HomeMy WebLinkAboutPW CNT 12-04/CH OR #3m bpi inx. Y. 3� ■ 1 12 -04 Change Order #3 FINAL SECTION I - PAVING ITEM DESCRIPTION UNIT BID INSTALLED NET NET UNIT INCREASE IN DECREASeIN NUMBER complete asspecified Yards QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PR CCE 100 Pavement removal, Square complete asspecified Yards 9,600 10458.90 858.90 $2.56 $2,198.78 101 Sidewalk and driveway removal, complete as Square specified Feet 55,925 55854.80 -70.20 $0.51 $35.80 102 Excavation, complete as Cubic specified Yards 12,420 11896.90 - 523.10 $9.08 54,749.75 103 7" non - reinforced concrete pavement, including integral curb, 5° base material and grading, Square complete as specified Yards 22,395 23593.10 1,198.10 $27.56 $33,019.64 104 7" non - reinforced concrete pavement, HES, including integral curb, 5" base material and grading, Square complete as specified Yards 760 874.50 114.50 $39.41 $4,512.45 105 8" non - reinforced concrete pavement, including integral curb, 6" base material and grading, complete as Square specified Yards 2,640 1224.10 - 1,415.90 $30.83 $43,652,20 106 8" concrete pavement, HES, including integral curb and 6" base material and grading, complete as Square specified Yards 1,305 914.00 1 - 391.00 $41.24 $16,124.84 107 12" wide radius curb head, complete as specified Linear Feet 1,075 965.00 - 110.00 $6.16 $677.60 108 Standard 30" curb & gutter, 7" (tie -in), complete as Linear specified Feet 300 376.20 76.20 $20.52 $1,563.62 109 Sidewalk curb, complete as Linear s ecified Feet 1 200 68.70 - 131.30 $21.10 $2,770.43 110 4" concrete sidewalk, Square complete asspecified Feet 24,250 26644.70 2,394.70 $3.35 $8,022.25 111 6" concrete sidewalk and driveway, complete as Square specified Feet 35,700 31403.30 - 4,298.70 $3.80 $16,327.46 112 8° concrete sidewalk, Square complete asspecified Feet 3,725 3611.90 - 113.10 $4.20 $475.02 113 2" asphaltic concrete transition with base, Square complete asspecified Yards 1 108 182.50 74.50 1 $27.50 $2,048.75 114 3'/2" asphaltic concrete driveway /path with base, Square complete asspecified Feet 555 858.20 303.20 $4.75 $1,440.20 115 3 Yx asphaltic concrete transition with base, Square complete asspecified Yards 270 715.90 1 445.90 $37.80 $16,855.02 Page 1 of 14 12 -04 Change Order #3 FINAL ITEM DESCRIPTION UNIT BID INSTALLED NET NET UNIT INCREASEIN DECREASEIN NUMBER UNIT QUANTITY QUANTITIES QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACTPRICE CONTRACTPRICE 116 5" asphaltic concrete I Each 0.00 261.00 261.00 $3.45 $900.45 transition, with base, Square cam fete as s ecified Yards 705 741.10 36.10 $48.10 $1,736.41 117 f=urnish and install crushed stone base course, complete as specified Tons 4,715 126.60 - 4,588.40 $6.87 531,522.31 118 Sawing, complete as Linear specified Feet 1,510 2136.70 1 626.70 $2.00 1 $1,25140 119 Furnish and install pavement ties (epoxy coated), complete as specified Each 317 371.00 54.00 $7.18 $387.72 120 Adjust manholes and inlets, complete as ,specified Each 171 172.00 1.00 $165.00 $165.00 121 f=urnish and install No. 4 reinforcing bars (epoxy coated), complete as Linear specified Feet 6,240 7374.00 1,134.00 $0.77 $873.18 122 Remove trees and stumps, complete as specified Inch Diameter 80 163.00 83.00 $25.00 $2,075.00 123 Furnish and install trees, complete asspecified Each I 11 16.00 5.00 1 $236.00 $1,180.00 124 Furnish and install metal detectable warning fields, Square complete asspecified Feet 352 544.00 192.00 $25.65 $4,924.80 125 Terrace work on W. 12`a Avenue, complete as Lump specified Sum 1 1.00 $21,000.00 126 Terrace work on W. 1e Avenue, complete as Lump specified Sum 1 1.00 $14,000.00 127 Terrace work on W. 17`h Avenue, complete as Lump specified Sum 1 1.00 $11,000.00 128 Terrace work on Michigan Street (W. South Park Avenue to W. 11O Avenue), complete Lump asspecified