INCREASEIN
DECREASE IN
NUMBER
and equipment to move
UNIT
QUANTITY
QUANTITIES
IN
DECREASE
PRICE
CONTRACTPRICE
CONTRACTPRICE
20002
Additional labor, materials,
BID
INSTALLED
NET
NET
UNIT
INCREASE IN
DECREASE IN
NUMBER
and equipment to move
UNIT
QUANTITY
QUANTITIES
INCREASE
DECREASE
PRICE
CONTRACT PRICE
CONTRACT PRICE
lateral drain inlet @ 525 W.
Feet
3,950
3,877.50
-72.50
$56.60
$4,103.54
3002
17th Avenue, per Invocie
12 -605 T &M -8, compiete
Lump
ass specified
Sum
0.00
1.00
1.00
-17.30
$813.61
$813.61
$1,110.66
20001
Price adjustment to Bid
Item 20001 from Change
Linear
Order #2, Lump sum price
Feet
1 1,350
1,395.60
45.60
$78.65
$3,586.44
3012
should have been $2920,
not $2820, per Invoice 12-
Lump
605, T &M -10
Sum
0.00
1.00
1.00
-33.70
$100.00
$100.00
$4,473.68
ADDITIONAL WORK: C.Q. # 3 - (ITEM 20002 & 20001) - SUB -TOTAL $913.61 $0.00
NET DECREASE TO: SECTION ll ($90,923.73)
SECTION III - SANITARY SEWER
ITEM
Furnish and install 8"
BID
INSTALLED
NET
NET
UNIT
INCREASE IN
DECREASE IN
NUMBER
DESCRIPTION
UNIT
QUANTITY
QUANTITIES
INCREASE
DECREASE
PRICE
CONTRACT PRICE
CONTRACT PRICE
3000
Furnish and install 8"
sanitary sewer relay,
Linear
complete asspecified
Feet
3,950
3,877.50
-72.50
$56.60
$4,103.54
3002
Furnish and install 10"
sanitary sewer relay,
Linear
complete asspecified
Feet
210
192.70
-17.30
$54.20
$1,110.66
3004
Furnish and install 12"
sanitary sewer relay,
Linear
complete as specified
Feet
1 1,350
1,395.60
45.60
$78.65
$3,586.44
3012
Furnish and install 24"
sanitary sewer relay,
Linear
complete as specified
Feel
610
576.30
-33.70
$132.75
$4,473.68
3060
Furnish and install 8"
sanitary sewer drop,
Vertical
complete as specified
Feel
18
17.51
-0.49
$400.00
$196.00
3064
Furnish and install 12°
sanitary sewer drop,
Vertical
complete as specified
Feet
9
7.90
-1.10
$420.00
$462.00
3100
Furnish and install
standard sanitary manhole
(4' diameter), complete as
Vertical
specified
I Feet
250
1 247.01
1
- 2.99
1 $232.00
$693.68
Page 7 of 14
12 -04 Change Order #3 FINAL
ITEM
DESCRIPTION
UNIT
BID
INSTALLED
NET
NET
UNIT
INCREASEIN
DECREASEIN
NUMBER
QUANTITY
QUANTITIES
INCREASE
DECREASE
PRICE
CONTRACT.PRICE
CONTRACTPRICE
3114
Furnish and install external
manhole chimney seat,
complete as specified
Each
34
27.00
-7.00
$360.00
$2,520.00
3116
Furnish and install external
manhole chimney seal
extension, complete as
specified
Each
8
3.00
- 5.00
$320.00
$1,600.00
3118
Furnish and install internal
manhole chimney seal,
cam fete ass ecified
Each
2
5.00 1
3.00
$340.00 1
$1,020.00
3200
Furnish and install 8" x 4"
factory wyes or tees,
complete as specified
Each
5
0.00
- 5.00
$70.00
$350.00
3204
f=urnish and install 12" x 4"
factory wyes or tees,
complete as specified
Each 1
5
0.00
1
-5.00
$150.00
$750.00
3210
Furnish and install 8" x 6"
