HomeMy WebLinkAboutLunda/CH OR 2 River Walk CHANGE ORDER NO. 2 TO: LUNDA CONSTRUCTION Date: January 2, 2013 2000 Taylor St Little Chute,WI 54140 Your present contract with the City of Oshkosh for construction of Riverwalk improvements/dock installations for the City Center Riverwalk project is hereby amended and changed as follows: INCREASE: Bid Items Amount H-3 Load/Transport Sediment/Impacted Soil $38,548.00 CO-2 Elimination of Electrical Boxes <$ 1,474.00> CO-3 Light Electrical Components/Cabinet $30,711.75 CO-4 Add Security Fence Beckets to Plaza $ 385.00 CO-5 Eliminate redundant light grounding <$ 563.00> CO-6 Change PVC Electrical Conduit to Aluminum $21,621.63 CO-7 Add Expansion Couplings to Conduit $ 3,753.75 CO-8R1 Redesign of Station 21+00 to 23+00(Hotel) $64,640.00 CO-9 Redesign of Station 13+50 to 14+50(City Center Plaza) $ 9,500.00 CO-10 Redesign of Station 14+50 to'15+57(East of Plaza) $ 8,000.00 CO-11 Redesign of Station 15+60 to 20+95(Parking Lot) $82,770.00 CO-12 Redesign of Station 10+00 to 15+60(Beckets) $47,250.00 NET INCREASE-CHANGE ORDER#2 $305,143.13 Original Base Bid Amount $2,874,590.70 Alternate Bid Amount(hotel section) $1,024,040.00 $3,898,630.70 INCREASE C.O.#1 $ 254,858.00 INCREASE C.O.#2 $ 305,143.13 Revised Contract Amount $4,458,631.83 RECD ED: CITY OF OSHKOSH fv, ', BY: �"T6-i� Xef'-X7— Community Development Director City M ::o 1 t a1lit .fit! I_ _ City Clerk I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh,Wisconsin, under the within APPROVED AND ACCEPTED: C Order. — �4'� tii �r� �lr Finance Director Lunda Construction Inc. Ap.rr ed as to form: n ►.. , :!i • ,�__ It enson, Ci ` rney - i`1 Oude ige,JE /_ D'iis'v,J Maw CITY OF • DMIP) REQUEST FOR QUOTATION ON W R • CHANGE ORDER NO.: TO CONTRACTOR: Lunde Construction Inc. PROJECT: City Center Riverwaik PROJECT NO: 80250485 OWNER: City Of Oshkosh Redevelopment Authority ENGINEER: AECOM The following modifications)to the Contract arc hereb■ ordered (use additional pages if required): 12/18/2012 Delete(2)Each SS Junction Boxes on the West Side of the Main Street Bridge: Credit ($1,474.00) Athichm,cnts (! ist Supporting Documents): Contract Amount or Price I Contract Times(Calculate Days) Original $ Original Duration Days Previous Change Order(s) Previous Change Order(s) (Add/Deduct) (Add/Deduct) s Da $ Y This Chant e Order / This Change Order / 'edu `' > (Add/Deduct) Days Revised Contract Amount $ Revised Contract Time Days The Revised Contract Completion Date is: 20 Owner Contractor Engineer Recommendation By: ° By: Date: Date: /2/0200/2 Date: ` i 1 OF Y;.FITS; : T.1; REQUEST FOR QUOTATION CHANGE ORDER NO.: 2A(voids RFQ 2)() TO CONTRACTOR: Lundy Construction Inc. PROJECT: City Center Riverwalk PROJECT NO: 60250465 OWNER: Cr Of Oshkosh Redevelopment Authority ENGINEER: AECOM As directed In RFI 1,Electrical Component and Cabinet Additions. Change plane and specifications to strike OWNER PROVIDED and change to CONTRACTOR PROVIDE. Please note all labor for assembly has already been included in the base bid. Please proved cost break down per item. Add equipment include all supplies and labor for items listed below. City will not be providing equipment. State would like complete separate communication eyeball Att,, mit tf t sui)t,ortinci Dccume nt.t. RFI1 and items below with all costs for equipment and labor required Communication Vaults add 8,Item C,detail 10-211,on Sheet E 2.1 Commundatln Pull Box at Bridges add 4,item.l,on Sheet E1.0 Contract Amount or Price Contract Times(Calculate Days) Original $ Original Duration Days Previous Change Order(a) Previous Change Order(s) (Add/Deduct) (Add/Deduct) Days Change Order 7f This Change Order ) $ 7/(- (Add/Deduct) Days Revised Contract Amount $ Revised Contract Time Days The Revised Contract Completion Date is: ,20 Owner Contractor Engineer Recommendation Date: Date: J/i2/X/20/Z