Sum 1 1.00 $6,000.00 129 Terrace work on Michigan Street (W. I e Avenue to W. 17 h Avenue), complete as Lump specified Sum 1 1.00 $6,000.00 130 Excavation special, com lete as s ecified Tons 1 2,200 2147.69 -52.31 $9.10 $476.02 SECTION I -(BID ITEMS 100 -130) - SUB- TOTALS $82,256.22 ($116,811.43) ADDITIONAL WORK REQUIRED: C,O. # 3- SECTION I ITEM Furnish and install #4 bars BID INSTALLED NE7 NET UNIT INCREASE IN DECREASEIN NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACTPRlCE 10000 Furnish and install #4 bars into existing sidewalk, 1 1 complete as � I Each 0.00 261.00 261.00 $3.45 $900.45 Page 2 of 14 12 -04 Change Order #3 FINAL_ ITEM NUMBER DESCRIPTION UNIT BID QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UN1r PRICE INCREASEIN CONTRACTPRICE DECREASE IN CONTRACTPRICE 10001 QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT.PRICE CONTRACTPRICE $4,400.00 2034 Furnish and install curb at building on the southeast Linear corner of W. 15th Avenue Feet 30 31.00 1.00 $60.00 $60.00 2036 and Oregon Street, Lump complete as specified Sum 0.00 1.00 1.00 $635.00 $635.00 10002 Additional labor and Feet 1,250 1,216.90 -33.10 545.00 $1,489.50 2042 equipment to remove gate at the east end of E. 15th Linear Avenue, complete as Lump 1,650 1,619.90 - 30.10 $44.00 $1,324.40 2044 specified Sum 1 0.00 1 1.00 1 1.00 1 $105.00 $105.00 ADDITIONAL WORK: C. o. # 3 - (ITEMS 10000 - 10002) - SUB-TOTAL $1,640.45 $0.00 NET DECREASE TO: SECTION 1 ($32,914.76) SECTION 11- STORM SEWER ITEM DESCRIPTION UNIT BID INSTALLED I NET NET UNIT 114CIZEASEIN DECREASEIN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT.PRICE CONTRACTPRICE 2014 Utility line opening, complete as specified Each 5 0.00 -5.00 $880.00 $4,400.00 2034 Furnish and install 10" storm sewer, complete as Linear s ecified Feet 30 31.00 1.00 $60.00 $60.00 2036 Furnish and install 12" storm sewer, complete as Linear specified Feet 1,250 1,216.90 -33.10 545.00 $1,489.50 2042 Furnish and install 15" storm sewer, complete as Linear specified Feel 1,650 1,619.90 - 30.10 $44.00 $1,324.40 2044 Furnish and install 15" RCP Class III storm sewer, Linear complete asspecified Feet 400 388.10 -11.90 $47.00 $559.30 2048 Furnish and install 18" storm sewer, complete as Linear specified Feet 200 216.20 16.20 $55.00 $891.00 2054 Furnish and install 21" storm sewer, complete as Linear specified Feet 50 36.80 -13.20 $80.00 $1,056.00 2060 Furnish and install 24" storm sewer, complete as Linear s ecified Feel 275 253.20 -21.80 $60.00 $1,308.00 2066 Furnish and install 27" storm sewer, complete as Linear specified Feet 25 10.00 - 15.00 $85.00 $1,275,00 2072 Furnish and install 30" storm sewer, complete as Linear specified Feet 710 681.30 - 28.70 $70.00 $2,009.40 2078 Furnish and install 36" storm sewer, complete as Linear specified Feet 475 426.80 1 -48.20 $86.00 $4,145.20 2096 Furnish and install 54" storm sewer, complete as Linear speciled Feet 575 547.00 -28.00 $156.00 $4,368.00 2114 Fumish and install 72" storm sewer, complete as Linear specified Feet 110 100.00 -10.00 $1,835.00 $18,350.00 Page 3 Of 14 12 -04 Change Order #3 FINAL ITEM DESCRIPTION UNIT SID INSTALLED NET NET UNIT INCREASE IN DECREASEIN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACTPRICE CONTRACTPRICE 2116 Furnish and install 72" RCP Class III storm sewer, Linear complete asspecified Feet 50 47.60 -2.40 $332.00 $796.80 2120 Furnish and install 14 "x 23" HERCP Class III storm sewer, complete as Linear specified Feet 310 299.80 -10.20 $65.50 $688,10 2128 Furnish and install 24 "x 38" HERCP Class III storm sewer, complete as Linear specified Feet 375 366.00 -9.00 $91.30 $821.70 2132 Furnish and install 29" x 45" HERCP Class III storm sewer, complete as Linear specified Feet 300 269.50 -30.50 $115.00 $ 2140 f=urnish and install 38" x 60" HERCP Class III storm