factory wyes or tees,
complete ass specified
Each
95
98.00
3.00
$71.00
$213.00
3212
Furnish and install 10" x 6"
factory wyes or lees,
complete as specified
Each
4
0.00
- 4.00
$115.00
$460.00
3214
Furnish and install 12" x 6"
factory wyes or tees,
complete as specified
Each
34
30.00
1 -4.00
$165.00
$660.00
3222
Furnish and install 6"
"Insert -A -Tee" or "Kor -N-
Seal ", complete as
s ecified
Each
20
17.00
- 3.00
$115.00
$345.00
3230
Furnish and install 4"
sanitary laterals new,
Linear
complete as specified
Feet
190
127.00
-63.00
$68.50
$4,315.50
3234
Furnish and install 4 "16"
sanitary lateral relay,
Linear
complete asspecified
Feet
4,800
4,390.30
- 409.70
$69.00
$28,269.30
3235
Furnish and install 4 "16"
sanitary riser relay,
Linear
complete asspecified
Feet
100
159.50
59.50
$67.00
$3,986.50
3236
Furnish and install sanitary
lateral marker balls,
com lete asspecified
Each
340
336.00
-4.00
$20.00
$80.00
3238
Furnish and install clay
dams, complete as
specified
Each
170
161.00
-9.00
$88.00
$792.00
3300
Furnish and install
connections to existing 8"
mains, complete as
specified
Each
1 10
10.00
$580.00
3304
Furnish and install
connections to existing 12"
mains, complete as
specified
Each
3
3.00
$600.00
Page 8 of 14
12 -04 Change Order #3 FINAL
ITEM
DESCRIPTION
UNIT
BID
INSTALLED
NET
NET
UNIT
INCREASEIN
DECREASE IN
NUMBER
UNIT
QUANTITY QUANTITIES
QUANTITY
QUANTITIES
INCREASE
DECREASE
PRICE
CONTRACTPRICE
CONTRACTPRICE
3306
Fumish and install
Foot
20.00
$1,960.00
$336.00
connections to existing 15"
mains, complete as
specified
Each
2
1.00
-1.40
$700.00
$700.00
3310
f=urnish and install
connections to existing 21"
mains
Each
2
1.00
-1.00
$800.00
$840.00
3312
Furnish and install
connections to existing 24"
mains
Each
3
2.00
- 1.00
$1,000.00
$1,000.00
3402
Furnish and install 8" open
cut casing pipes, complete
Linear
as specified
Feet
210
198.00
-12.00
$90.00
$1,080.00
3406
Furnish and install 12"
open cut casing pipes,
Linear
complete as specified
Feet
20
20.00
$112.00
3600
Rock excavation, complete
Cubic
as specified
Yards
225
177.50
-47.50
$244.00
$11,400.00
3700
Televise sanitary sewer,
Linear
complete as specified
Feet
6125
6,047.10
-77.90
$1.85
$144.11
3800
Abandon sanitary
manholes, complete as
,specified
Each
10
9.00
-1.04
$390.00
$390.00
3802
Abandon 8' sanitary sewer,
Linear
complete as specified
Feet
650
625.00
-25.00
$1.70
$42.50
3804
Abandon 10° sanitary
sewer, complete as
Linear
specified
Feet
25
20.00
-5.00
1 $8.00
$40.00
3806
Abandon 12" sanitary
sewer, complete as
Linear
specified
Feet
300
215.00
-85.00
$1.70
$144.50
3814
Abandon 24° sanitary
sewer, complete as
Linear
specified
Feet
1 630
600.00
-30.00
$3.00
$90.00
3850
Remove sanitary sewer,
Linear
complete ass specified
Feet
450
420.00
-30.00
1 $28.00