Date: :_ j/(i , g g REV 00107 FORM 273 LUNDA CONSTRUCTION COMPANY SINCE 1938 1' 2000 TAYLOR STREET•P.O.BOX 228 � LITTLE CHUTE,WI 54140 Iii PH: (920)788-5238 FAX: (920) 788-0229 re1:r�c�r cry INDUSTRIAL DIVISION LITTLE CHUTE,w► An Equal Employment Opportunity Employer • Constructing Safely May 4, 2012 AECOM 558 North Main Street Oshkosh, WI 54901 Attn: Paul Timm Re: City of Oshkosh City Center Riverwalk Project Oshkosh,Wisconsin Electrical Service Change Order Request Mr. Timm, Please see the Change Order Request below for the changes to the electric service for the above mentioned project. After talking with the City of Oshkosh Electrical Inspector, he will let us install the 30kVa transformer in a 24in deep cabinet but he said the cabinet has to be Nema4X because it is outdoors. The cabinet is much larger than prior so there was additional labor added to account for that. There will be approximately 18-20 inches of width left for any future equipment. The panelboard will only have enough breakers for this project. We can install spare breakers if the city provides them to us prior to installing the panel. Also the contractors were not originally in the scope of work as the specifications stated to have termination blocks on din rail. Also, after speaking with AECOM, the correct quantity of added Communication Vaults is five. Changes are as follows: > Larger Concrete Pad (36"x72"x31") $ 390.60 Cabinet(24"x60"x72") $ 9,645.30 > Exhaust Fan with Thermostat $ 937.65 > Contractors $ 961.80 • Panelboard $ 845.25 • Communication Vaults (5) $11,270.70 ➢ Communication Pull Boxes $ 7,863.45 ➢ Deduct Channel Supports, Strut, Footings, Term Blocks ($ 1,203.00) Total Change Order Request: $30,711.75 (Thirty Thousand Seven Hundred Eleven Dollars and Seventy-Five Cents) 2000 Taylor St. •P.Q. Box 228 •Little Chute, WI 54140-0228 •Phone: 920-788-5238•FAX: 920-788-0229 401 Alderson St. • P.O. Box 288 •Schofield, WI 54476-0288•Phone: 715-355-4848 •FAX: 715-355-7710 , + Alternate to trace out existing site lighting circuits: Add $2,184.00 If you should have any further questions or concerns regarding this change order request, please feel free to contact me. Respectfully Submitted, Lunda Construction Company Ind ial Division 1 4 eve. ,_s_________ -aul J. Gev-rs Project Manager PJG/clg 0.4)DY:;;len■ REQUEST FOR QUOTATION CHANGE ORDER NO.: 4 TO CONTRACTOR: Lunda Construction Inc. PROJECT: City Center Riverwalk PROJECT NO: 60250465 OWNER: City Of Oshkosh Redevelopment Authority ENGINEER: AECOM The following modification(s)to the Contract are hereby ordered (use additional pages if required): Add fencing to all access from Beckets through the plaza until plaza construction starts. Reason for Modification(s): Part of the Access Agreement with City Center,LLC. Contract Amount or Price I Contract Times(Calculate Days) Original $ Original Duration Days Previous Change Order(s) Previous Change Order(s) (Add/Deduct) $t? (Add/Deduct) Days This Change Order This Change Order (Add/ ) $385, 00 (Add/Deduct) Days Revised Contract Amount $ Revised Contract Time Days The Revised Contract Completion Date is: ,20 Owner Contractor Engineer mmendation By: By: / • / By: Date: Date: (/-2/7/ Date: 4-- 7/ 8-3 REV 06/07 FORM 273 CITY OF OJHKOJH REQUEST FOR QUOTATION ON THE WATER j CHANGE ORDER NO.: J� TO CONTRACTOR: Lunda Construction Inc. PROJECT: City Center Riverwalk PROJECT NO: 60250465 OWNER: City Of Oshkosh ENGINEER: AECOM The following modification(s)to the Contract are hereby ordered (use additional pages if required): Eliminate redundant grounding as requested by City of Oshkosh Electrical Department. Base Bid Item F-1 $ Alternate(Hotel Area)Item F-1 $ Reason for Modification(s): Changes in Electrical Grounding Requirements Attachments(List Supporting Documents): Contract Amount or Price Contract Times(Calculate Days) Original $ Original Duration Days Previous Change Order(s) Previous Change Order(s) (Add/Deduct) $ (Add/Deduct) Days This Change Order This Change Order . Deduct) $<5C - (Add/Deduct) Days Revised Contract Amount $ Revised Contract Time Days The Revised Contract Completion Date is: , 20 Owner Contractor Engineer Recommendation By: 4 ° if By: Date: Pate: /26//20/Z Date: B-3 REV 06/07 FORM 273 rr • _ �{� = REQUEST FOR QUOTATION /�, l!