HomeMy WebLinkAbout0085886 - Building (roof) (-.9D CITY OF OSHKOSH No 0085886
OSHKOSH BUILDING PERMIT -APPLICATION AND RECORD
ON THE WATER
Job Address 1619 MOUNT VERNON ST Owner CHARLES J SCHILTZ Create Date 05/09/2001
Designer Contractor LANDMARK CONSTRUCTIN GROUP INC
Category 141 -Exterior Remodeling Plan
Type • Building 0 Sign 0 Canopy 0 Fence 0 Raze
Zoning Class of Const: Size
Unfinished/Basement Sq.Ft. Rooms Height Ft. D Projection
Finished/Living Sq.Ft. Bedrooms Stories Canopies
Garage Sq.Ft. Baths Signs
Foundation 0 Poured Concrete 0 Floating Slab 0 Pier 0 Other
0 Concrete Block 0 Post 0 Treated Wood
Occupancy Permit Not Required Flood Plain Height Permit
Park Dedication #Dwelling Units 0 #Structures 0
Use/Nature SFR\Tear off and replace roofing on garage due to hail damage.*NO STRUCTURAL WORK
of Work
HVAC Contractor Plumbing Contractor
Electric Contractor
Fees: Valuation $3,000.00 Plan Approval $0.00 Permit Fee Paid $30.00 Park Dedication $0.00
(r
Issued By: Date 05/09/2001 Final/O.P.
0 Permit Voided
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
1 `
Signature ✓//i /:;-,11"..,---",-2- - 1.----� 47/t /
/ '. ,-.,, / ` Date _/ .
Agent/Owner
Address 172 KOELLER STREET OSHKOSH WI 54902 - 0000 Telephone Number (920)233-7100
,p
MAY 08 2000 10: 00AM HP LASERJET 3200 p. 10
Please check all applicable boxes and fill out as much information as possible. Thank
you.
1 Address of Property 1 \ 9 0111 +-
2 The Property is owned by
3 I am the ❑ Owner
or
I am theeContractor. Name: .j IT CA 1
4 The contractor doing the work is
5 This is a angle Family Residence, ❑ Duplex, ❑ Multi-Family Residence
6 Work being done:
ROOFING
Tar off and replace existing roofing on ❑ house, L ■ arage
❑ Replace wood decking
❑ Add 1 layer of roofing to the existing layer(s) on ❑ house, 0 garage
This work is being done due to7Q -lail Q Damage ❑ Other
SIDING
❑ Install siding on ❑ house, ❑ garage
O Replacing vinyl with vinyl
Q Replacing steei or alumiP• - with vinyl
❑ Replacing with
This work is ?na done due to ❑ Hail Damage ❑ Other
❑ tall new or ❑ Replace gutters
• Install new or❑ Replace downspouts
• Other work being done: (please note)
Value of the job $ O . DO (include fair market price for labor even if you are
not paying for labor)