$840.00
3900
Sanitary Sewer Utility Line
Openings (ULO), complete
as specified
Each
1
1.00
$900.00
SECTION III -(BID ITEMS 3000 -3900) - SUB - TOTALS $8,805.94 ($67,862.43)
ADDITIONAL. WORK REQUIRED; C.O. # 1 - SECTION III
ITEM
Furnish and install 15"
BID
BID INSTALLED
NET
NET
UNIT
INCREASE IN
DECREASE IN
NUMBER
DESCRIPTION
UNIT
QUANTITY QUANTITIES
IN
DECREASE
PRICE
CONTRACTPRICE
CONTRACTPRICE
3006
Furnish and install 15"
BID
INSTALLED NET NET
UNIT
INCREASE IN
DECREASEIN
DESCRIPTION
NUMBER
UNIT
QUANTITY
sanitary sewer relay,
Linear
1
1
CONTRACTPRICE
1
complete ass ecifed
Feet 20.00
20.00
Foot
20.00
$1,960.00
ADDITIONAL_ WORK: C. 0. # 1 - (ITEM 3006) - SUB -TOTAL $0.00 $0.00
ADDITIONAL WORK REQUIRED; C.O. # 2 - SECTION III
ITEM
Furnish and install 36 -inch
BID
INSTALLED NET NET
UNIT
INCREASE IN
DECREASEIN
DESCRIPTION
NUMBER
UNIT
QUANTITY
QUANTITIES IN DECREASE
I PRICE
CONTRACTPRICE
CONTRACTPRICE
3416
Furnish and install 36 -inch
open cut casing pipe,
Linear
I
1
complete as specified
Foot
20.00
20.00
$336.00
Page 9 of 14
12 -04 Change Order #3 FINAL
ITEM
NUMBER
DESCRIPTION
UNIT
BID
QUANTITY
INSTALLED
QUANTITIES
NET
INCREASE
NET
DECREASE
UNIT
PRICE
INCREASE IN
CONTRACTPRICE
DECREASE IN
CONTRACTPRICE
30000
Additional labor, materials,
and equipment to have
Linear
Great Lakes TV Seal
Feet
50
41.00
- 9.00
$100.00
$900.00
4002
rehabilitate MH 03 -31, with
a spray liner, complete as
Lump
specified
Sum
1.00
1.00
$2,850.00
30001
Additional labor, materials,
Fee! 1
485
528.20
43.20
1
$84.00
$3,628.80
4004
and equipment to break out
concrete poured around
existing manhole in the
Linear
intersection of W. 15th
Feet
5,545
5,535.00
- 10.00
$68.40
$684.00
4006
Avenue and Nebraska
Street and core into
existing man hole at a
Linear
lower elevation due to
Foot
110
101.00
- 9.00
$200.00
51,800.00
4008
utility conflicts per Invoice
12- 605- T&M -7, dated June
13, 2012, complete as
Lump
specified
Sum
1.00
1.00
-78.00
$2,643.20
$7,137.00
ADDITIONAL WORK; C. O. # 2 - (ITEMS 3416 & 30000- 30001) -SUB -TOTAL $0.00 $0.00
NET DECREASE TO: SECTION III ($59,046.49)
SECTION IV - WATER MAIN
ITEM DESCRIPTION UNIT BID INSTALLED NET NET UNIT INCREASE IN DECREASEIN
NUMBER QUANTITY QUANTITIES INCREASE I DECREASE I PRICE I CONTRACTPRICE CONTRACTPRICE
4000
Furnish and install 4"
ductile iron water main with
poly wrap relay, complete
Linear
asspecified
Feet
50
41.00
- 9.00
$100.00
$900.00
4002
Furnish and install 6'
ductile iron water main with
poly wrap relay, complete
Linear
asspecified
Fee! 1
485
528.20
43.20
1
$84.00
$3,628.80
4004
Furnish and install 8°
ductile iron water main with
poly wrap relay, complete
Linear
asspecified
Feet
5,545
5,535.00
- 10.00
$68.40
$684.00
4006
Fumish and install 10°
ductile iron water main with
poly wrap relay, complete
Linear
