Loading...
HomeMy WebLinkAbout0154250 - Building (Awnings/ Canopies) CITY OF OSHKOSH No 154250 OSHKOSH BUILDING PERMIT -APPLICATION AND RECORD ON THE WATER Job Address 3031 OREGON ST Owner JBWC PROPERTIES LLC Create Date 01/23/2013 Designer OTA,Alan Benzschawel Contractor GRIESE CONSTRUCTION INC Inspector Nicole Krahn Category 255-Awnings/Canopies Plan Type 0 Building O Sign • Canopy ❑ Fence 0 Raze Zoning M-3 Class of Const: Size Unfinished/Basement Sq.Ft. Rooms Height Ft. ❑ Projection Finished/Living Sq.Ft. Bedrooms Stories Canopies Garage Sq.Ft. Baths Signs Foundation • Poured Concrete 0 Floating Slab O Pier O Other 0 Concrete Block 0 Post 0 Treated Wood - — Occupancy Permit Not Required Occupancy Fee $0.00 Flood Plain Height Permit Not Required Park Dedication Not Required #Dwelling Units 0 #Structures 0 Use/Nature Commercial--install 9'6"w x 3'4"h x 4'projection aluminum staple frame awning per plan for"Eagle Installation". "check#21222 of Work HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $1,480.00 Plan Approval $0.00 Permit Fee Paid $69.00 Park Dedication $0.00 Issued By: ■„,C Date 01/23/2013 Final/O.P. 00/00/0000 ❑ Permit Voided Parcel Id# 1413450000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party,if you perform the work described in this permit application within an easement,the City strongly urges the permit applicant to contact the easement holder(s)and to secure any necessary approvals before starting such activity. I have read and understand the afore mentioned information. Signature Date Agent/Owner Address PO BOX 3221 OSHKOSH WI 54903 - 3221 Telephone Number 235-2420 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number,Type of Inspection (i.e. Footing, Service, Final,etc.),Access into Building if Secure(how do we gain entry),your Name and Phone Number. Unless specified otherwise,we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.