/ CHANGE ORDER NO.: /D TO CONTRACTOR: Lunde Construction Inc. P1tOJECT—CIVTO Riveiwalk PROJECT-NO:-60250465 OWNER: City Of Oshkosh Redevelopment Authority ENGINEER: AECOM Change 1-Inch PVC Conduit for Bollards to Rigid Aluminum 1-Inch for the Entire Project. Base Bid Deduct for Elimination of 1-Inch PVC, 1080 IF: ($1,650.54) Adding 1-Inch Ridged Aluminum, 1080 LF: $18,551.16 Alternate Hotel Deduct for Elimination of 1-Inch PVC,280 LF: ($395.20) Add 1-Inch Ridged Aluminum,280 IF: $5,116.21 h: son f c ion( Change in materiel to account for location of conduit for wiring associated with the Bollards long the riverwalk as compared to the high water level of the Fox River. Aluminum will stand freezing,UV and floating debris better than PVC. .1 Contract Amount or Price [ Contract Times(Calculate Days) Original $ Original Duration Days Previous Change Order(s) Previous Change Order(s) (Add/Deduct) $ (Add/Deduct) Days This Change Order , This Change Order (Add/9sduet) $ ?/ 42L (Add/Deduct) Days Revised Contract Amount $ Revised Contract Time Days The Revised Contract Completion Date is: ,20 Owner Contractor neer - .•mmendatlgn By:B y o By: v� . Date: Date: 42//20/j Date: q_ • CITY OF �;' Of HKOf H REQUEST FOR QUOTATION °;:',�.� ON THE WATER /1 CHANGE ORDER NO.: • TO CONTRACTOR: Lunda Construction Inc. PROJECT: City Center Riverwalk PROJECT NO: 60250465 OWNER: City Of Oshkosh ENGINEER: AECOM The following modification(s)to the Contract are hereby ordered (use additional pages if required): Revision of Electrical Conduit Expansion Coupling Reason for Modification(s): Code requires expansion coupling on conduit that is not buried. Attachments (List Supporting Documents): See attached June 26,2012 Lunda Memo. Contract Amount or Price I Contract Times(Calculate Days) Original $ Original Duration Days Previous Change Order(s) Previous Change Order(s) (Add/Deduct) $ (Add/Deduct) Days Y This Change Order 3 This Change Order (AddEDee et) $ 3 753 ? (Add/Deduct) Days Revised Contract Amount $ Revised Contract Time Days The Revised Contract Completion Date is: ,20 Owner Contractor Engineer Recommendation By: `13y: 11.„..,e� Date: Date: /.7/2//k`y Date: B-3 REV 06/07 FORM 273 LUNDA CONSTRUCTION COMPANY '� 2000 TAYLOR STREET•P.O. BOX 228 b` SINCE 1938 ' LITTLE CHUTE,WI 54140 I PH: (920)788-5238 FAX: (920)788-0229 INDUSTRIAL DIVISION N-TT-I-----�l LITTLE CHUTE.VII An Equal Employment Opportunity Employer • Constructing Safely June 26, 2012 AECOM :f 558 North Main Street , Oshkosh, WI 54901 I - } Attn: Paul Timm Re: City of Oshkosh City Center Riverwalk Project Oshkosh, Wisconsin s z Change Order Request—PVC Expansion Couplings Mr. Timm, Please see the Change Order Request below for adding PVC expansion couplings as PVC will be routed exposed under the slab. Code requires that we install expansion couplings to allow for the expansion and contraction of the PVC pipe with the warming and cooling temperatures. { 55 ea 3"and 35 ea 1" PVC Expansion Couplings: Total Change Order Request: $3,753.75 (Three Thousand Seven Hundred Fifty-Three Dollars and Seventy-Five Cents) If you should have any further questions or concerns regarding this change order request, please feel free to contact me. Respectfully Submitted, Lunda Construction Company trial Division ap,/,AS -14 e Paul J. Ge rs Project Manager PJG/c!g C% 2000 Taylor St. •P.O. Box 228 •Little Chute,WI 54140-0228 •Phone: 920-788-5238 •FAX: 920-788-0229 401 Alderson St. • P.O.Box 