as specified
Foot
110
101.00
- 9.00
$200.00
51,800.00
4008
Furnish and install 12"
ductile iron water main with
poly wrap relay, complete
Linear
ass specified
Feet
1,390
1,312.00
-78.00
$91.50
$7,137.00
Page 10 of 14
12 -04 Change Order #3 FINAL
ITEM
DESCRIPTION
UNIT
BID
INSTALLED
NET
NET
UNIT
INCREASE IN
DECREASE IN
NUMBER
QUANTITY
QUANTITIES
INCREASE
DECREASE
PRICE
CONTRACTPRICE
CONTRACTPRICE
4036
Furnish and install 1" water
service relay, complete as
Linear
specified
Feel
4,200
4,727.40
527.40
$53.20
$28,057.68
4042
Furnish and install 1 "water
service new, complete as
Linear
specified
Feet
190
184.00
-6.00
$70.00
$420.00
4048
Furnish and install 1"
corporation and stop box,
complete as specified
Each
1 160
156.00
-4.00
$270.00
$1,080.00
4054
Furnish and install water
service day dams,
complete lete asspecified
Each
160
157.00
-3.00
$30.00
$90.00
4056
Furnish and Install
connections to existing 4"
water main, complete as
specified
Each
1 2
1.00
1
-1.00
$1,300.00
$1,300.00
4058
Furnish and install
connections to existing 6"
water main, complete as
specified
Each
14
17.00
3.00
$1,460.00
$4,380.00
4060
Furnish and install
connections to existing 8"
water main, complete as
specified
Each
1 6
5.00
-1.00
$1,570.00
$1,570.00
4062
Furnish and install
connections to existing 10"
water main, complete as
specified
Each
3
2.00
-1.00
$1,760.00
$1,760.00
4064
Furnish and install
connections to existing 12"
water main, complete as
s ecified
Each
1 3
2.00
1 -1.00
$2,000.04
$2,000.00
4109
Furnish and install 8" x 4"
tee, complete as specified
Each
2
1.00
-1.00
$317.00
$317.00
4110
Furnish and install 8" x 6"
tee, complete asspecified
Each
18
14.00
- 4.00
$386.00
$1,544.00
4111
Furnish and install 8" x 8"
tee, complete asspecified
Each
2
1.00
-1.00
$445.00
$445.00
4128
Furnish and install 12" X
6" tee, complete as
specified
Each
6
5.00
-1.00
$687.00
5687.00
4189
Furnish and install 8" x 8"
cross, complete as
specified
Each
5
5.00
$592.00
4190
Furnish and install 8" X
10" cross, complete as
specified
Each
2
1.00
-1.00
$700.00
$700.00
4191
Furnish and install 8" x 12"
cross, complete as
specified
Each
3
2.00
-1.00
$800.00
$800.00
4226
Furnish and install 4° 22
degree bend, complete as
specified
Each
2
0.00
-2.00
$146.00
5292.00
4227
Furnish and install 6" 22 %
degree bend, complete as
specified
Each
2
1.00
-1.00
$182.00
4228
and install 8° 22'/
F$182.00
IFumish
degree bend, complete as
specified
I Each
2
1 2.00
1
1 $245.00
Page 11 of 14
12 -04 Change Order #3 FINAL
ITEM
DESCRIPTION
UNIT
BID
INSTALLED
NET
NET
UNIT
INCREASEIN
DECREASEIN
NUMBER
QUANTITY
QUANTITIES
INCREASE
DECREASE
PRICE
CONTRACTPRICE
CONTRACTPRICE
4229
Furnish and install 10' 22
%2 degree bend, complete
as specified
Each
2
0.00
- 2.00
$350.00
$700.00
4230