sewer, complete as Linear specified Feet 675 640.30 1 -34.70 $156.50 2172 Furnish and install 3' x 6' box culvert storm sewer, Linear corn lete ass ecified Feel 600 566.30 -33.70 $311.00 ;($5,430.55) .70 2174 Furnish and install 4'x 6' box culvert storm sewer, Linear complete as specified Feel 1 350 347.80 1 - 2.20 $342.00 $752.40 2220 Furnish and install 3' x 6' box culvert storm sewer with manhole or inlet riser, Linear complete asspecified Feet 8 8.00 $352.00 2222 Furnish and install 4'x 6' box culvert storm sewer with manhole or inlet riser, Linear complete ass ecified Feet 16 16.00 $356.00 2280 Furnish and install 6" storm lateral, complete as Linear specified Feet 4,800 4,567.40 - 232.60 $34.50 $8,024,70 2284 Furnish and install storm sewer marker balls, corn fete ass ecified Each 350 324.00 1 -26.00 $20.00 $520.00 2286 Furnish & Install clay dams, cam fete asspecified Each 175 161.00 -14.00 $30.00 $420.00 2288 Furnish & install lateral inlet, complete asspecified Each 175 132.00 -43.00 $327.00 $14,061.00 2326 Furnish and install 72" RCP Class III apron endwall with joint ties, complete as specified Each 1 1.00 $5,500.00 2488 Furnish and install 84" casing pipe by trenchless methods, complete as Linear specified Feet 110 79.90 -30.10 $1.00 $30.10 2532 Furnish and install standard storm manhole (4' diameter), complete as Vertical specified Feet 1 100 100.69 0.69 1 $250.00 $172.50 2534 Furnish and install standard storm manhole (5' diameter), complete as Vertical specified Feet 18 17.17 -0.83 $385.00 $319.55 Page 4 of 14 12 -04 Change Order #3 FINAL. ITEM DESCRIPTION UNIT BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACTPRICE CONTRACTPRICE 2536 Furnish and install standard storm manhole (6' diameter), complete as Vertical specified Feet 10 12.55 2.55 $435.00 $1,107.51 2538 Furnish and install standard storm manhole (7' diameter), complete as Vertical specified Feet 16 10.75 -5.25 $570.00 52,992.50 2550 Furnish and install standard storm manhole (7' x 7' box), complete as Vertical specified Feet 60 58.96 -1.04 $910.00 $946.40 2558 Furnish and install standard storm inlet manhole (5' diameter), Vertical complete ass specified Feet 15 1 11.88 -112 1 $327.00 51,020.24 2580 Furnish and install storm junction chamber, complete as specified Each 5 5.00 $18,200.00 2584 Furnish and install standard storm manhole riser (4' diameter), Vertical complete as specified Feet 5 6.45 1.45 $250.00 $362.50 2612 Furnish and install Type 1 inlet, complete ass specified Each 4 3.00 -1.00 $1,370.00 51,370.00 2614 Furnish and install Type 3 inlet (with 18" sump), complete as specified Each 75 73.00 -2.00 $1,510.00 53,020.00 2800 Connect to existing stoma sewer, complete as specified Each 2 7.00 5.00 $300.00 $1,500.00 2802 Connect to existing storm lateral, complete as specified Each 15 4.00 -11.00 $100.00 51,100.00 2806 Connect to existing manhole, complete as specified Each 1 0.00 -1.00 $735.00 $735.00 2808 Connect to existing inlet, complete ass specified Each 1 0.00 -1.00 $735.00 5735.00 2820 Abandon 8" -12" storm sewer, complete as Linear specified Feel 975 1 975.00 1 1 $2.90 Page 5 of 14 12 -04 Change Order #3 FINAL ITEM DESCRIPTION UNIT BID INSTALLED NET NET UNIT INCREASEIN DECREASEIN NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE 2822 Abandon 16'& larger storm sewer, complete as Linear s ecified Feet 800 800.00 $4.00 2824 Remove 30' & smaller storm sewer, complete as specified Each 1,325 1,325.00 $20.25 2830 Abandon storm manholes Each 1 -4.00 1 -4.00 1 $2,500.00 and inlets, complete as specified Each 50 47.00 -3.00 $340.00 51,020.00 2858 Furnish, install, maintain, and remove Type D modified inlet protection, complete as specified Each 239 168.00 -71.00 $60.00 $4,260.00 2860 Sediment removal - Type D modified inlet protection, complete asspecified Each 239 12.00 - 227.00 $10.00 $2,270.00 2866 Furnish, install, maintain, and remove stone bag, complete as specified Each 50 0.00 - 50.00 $13.00 $650.00 2888 Furnish, install, maintain and remove 12" diameter sediment togs, complete as Linear specified Feet 120 96.00 -24.00 $11.00 $284.00 2876 Furnish, install, maintain, and remove turbidity barrier, complete as specified Each 1 1.00 1 $2,000.00 2930 Furnish and install Class I, Type A erosion control Square mat, complete as specified Yards 63 1,593.89 1,530.89 $11.00 $16,839.79 2948 Furnish and install heavy rip -rap with filter fabric, Square complete asspecified Yards 122 89.00 -33.00 $190.00 $6,270.00 SECTION II - (BID ITEMS 2014 -2948) - SUB - TOTALS $20,933.30 ($112,770.64) ADDITIONAL. WORK REQUIRED, C.O. # 2 - SECTION II ITEM Furnish & install 8 -inch storm sewer, complete as specified Linear Foot BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES I INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE 2032 Furnish & install 8 -inch storm sewer, complete as specified Linear Foot 54.50 54.50 $60.00 20000 Credit given to City to allow PTS Contractors to Cast -In Place, instead of using Pre - Cast Structures for four Junction Chambers, per letter dated June 12, 2012, complete as specified Each 1 -4.00 1 -4.00 1 $2,500.00 Page 6 of 14 12 -04 Change Order #3 FINAL ITEM NUMBER DESCRIPTION UNIT BID QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACTPRICE DECREASEIN CONTRACTPRICE 20001 Additional labor, materials, UNIT QUANTITY QUANTITIES IN DECREASE PRICE CONTRACTPRICE CONTRACTPRICE and equipment to modify Feet 3,950 3,877.50 -72.50 $56.60 $4,103.54 3002 Junction Chamber 15 -23 to include a Type III Inlet, per Lump Invoice number 12 -605 Sum 0.00 1.00 1.00 -17.30 $813.61 $813.61 $1,110.66 20001 T &M -10, dated August 6, 2012, complete as Lump s ecified Sum 1 1.00 1 1.00 1 1 $2,820.00 $3,586.44 ADDITIONAL WORK: C.O. # 2 -(ITEMS 2036 & 20000 - 20001) - SUB -TOTAL $0.00 $0.00 ADDITIONAL WORK REQUIRED: C.O. # 3 - SECTION It ITEM DESCRIPTION UNIT BID INSTALLED NET NET UNIT INCREASEIN DECREASE IN NUMBER and equipment to move UNIT QUANTITY QUANTITIES IN DECREASE PRICE CONTRACTPRICE CONTRACTPRICE 20002 Additional labor, materials, BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER and equipment to move UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE lateral drain inlet @ 525 W. Feet 3,950 3,877.50 -72.50 $56.60 $4,103.54 3002 17th Avenue, per Invocie 12 -605 T &M -8, compiete Lump ass specified Sum 0.00 1.00 1.00 -17.30 $813.61 $813.61 $1,110.66 20001 Price adjustment to Bid Item 20001 from Change Linear Order #2, Lump sum price Feet 1 1,350 1,395.60 45.60 $78.65 $3,586.44 3012 should have been $2920, not $2820, per Invoice 12- Lump 605, T &M -10 Sum 0.00 1.00 1.00 -33.70 $100.00 $100.00 $4,473.68 ADDITIONAL WORK: C.Q. # 3 - (ITEM 20002 & 20001) - SUB -TOTAL $913.61 $0.00 NET DECREASE TO: SECTION ll ($90,923.73) SECTION III - SANITARY SEWER ITEM Furnish and install 8" BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE 3000 Furnish and install 8" sanitary sewer relay, Linear complete asspecified Feet 3,950 3,877.50 -72.50 $56.60 $4,103.54 3002 Furnish and install 10" sanitary sewer relay, Linear complete asspecified Feet 210 192.70 -17.30 $54.20 $1,110.66 3004 Furnish and install 12" sanitary sewer relay, Linear complete as specified Feet 1 1,350 1,395.60 45.60 $78.65 $3,586.44 3012 Furnish and install 24" sanitary sewer relay, Linear complete as specified Feel 610 576.30 -33.70 $132.75 $4,473.68 3060 Furnish and install 8" sanitary sewer drop, Vertical complete as specified Feel 18 17.51 -0.49 $400.00 $196.00 3064 Furnish and install 12° sanitary sewer drop, Vertical complete as specified Feet 9 7.90 -1.10 $420.00 $462.00 3100 Furnish and install standard sanitary manhole (4' diameter), complete as Vertical