Loading...
HomeMy WebLinkAbout0123351-Building (sign) . OSHKOSH ON THE WATER Job Address 3630 STEARNS DR CITY OF OSHKOSH No 123351 BUILDING PERMIT.. APPLICATION AND RECORD Owner DANIEL E DOWLING Create Date 01/30/2007 Designer Contractor BECK SIGNS Category 254 - Signs Plan Type o Building . Sign o Canopy o Fence o Raze Zoning Class of Const: Size Unfinished/Basement Sq.Ft. Sq.Ft. Rooms Height Ft. o Projection I Finished/Living Bedrooms Stories Canopies Garage Sq.Ft. Baths Signs Foundation 0 Poured Concrete 0 Floating Slab o Concrete Block . Post o Pier 0 Other o Treated Wood Occupancy Permit Not Required Flood Plain Height Permit Park Dedication # Dwelling Units o # Structures o Use/Nature arehouse /Install a 6x12, 9' Tall ilium ground sign in vicinity of Stearns Entrance, install a 6x12 ilium wall sign and 1x18 non-ilium wall of Work ign on south face of building, HV AC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $0,00 Permit Fee Paid $88,00 Park Dedication $0.00 Issued By: Date 01/30/2007 FinaIlO.P. 00/00/0000 o Permit Voided I Parcel Id # 1278800000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) secu any ssa approvals before starting such activity. Signatur ' Date 1/ Sc(2oJ1 -'.'-""", Address AgenUOwner OSHKOSH ~ 54904 - 0000 Telephone Number 920-231-1160 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (Le. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the projectis ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.