Furnish and install 12' 22
S/ degree bend, complete
asspecified
Each
2
2.00
$560.00
4235
Furnish and install 4" 45
degree bend, complete as
specified
Each
2
0.00
-2.00
$146.00
$292.00
4236
f=urnish and install 6" 45
degree bend, complete as
specified
Each
29
63.00
34.00
$192.00
$6,528.00
4237
Furnish and install 8" 45
degree bend, complete as
s ecified
Each
16
21.00
1 5.00
$250.00
$1,250.00
4238
Furnish and install 10' 45
degree bend, complete as
specified
Each
6
5.00
AM
$360.00
$360.00
4239
Furnish and install 12' 45
degree bend, complete as
s ecified
Each
1 6
4.00
-2.00
$565.00
$1,130.00
4263
Furnish and install 8" x 4"
reducer, complete as
specified
Each
1
0.00
1
-1.00
$200,00
$200.00
4264
Furnish and install 8" x 6"
reducer, complete as
specified
Each
15
16.00
1.00
$215.00
$215.00
4352
Cut and cap existing 6"
water main, complete as
specified
Each
6
6.00
$170.00
4354
Cut and cap existing 8"
water main, complete as
specified
Each
1
1.00
$240.00
4400
Furnish and install 4' gate
valve, complete as
specified
Each
2
1.00
-1.00
$872.04
$872.00
4401
Furnish and install 6" gate
valve, complete as
specified
Each
22
23.00
1.00
$1,021.00
$1,021.00
4402
Furnish and install 8" gate
valve, complete as
specified
Each
35
33.00
-2.00
$1,386.00
$2,772,00
4404
f=urnish and install 12' gate
valve, complete as
s ecified
Each
10
7.00
-3.00
$2,420.00
57,260.00
4410
Furnish and install 6" cut -in
valve, complete as
specified
Each
1 1
0.00
1 -1.00
$1,890.00
$1,890.00
4419
Furnish and install 6" X 6"
tapping valve & sleeve,
complete as specified
Each
3
1.00
-2.00
$1,400.00
$2,800.00
4500
Furnish and install hydrant,
complete ass ecifed
Each
19
18.00
-1.00
$2,920.00
52,920.00
4504
Furnish and install
gradelok for hydrant
branches, complete as
specified
Each
19
0.00
-19.00
$430.00
58,17D.OD
4712
Furnish and install 2' steel
casing pipe, complete as
Linear
specified
I Feet
250
210.00
- 40.00
1 $46.00
$1,840.00
Page 12 of 114
12 -04 Change Order #3 FINAL
ITEM
DESCRIPTION
UNIT
RID
INSTALLED
NET
NET
UNIT
INCREASEIN
DECREASE IN
NUMBER
UNIT
QUANTITY
QUANTITY
QUANTITIES
INCREASE
DECREASE
PRICE
CONTRACTPRICE
CONTRACTPRICE
4724
Furnish and install 16°
Feet
38.00
38.00
$60.00
4049
steel casing pipe, complete
Linear
as specified
Feet
45
49.00
4.00
$140.00
$560.00
4800
Rock excavation, complete
Cubic
1.00
1.00
$125.00
4049.1
as specified
Yards
38
9.80
- 28.20
$350.00
$9,870.00
4900
Abandon water main on W.
1Z' Avenue, complete as
Lump
1.00
1.00
$305.00
4403
specified
Sum
1
1.00
$1,175.00
4902
Abandon water main on
Michigan Street (W. South
Each
2.00
2.00
$2,000.00
4429
Park Avenue to
W. 11'" Avenue), complete
Lump
asspecified
Sum
1
1.00
$1,175.00
4904
Abandon water main on W.
15'h Avenue, complete as
Lump
specified
Sum
1
1.00
$1,175.00
4906
Abandon water main on W.