specified I Feet 250 1 247.01 1 - 2.99 1 $232.00 $693.68 Page 7 of 14 12 -04 Change Order #3 FINAL ITEM DESCRIPTION UNIT BID INSTALLED NET NET UNIT INCREASEIN DECREASEIN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT.PRICE CONTRACTPRICE 3114 Furnish and install external manhole chimney seat, complete as specified Each 34 27.00 -7.00 $360.00 $2,520.00 3116 Furnish and install external manhole chimney seal extension, complete as specified Each 8 3.00 - 5.00 $320.00 $1,600.00 3118 Furnish and install internal manhole chimney seal, cam fete ass ecified Each 2 5.00 1 3.00 $340.00 1 $1,020.00 3200 Furnish and install 8" x 4" factory wyes or tees, complete as specified Each 5 0.00 - 5.00 $70.00 $350.00 3204 f=urnish and install 12" x 4" factory wyes or tees, complete as specified Each 1 5 0.00 1 -5.00 $150.00 $750.00 3210 Furnish and install 8" x 6" factory wyes or tees, complete ass specified Each 95 98.00 3.00 $71.00 $213.00 3212 Furnish and install 10" x 6" factory wyes or lees, complete as specified Each 4 0.00 - 4.00 $115.00 $460.00 3214 Furnish and install 12" x 6" factory wyes or tees, complete as specified Each 34 30.00 1 -4.00 $165.00 $660.00 3222 Furnish and install 6" "Insert -A -Tee" or "Kor -N- Seal ", complete as s ecified Each 20 17.00 - 3.00 $115.00 $345.00 3230 Furnish and install 4" sanitary laterals new, Linear complete as specified Feet 190 127.00 -63.00 $68.50 $4,315.50 3234 Furnish and install 4 "16" sanitary lateral relay, Linear complete asspecified Feet 4,800 4,390.30 - 409.70 $69.00 $28,269.30 3235 Furnish and install 4 "16" sanitary riser relay, Linear complete asspecified Feet 100 159.50 59.50 $67.00 $3,986.50 3236 Furnish and install sanitary lateral marker balls, com lete asspecified Each 340 336.00 -4.00 $20.00 $80.00 3238 Furnish and install clay dams, complete as specified Each 170 161.00 -9.00 $88.00 $792.00 3300 Furnish and install connections to existing 8" mains, complete as specified Each 1 10 10.00 $580.00 3304 Furnish and install connections to existing 12" mains, complete as specified Each 3 3.00 $600.00 Page 8 of 14 12 -04 Change Order #3 FINAL ITEM DESCRIPTION UNIT BID INSTALLED NET NET UNIT INCREASEIN DECREASE IN NUMBER UNIT QUANTITY QUANTITIES QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACTPRICE CONTRACTPRICE 3306 Fumish and install Foot 20.00 $1,960.00 $336.00 connections to existing 15" mains, complete as specified Each 2 1.00 -1.40 $700.00 $700.00 3310 f=urnish and install connections to existing 21" mains Each 2 1.00 -1.00 $800.00 $840.00 3312 Furnish and install connections to existing 24" mains Each 3 2.00 - 1.00 $1,000.00 $1,000.00 3402 Furnish and install 8" open cut casing pipes, complete Linear as specified Feet 210 198.00 -12.00 $90.00 $1,080.00 3406 Furnish and install 12" open cut casing pipes, Linear complete as specified Feet 20 20.00 $112.00 3600 Rock excavation, complete Cubic as specified Yards 225 177.50 -47.50 $244.00 $11,400.00 3700 Televise sanitary sewer, Linear complete as specified Feet 6125 6,047.10 -77.90 $1.85 $144.11 3800 Abandon sanitary manholes, complete as ,specified Each 10 9.00 -1.04 $390.00 $390.00 3802 Abandon 8' sanitary sewer, Linear complete as specified Feet 650 625.00 -25.00 $1.70 $42.50 3804 Abandon 10° sanitary sewer, complete as Linear specified Feet 25 20.00 -5.00 1 $8.00 $40.00 3806 Abandon 12" sanitary sewer, complete as Linear specified Feet 300 215.00 -85.00 $1.70 $144.50 3814 Abandon 24° sanitary sewer, complete as Linear specified Feet 1 630 600.00 -30.00 $3.00 $90.00 3850 Remove sanitary sewer, Linear complete ass specified Feet 450 420.00 -30.00 1 $28.00 $840.00 3900 Sanitary Sewer Utility Line Openings (ULO), complete as specified Each 1 1.00 $900.00 SECTION III -(BID ITEMS 3000 -3900) - SUB - TOTALS $8,805.94 ($67,862.43) ADDITIONAL. WORK REQUIRED; C.O. # 1 - SECTION