288 •Schofield, WI 54476-0288 •Phone: 715-355-4848 •FAX: 715-355-7710 CITY OF 1:" REQUEST FOR QUOTATION CHANGE ORDER NO.: 8R-1 TO CONTRACTOR: Lunda Construction Inc. PROJECT: City Center Riverwalk PROJECT NO: 60250465 OWNER: City Of Oshkosh ENGINEER: AECOM The following modification(s)to the Contract are hereby ordered(use additional pages if required): This RFQ supersedes and eliminates RFQ 8. Elimination of reconstruction of planter bed retaining walls from west half of Hotel Area station 21+10 to 22+05 Detail K, S3.5. Extension of 8-inch reinforced concrete walkway to building, Detail K, S3.5. Redesign of east most planter wall as noted on the attached drawing. Item D-1, Alternate Bid Hotel Area Revision of Hotel Portion concrete cap and of concrete slab reinforcement per the attached sketches. Changes in ramp wall and addition of form liner. Addition for changes as noted including labor and supplies $ 64,640 Reason for Requested change of elimination of planters by Hotel owners and Hotel Sea Nloditication(s): all construction was not constructed as anticipated or designed as •etermined by exploratory openings in the existing Riverwalk structure. Structural fill previously placed to support the concrete decking has settled. I'evision of the concrete deck and seawall cap beam rebar is required to aintain design criteria. This work is considered part of the rock anchor ystem B-3 REV 06/07 FORM 273 • Attachments (List Supporting The following is AECOM's clarification on the placement of Documents): reinforcing bars in the 8-inch slab between Sta. 21+00 to 23+10 The#4 bars in the top and bottom mat shall be staggered so they are not directly over each other. The bottom#7 and top#5 bars shall be placed directly over each other. Reinforcing placement Shop Drawings shall be noted with clarification number for layout of these bars, as necessary. They are to be installed in this manner to provide at a minimum of 1-inch clear between#4 bar and#5 or#7 bar for 3/4-inch aggregate (#67 Stone ASTM C-33)per the approved concrete mix design. This is an ACI 318 code requirement and has a minimum clear between bar of 3/4- Resided Drawings to replace appropriate Construction drawing set drawings. Please note that the change from 12'-3"to 11"-9 1/2"for the width of the boardwalk, the Pier Layout C will also need to shift in 5.5"on Sheet S5.1 and S5.2. Attachments Revised Sheets S2.7A, S3.5, S4.5AS4.6 Contract Amount or Price I Contract Times(Calculate Days) Original $ Original Duration Days Previous Change Order(s) Previous Change Order(s) (Add/Deduct) $ (Add/Deduct) Days This Change Order / `/�', ^ This Change Order m (Add/ et) $ c...7 c v_ (Add/Deduct) Days Revised Contract Amount $ Revised Contract Time Days The Revised Contract Completion Date is: ,20 Owner Contractor Q G " Engineer Recommendation By: a /� �- �'By: Date: Date: /?/.2/JZ /2■ Date: B-3 REV 06/07 FORM 273 CRY QF Y" REQUEST FOR QUOTATION CHANGE ORDER NO.: 9 TO CONTRACTOR: Lunda Construction Inc. PROJECT: City Center Riverwalk PROJECT NO: 60250465 OWNER: City Of Oshkosh ENGINEER: AECOM The following modification(s)to the Contract are hereby ordered(use additional pages if required): Station 13+50 to 14+50 Reconstruction of City Center Plaza per attached plan sheet C 5.0,C 5.0(A), S2.3A, S2.4A. S2.4B,S2.5. Provide and Install approximately 105 CYD of topsoil for landscape area in planters RFQ 9 $9,500 Reason for Modification(s): City Center Requested Change Attachments(List Supporting Documents): Drawings C 5.0, C 5.0(A), S2.3A, S2.4A.S2.4B, S2.5. Contract Amount or Price Contract Times(Calculate Days) Original $ Original Duration Days Previous Change Order(s) Previous Change Order(s) (Add/Deduct) $ (Add/Deduct) Days This Change Order This Change Order (Add/IOW ) $ '5remr (Add/Deduct) Days Revised Contract Amount $ Revised Contract Time Days The Revised Contract Completion Date is: Owner Contractor Engineer Recommendation By: y: /C y1"G..'