170 Avenue, complete as
Lump
specified
Sum
1
1.00
$1,175.00
4998
Abandon water main on
Michigan Street (W. 18'�
Lump
Avenue to W. 17th
Sum
1 1.00
1 1.00
1
1
1$23,041.56
Avenue), complete as
Lump
specified
Sum
1
1.00
$1,175.00
4920
Remove water main,
Linear
complete as specified
Feet
1,325
1,315.00
-10.00
$45.00
5450.OD
SECTION 1V - (BID ITEMS 4000 -4920) - SUB - TOTALS $45,640.48 ( #$5,234.00)
ADDITIONAL WORK REQUIRED; C.O. # 1 - SECTION IV
ITEM
Furnish & install 1 -114"
RID
INSTALLED
NET
NET
UNIT
1NCREASEIN DECREASEIN
NUMBER
DESCRIPTION
UNIT
QUANTITY
QUANTITIES
INCREASE
DECREASE
I PRICE
CONTRACTPRICE CONTRACTPRICE
4037
Furnish & install 1 -114"
water service relay,
Linear
complete as specified
Feet
38.00
38.00
$60.00
4049
Furnish & install 1" stop
box and rod only, complete
as specified
Each
1.00
1.00
$125.00
4049.1
Furnish & install 1 -114"
Corporation and stop box,
complete ass ecified
Each
1.00
1.00
$305.00
4403
Furnish & install 10 -inch
gate valve, complete as
specified
Each
2.00
2.00
$2,000.00
4429
Furnish & install 12" x 8"
tapping valve & sleeve,
complete asspecified
Each
1.00
1 1.00
$2,022.00
40000
Additional labor, time, and
materials to install water
services on Oshkosh
Avenue with the DOT limits
under emergency work, per
Invoices 12 -605 T &M -1
through 12 -605 T &M -3,
complete as specified
Lump
Sum
1 1.00
1 1.00
1
1
1$23,041.56
Page 13 of 14
12 -04 Change Order #3 FINAL
ITEM
NUMBER
DESCRIPTION
UNIT
BID
QUANTITY
INSTALLED
QUANTITIES
NET
INCREASE
NET
DECREASE
UNIT
PRICE
INCREASE IN
CONTRACTPRICE
DECREASEIN
CONTRACTPRICE
40001
Additional labor, time, and
Linear
QUANTITY
QUANTITIES
IN
DECREASE
PRICE
CONTRACTPRICE
CONTRACTPRlCE
40002
materials to cut and cap
Foot
20.00
20.00
$193.00
40003
existing water main and
install gate valve in the
17th & Ohio intersection,
per Invoice 12 -605 T &M -4,
complete as specified
Lump
repair sleeve, per Invoice
Sum
1 1.00
1 1.00
1
$1,288.00
ADDITIONAL WORK: C.O. # 1 pTEMS 403740001) - sue -TOTAL
ADDITIONAL WORK REQUIRED: C.O. # 2 - SECTION IV
$0.00 $0.00
ITEM
DESCRIPTION
UNIT
BID
INSTALLED
NET
NET
UNIT
I
INCREA$EIN
DECREASE IN
NUMBER
trenchless casing pipe,
Linear
QUANTITY
QUANTITIES
IN
DECREASE
PRICE
CONTRACTPRICE
CONTRACTPRlCE
ADDITIONAL. WORK: C.O. # 2 (ITEMS 40002 - 40005) - SUB -TOTAL
NET DECREASE TO: SECTION IV
NET INCREASE TO SECTIONS I, 11, III, IV
NET DECREASE TO SECTIONS 1, 11, 111, IV
NET DECREASE TO CONTRACT:
Page 14 of 14
$0.00 $0.01)
($19,593.62)
$160,190.00
($362,668.50)
($202,478.50)
Furnish & install 12 -inch
trenchless casing pipe,
Linear
40002
complete asspecified
Foot
20.00
20.00
$193.00
40003
Additional labor, materials,
and equipment to cut out
existing 12" x 6" tapping
tee and replace with a 12"
repair sleeve, per Invoice
12. 605- T &M -5, dated June
13, 2012, complete as
Lump
specified
Sum
1 1.00
1.00
$1,393.67
40004
Additional labor, materials,
and equipment to cap
existing 6 "watermain by
old hydrant, due to leaky
valve that was shut off but
still leaking, per Invoice 12-
605-T&M-6, dated June 13,
2012, complete as
Lump
specified
Sum
1.00
1.00
$956.36
40005
Additional labor, materials,
and equipment to repair
water main break when
valve broke while trying to
strut it off, per Invoice 12-
605-T&M-9, dated July 13,
20112, complete as
Lump
s ecified
Sum
1 1.00
1 1.00
1
$1,841.00
ADDITIONAL. WORK: C.O. # 2 (ITEMS 40002 - 40005) - SUB -TOTAL
NET DECREASE TO: SECTION IV
NET INCREASE TO SECTIONS I, 11, III, IV
NET DECREASE TO SECTIONS 1, 11, 111, IV
NET DECREASE TO CONTRACT:
Page 14 of 14
$0.00 $0.01)
($19,593.62)
$160,190.00
($362,668.50)
($202,478.50)