III ITEM Furnish and install 15" BID BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES IN DECREASE PRICE CONTRACTPRICE CONTRACTPRICE 3006 Furnish and install 15" BID INSTALLED NET NET UNIT INCREASE IN DECREASEIN DESCRIPTION NUMBER UNIT QUANTITY sanitary sewer relay, Linear 1 1 CONTRACTPRICE 1 complete ass ecifed Feet 20.00 20.00 Foot 20.00 $1,960.00 ADDITIONAL_ WORK: C. 0. # 1 - (ITEM 3006) - SUB -TOTAL $0.00 $0.00 ADDITIONAL WORK REQUIRED; C.O. # 2 - SECTION III ITEM Furnish and install 36 -inch BID INSTALLED NET NET UNIT INCREASE IN DECREASEIN DESCRIPTION NUMBER UNIT QUANTITY QUANTITIES IN DECREASE I PRICE CONTRACTPRICE CONTRACTPRICE 3416 Furnish and install 36 -inch open cut casing pipe, Linear I 1 complete as specified Foot 20.00 20.00 $336.00 Page 9 of 14 12 -04 Change Order #3 FINAL ITEM NUMBER DESCRIPTION UNIT BID QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACTPRICE DECREASE IN CONTRACTPRICE 30000 Additional labor, materials, and equipment to have Linear Great Lakes TV Seal Feet 50 41.00 - 9.00 $100.00 $900.00 4002 rehabilitate MH 03 -31, with a spray liner, complete as Lump specified Sum 1.00 1.00 $2,850.00 30001 Additional labor, materials, Fee! 1 485 528.20 43.20 1 $84.00 $3,628.80 4004 and equipment to break out concrete poured around existing manhole in the Linear intersection of W. 15th Feet 5,545 5,535.00 - 10.00 $68.40 $684.00 4006 Avenue and Nebraska Street and core into existing man hole at a Linear lower elevation due to Foot 110 101.00 - 9.00 $200.00 51,800.00 4008 utility conflicts per Invoice 12- 605- T&M -7, dated June 13, 2012, complete as Lump specified Sum 1.00 1.00 -78.00 $2,643.20 $7,137.00 ADDITIONAL WORK; C. O. # 2 - (ITEMS 3416 & 30000- 30001) -SUB -TOTAL $0.00 $0.00 NET DECREASE TO: SECTION III ($59,046.49) SECTION IV - WATER MAIN ITEM DESCRIPTION UNIT BID INSTALLED NET NET UNIT INCREASE IN DECREASEIN NUMBER QUANTITY QUANTITIES INCREASE I DECREASE I PRICE I CONTRACTPRICE CONTRACTPRICE 4000 Furnish and install 4" ductile iron water main with poly wrap relay, complete Linear asspecified Feet 50 41.00 - 9.00 $100.00 $900.00 4002 Furnish and install 6' ductile iron water main with poly wrap relay, complete Linear asspecified Fee! 1 485 528.20 43.20 1 $84.00 $3,628.80 4004 Furnish and install 8° ductile iron water main with poly wrap relay, complete Linear asspecified Feet 5,545 5,535.00 - 10.00 $68.40 $684.00 4006 Fumish and install 10° ductile iron water main with poly wrap relay, complete Linear as specified Foot 110 101.00 - 9.00 $200.00 51,800.00 4008 Furnish and install 12" ductile iron water main with poly wrap relay, complete Linear ass specified Feet 1,390 1,312.00 -78.00 $91.50 $7,137.00 Page 10 of 14 12 -04 Change Order #3 FINAL ITEM DESCRIPTION UNIT BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACTPRICE CONTRACTPRICE 4036 Furnish and install 1" water service relay, complete as Linear specified Feel 4,200 4,727.40 527.40 $53.20 $28,057.68 4042 Furnish and install 1 "water service new, complete as Linear specified Feet 190 184.00 -6.00 $70.00 $420.00 4048 Furnish and install 1" corporation and stop box, complete as specified Each 1 160 156.00 -4.00 $270.00 $1,080.00 4054 Furnish and install water service day dams, complete lete asspecified Each 160 157.00 -3.00 $30.00 $90.00 4056 Furnish and Install connections to existing 4" water main, complete as specified Each 1 2 1.00 1 -1.00 $1,300.00 $1,300.00 4058 Furnish and install connections to existing 6" water main, complete as specified Each 14 17.00 3.00 $1,460.00 $4,380.00 4060 Furnish and install connections to existing 8" water main, complete as specified Each 1 6 5.00 -1.00 $1,570.00 $1,570.00 4062 Furnish and install connections to existing 10" water main, complete as specified Each 3 2.00 -1.00 $1,760.00 $1,760.00 4064 Furnish and install connections