HomeMy WebLinkAbout0123351-Building (sign)
.
OSHKOSH
ON THE WATER
Job Address 3630 STEARNS DR
CITY OF OSHKOSH No 123351
BUILDING PERMIT.. APPLICATION AND RECORD
Owner DANIEL E DOWLING Create Date 01/30/2007
Designer
Contractor BECK SIGNS
Category
254 - Signs Plan
Type
o Building
. Sign
o Canopy
o Fence
o Raze
Zoning
Class of Const:
Size
Unfinished/Basement
Sq.Ft.
Sq.Ft.
Rooms
Height Ft.
o Projection I
Finished/Living
Bedrooms
Stories
Canopies
Garage
Sq.Ft.
Baths
Signs
Foundation 0 Poured Concrete 0 Floating Slab
o Concrete Block . Post
o Pier 0 Other
o Treated Wood
Occupancy Permit Not Required
Flood Plain
Height Permit
Park Dedication
# Dwelling Units
o
# Structures
o
Use/Nature arehouse /Install a 6x12, 9' Tall ilium ground sign in vicinity of Stearns Entrance, install a 6x12 ilium wall sign and 1x18 non-ilium wall
of Work ign on south face of building,
HV AC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuation
$0,00 Permit Fee Paid
$88,00 Park Dedication
$0.00
Issued By:
Date 01/30/2007
FinaIlO.P. 00/00/0000
o Permit Voided I
Parcel Id # 1278800000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) secu any ssa approvals before starting such activity.
Signatur '
Date
1/ Sc(2oJ1
-'.'-""",
Address
AgenUOwner
OSHKOSH
~ 54904 - 0000 Telephone Number 920-231-1160
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (Le. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the projectis ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.