-" By: Date: Date: 42/100/?i Date: B-3 REV 06/07 FORM 273 CflY 0 L � r REQUEST FOR QUOTATION CHANGE ORDER NO.: 10 TO CONTRACTOR: Lunda Construction Inc. PROJECT: City Center Riverwalk PROJECT NO: 60250465 OWNER: City Of Oshkosh ENGINEER: AECOM The following modification(s)to the Contract are hereby ordered(use additional pages if required): Station 14+50 to 15+57 Provide materials and labor per revised drawings S2.4, S2.4B S2.5 RFQ 10 $8,000 Reason for Modification(s): Exsisting Condtions were different than orginal design drawings. There were missing piles per the design plans and exsisting piles were out of alignment. Attachments(List Supporting Documents): Drawings S2.4, S2.4B S2.5 Contract Amount or Price Contract Times(Calculate Days) Original $ Original Duration Days Previous Change Order(s) Previous Change Order(s) (Add/Deduct) $ (Add/Deduct) Days This Change Order /- This Change Order (Add/Bill. $ (Add/Deduct) Days Revised Contract Amount $ Revised Contract Time Days The Revised Contract Completion Date is: Owner Contractor Engineer Recommendation By: C 4or_ -2 By: Date: Date: i,'L ,2//20,2---- Date: B-3 REV 06/07 FORM 273 rrr OF REQUEST FOR QUOTATION CHANGE ORDER NO.: 11 TO CONTRACTOR: Lunda Construction Inc. PROJECT: City Center Riverwalk PROJECT NO: 60250465 OWNER: City Of Oshkosh ENGINEER: AECOM The following modification(s)to the Contract are hereby ordered(use additional pages if required): Station 15+60 to 20+95 Addition of approximately 140 LF of 6X6X1/2 inch Galvanized Steel Channel $36,500 60"Storm Sewer Manhole Reconfiguration and Tie Back Grade Beam Repairs $14,000 Various Size Private Storm Sewer Outfall Repairs $2,270 Demolition and Replacement of Additional 4 inches of concrete $29,000 RFQ 11 Total $82,770 Plan set detail revision to include 6X6X1/2 inch steel channel to meet design standards for ntilevered Riverwalk section. Existing Conditions were different than original design drawings for the storm sewers and ncrete. Attachments(List Supporting Documents): Drawings S2.4, S2.4B S2.5 Contract Amount or Price Contract Times(Calculate Days) Original $ Original Duration Days Previous Change Order(s) Previous Change Order(s) (Add/Deduct) $ (Add/Deduct) Days This Change Order This Change Order (Add/ ). $ `3'p2 72�—�- (Add/Deduct) Days Revised Contract Amount $ Revised Contract Time Days The Revised Contract Completion Date is: Owner Contractor Engineer Recommendation � By: B Mt,t +/� IC By: Date: Date: /276,/S24l�---- Date: B-3 REV 06/07 FORM 273 CRY t?F 1110410 REQUEST FOR QUOTATION CHANGE ORDER NO.: 12 TO CONTRACTOR: Lunda Construction Inc. PROJECT: City Center Riverwalk PROJECT NO: 60250465 OWNER: City Of Oshkosh ENGINEER: AECOM The following modification(s)to the Contract are hereby ordered (use additional pages if required): Station 10+00 to 15+60(Beckets) Adjustment of Wood Laging and Precast Panels including Panel Repair $17,950 Demoltion and Replacement of discovered loading dock slab $29,300 RFQ 12 Total $47,250 Exsisting conditions on sea wall varied from design plans and were not visible prior to onstruction A concrete slab was discovered and identified as part of a historical loading dock. The oncrete slab is part of the seawall tie back system and required replacement with the cap beam Attachments(List Supporting Documents): Drawings S2.0A,S2.3A,S2.5, FSK 1A Contract Amount or Price Contract Times(Calculate Days) Original $ Original Duration Days Previous Change Order(s) Previous Change Order(s) (Add/Deduct) $ (Add/Deduct) Days Y This Change Order This Change Order (Addict) $ 7a, (Add/Deduct) Days Revised Contract Amount $ Revised Contract Time Days The Revised Contract Completion Date is: Owner Contractor Engineer Recommendation By: , 6 1 By: Date: Date: 01 a2/ 1012 Date: B-3 REV 06/07 FORM 273