to existing 12" water main, complete as s ecified Each 1 3 2.00 1 -1.00 $2,000.04 $2,000.00 4109 Furnish and install 8" x 4" tee, complete as specified Each 2 1.00 -1.00 $317.00 $317.00 4110 Furnish and install 8" x 6" tee, complete asspecified Each 18 14.00 - 4.00 $386.00 $1,544.00 4111 Furnish and install 8" x 8" tee, complete asspecified Each 2 1.00 -1.00 $445.00 $445.00 4128 Furnish and install 12" X 6" tee, complete as specified Each 6 5.00 -1.00 $687.00 5687.00 4189 Furnish and install 8" x 8" cross, complete as specified Each 5 5.00 $592.00 4190 Furnish and install 8" X 10" cross, complete as specified Each 2 1.00 -1.00 $700.00 $700.00 4191 Furnish and install 8" x 12" cross, complete as specified Each 3 2.00 -1.00 $800.00 $800.00 4226 Furnish and install 4° 22 degree bend, complete as specified Each 2 0.00 -2.00 $146.00 5292.00 4227 Furnish and install 6" 22 % degree bend, complete as specified Each 2 1.00 -1.00 $182.00 4228 and install 8° 22'/ F$182.00 IFumish degree bend, complete as specified I Each 2 1 2.00 1 1 $245.00 Page 11 of 14 12 -04 Change Order #3 FINAL ITEM DESCRIPTION UNIT BID INSTALLED NET NET UNIT INCREASEIN DECREASEIN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACTPRICE CONTRACTPRICE 4229 Furnish and install 10' 22 %2 degree bend, complete as specified Each 2 0.00 - 2.00 $350.00 $700.00 4230 Furnish and install 12' 22 S/ degree bend, complete asspecified Each 2 2.00 $560.00 4235 Furnish and install 4" 45 degree bend, complete as specified Each 2 0.00 -2.00 $146.00 $292.00 4236 f=urnish and install 6" 45 degree bend, complete as specified Each 29 63.00 34.00 $192.00 $6,528.00 4237 Furnish and install 8" 45 degree bend, complete as s ecified Each 16 21.00 1 5.00 $250.00 $1,250.00 4238 Furnish and install 10' 45 degree bend, complete as specified Each 6 5.00 AM $360.00 $360.00 4239 Furnish and install 12' 45 degree bend, complete as s ecified Each 1 6 4.00 -2.00 $565.00 $1,130.00 4263 Furnish and install 8" x 4" reducer, complete as specified Each 1 0.00 1 -1.00 $200,00 $200.00 4264 Furnish and install 8" x 6" reducer, complete as specified Each 15 16.00 1.00 $215.00 $215.00 4352 Cut and cap existing 6" water main, complete as specified Each 6 6.00 $170.00 4354 Cut and cap existing 8" water main, complete as specified Each 1 1.00 $240.00 4400 Furnish and install 4' gate valve, complete as specified Each 2 1.00 -1.00 $872.04 $872.00 4401 Furnish and install 6" gate valve, complete as specified Each 22 23.00 1.00 $1,021.00 $1,021.00 4402 Furnish and install 8" gate valve, complete as specified Each 35 33.00 -2.00 $1,386.00 $2,772,00 4404 f=urnish and install 12' gate valve, complete as s ecified Each 10 7.00 -3.00 $2,420.00 57,260.00 4410 Furnish and install 6" cut -in valve, complete as specified Each 1 1 0.00 1 -1.00 $1,890.00 $1,890.00 4419 Furnish and install 6" X 6" tapping valve & sleeve, complete as specified Each 3 1.00 -2.00 $1,400.00 $2,800.00 4500 Furnish and install hydrant, complete ass ecifed Each 19 18.00 -1.00 $2,920.00 52,920.00 4504 Furnish and install gradelok for hydrant branches, complete as specified Each 19 0.00 -19.00 $430.00 58,17D.OD 4712 Furnish and install 2' steel casing pipe, complete as Linear specified I Feet 250 210.00 - 40.00 1 $46.00 $1,840.00 Page 12 of 114 12 -04 Change Order #3 FINAL ITEM DESCRIPTION UNIT RID INSTALLED NET NET UNIT INCREASEIN DECREASE IN NUMBER UNIT QUANTITY QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACTPRICE CONTRACTPRICE 4724 Furnish and install 16° Feet 38.00 38.00 $60.00 4049 steel casing pipe, complete Linear as specified Feet 45 49.00 4.00 $140.00 $560.00 4800 Rock excavation, complete Cubic 1.00 1.00 $125.00 4049.1 as specified Yards 38 9.80 - 28.20 $350.00 $9,870.00 4900 Abandon water main on W. 1Z' Avenue, complete as Lump 1.00 1.00 $305.00 4403 specified Sum 1 1.00 $1,175.00 4902 Abandon water main on Michigan Street (W. South Each 2.00 2.00 $2,000.00 4429 Park Avenue to W. 11'" Avenue), complete Lump asspecified Sum 1 1.00 $1,175.00 4904 Abandon water main on W. 15'h Avenue, complete as Lump specified Sum 1 1.00 $1,175.00 4906 Abandon water main on W. 170 Avenue, complete as Lump specified Sum 1 1.00 $1,175.00 4998 Abandon water main on Michigan Street (W. 18'� Lump Avenue to W. 17th Sum 1 1.00 1 1.00 1 1 1$23,041.56 Avenue), complete as Lump specified Sum 1 1.00 $1,175.00 4920 Remove water main, Linear complete as specified Feet 1,325 1,315.00 -10.00 $45.00 5450.OD SECTION 1V - (BID ITEMS 4000 -4920) - SUB - TOTALS $45,640.48 ( #$5,234.00) ADDITIONAL WORK REQUIRED; C.O. # 1 - SECTION IV ITEM Furnish & install 1 -114" RID INSTALLED NET NET UNIT 1NCREASEIN DECREASEIN NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE I PRICE CONTRACTPRICE CONTRACTPRICE 4037 Furnish & install 1 -114" water service relay, Linear complete as specified Feet 38.00 38.00 $60.00 4049 Furnish & install 1" stop box and rod only, complete as specified Each 1.00 1.00 $125.00 4049.1 Furnish & install 1 -114" Corporation and stop box, complete ass ecified Each 1.00 1.00 $305.00 4403 Furnish & install 10 -inch gate valve, complete as specified Each 2.00 2.00 $2,000.00 4429 Furnish & install 12" x 8" tapping valve & sleeve, complete asspecified Each 1.00 1 1.00 $2,022.00 40000 Additional labor, time, and materials to install water services on Oshkosh Avenue with the DOT limits under emergency work, per Invoices 12 -605 T &M -1 through 12 -605 T &M -3, complete as specified Lump Sum 1 1.00 1 1.00 1 1 1$23,041.56 Page 13 of 14 12 -04 Change Order #3 FINAL ITEM NUMBER DESCRIPTION UNIT BID QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACTPRICE DECREASEIN CONTRACTPRICE 40001 Additional labor, time, and Linear QUANTITY QUANTITIES IN DECREASE PRICE CONTRACTPRICE CONTRACTPRlCE 40002 materials to cut and cap Foot 20.00 20.00 $193.00 40003 existing water main and install gate valve in the 17th & Ohio intersection, per Invoice 12 -605 T &M -4, complete as specified Lump repair sleeve, per Invoice Sum 1 1.00 1 1.00 1 $1,288.00 ADDITIONAL WORK: C.O. # 1 pTEMS 403740001) - sue -TOTAL ADDITIONAL WORK REQUIRED: C.O. # 2 - SECTION IV $0.00 $0.00 ITEM DESCRIPTION UNIT BID INSTALLED NET NET UNIT I INCREA$EIN DECREASE IN NUMBER trenchless casing pipe, Linear QUANTITY QUANTITIES IN DECREASE PRICE CONTRACTPRICE CONTRACTPRlCE ADDITIONAL. WORK: C.O. # 2 (ITEMS 40002 - 40005) - SUB -TOTAL NET DECREASE TO: SECTION IV NET INCREASE TO SECTIONS I, 11, III, IV NET DECREASE TO SECTIONS 1, 11, 111, IV NET DECREASE TO CONTRACT: Page 14 of 14 $0.00 $0.01) ($19,593.62) $160,190.00 ($362,668.50) ($202,478.50) Furnish & install 12 -inch trenchless casing pipe, Linear 40002 complete asspecified Foot 20.00 20.00 $193.00 40003 Additional labor, materials, and equipment to cut out existing 12" x 6" tapping tee and replace with a 12" repair sleeve, per Invoice 12. 605- T &M -5, dated June 13, 2012, complete as Lump specified Sum 1 1.00 1.00 $1,393.67 40004 Additional labor, materials, and equipment to cap existing 6 "watermain by old hydrant, due to leaky valve that was shut off but still leaking, per Invoice 12- 605-T&M-6, dated June 13, 2012, complete as Lump specified Sum 1.00 1.00 $956.36 40005 Additional labor, materials, and equipment to repair water main break when valve broke while trying to strut it off, per Invoice 12- 605-T&M-9, dated July 13, 20112, complete as Lump s ecified Sum 1 1.00 1 1.00 1 $1,841.00 ADDITIONAL. WORK: C.O. # 2 (ITEMS 40002 - 40005) - SUB -TOTAL NET DECREASE TO: SECTION IV NET INCREASE TO SECTIONS I, 11, III, IV NET DECREASE TO SECTIONS 1, 11, 111, IV NET DECREASE TO CONTRACT: Page 14 of 14 $0.00 $0.01) ($19,593.62) $160,190.00 ($362,668.50) ($202,478.50)