HomeMy WebLinkAbout2013-Building (sign) CITY OF OSHKOSH No 154276
OSHKOSH BUILDING PERMIT -APPLICATION AND RECORD
ON THE WATER
Job Address 321 N SAWYER ST Owner RICHARDNIRGINIA NASLUND REV TRUST Create Date 01/16/2013
Designer John Beck Contractor BECK SIGNS INC
Inspector Nicole Krahn
Category 254-Signs Plan
Type 0 Building • Sign 0 Canopy O Fence O Raze
Zoning C-2 Class of Const: Size
Unfinished/Basement Sq.Ft. Rooms Height Ft. ❑ Projection
Finished/Living Sq.Ft. Bedrooms Stories Canopies
Garage Sq.Ft. Baths Signs 1
Foundation 0 Poured Concrete 0 Floating Slab O Pier 0 Other
O Concrete Block 0 Post 0 Treated Wood
Occupancy Permit Not Required Occupancy Fee $0.00 Flood Plain Height Permit Not Required
Park Dedication Not Required #Dwelling Units 0 #Structures 0
Use/Nature Commercial--install on internally illuminated cabinet sign on east elevation for"Home Town Pharmacy" (UL#CA478464) **check#4178
of Work
HVAC Contractor Plumbing Contractor
Electric Contractor
Fees: Valuation $1,850.00 Plan Approval $0.00 Permit Fee Paid $69.00 Park Dedication $0.00
Issued By: 2577)I A Date 01/28/2013 Final/O.P. 00/00/0000
❑ Permit Voided Parcel Id# 1610750200
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party,if you perform the work
described in this permit application within an easement,the City strongly urges the permit applicant to contact the easement
holder(s -~•'• secure any ne ry appr. befi
- starting such activity.
I have read and :-`jnd th re me ••ed inf ation. (/ 2 87/3
Signature AC� �4 Dat e
Agent/Owner
Address 2269'•��� RTON DR OSHKOSH WI 54904 - 8211 Telephone Number (920)231-1160
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number,Type of
Inspection(i.e. Footing, Service, Final,etc.),Access into Building if Secure(how do we gain entry),your Name and Phone
Number. Unless specified otherwise,we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.