HomeMy WebLinkAbout06. 13-13
JANUARY 22, 2013 13-13 RESOLUTION
(CARRIED___7-0____LOST________LAID OVER_______WITHDRAWN_______)
PURPOSE: GRANT EASEMENT TO PACUR LLC NORTH OF 3555 MOSER
STREET
INITIATED BY: PACUR LLC
PLAN COMMISSION RECOMMENDATION: Approved
BE IT RESOLVED by the Common Council of the City of Oshkosh that the
proper City officials are hereby authorized and directed to grant an easement to Pacur
LLC to allow Pacur to install a storm sewer across city-owned land on the north side of
3555 Moser Street, per the attached, and the proper City officials are authorized and
directed to execute any and all documents necessary for purposes of same.
O1HKOlH
ON THE WATER
TO: Honorable Mayor and Members of the Common Council
FROM: Darryn Burich
Director of Planning Services
DATE: January 17, 2013
RE: Grant Easement to Pacur LLC North of 3555 Moser Street (Plan Commission
recommends approval)
BACKGROUND
The subject site is located in the City's North Industrial Park. The City -owned property is a 15
foot wide by 606 foot long strip of land containing a railroad spur line servicing Pacur, LLC to
the south. The Town of Oshkosh property to the north of the spur line is under the same
ownership as Pacur, LLC and is currently undeveloped and being used agriculturally. The
rest of the surrounding area is exclusively used for manufacturing and industrial purposes,
most of which is located within the North Industrial Park.
ANALYSIS
Pacur, LLC is in the process of a parking lot expansion project located on the northeast area
of their property located at 3555 Moser Street which requires an expansion of their storm
water management infrastructure in the form of construction of a detention basin. As the site
does not have adequate area to accommodate the basin, the owner is proposing to construct
the basin off -site to the north and directionally bore underneath the City's railroad spur
property to connect to the planned basin. The Department of Public Works has reviewed and
approved of the request and the appropriate easement documents will be signed and
recorded at the Winnebago County Register of Deeds.
FISCAL IMPACT
None anticipated,
RECOMMENDATION
The Plan Commission approved of this request at its January 15, 2013 meeting.
Approved,
C4 Manager
ITEM: GRANT STORM SEWER EASEMENT FOR PROPERTY NORTH OF 3555
MOSER STREET
Plan Commission meeting of January 15, 2013
GENERAL INFORMATION
Petitioner: Pacur LLC, Suneer Patel
Owner: City of Oshkosh
Action Requested:
Suneer Patel, representing Pacur, LLC, is requesting a 20 foot by 15 foot storm sewer easement
from the city to install a 12 inch storm sewer across a 15 foot strip of city -owned land to connect
with a proposed storm basin located north of the City properly. This request was initiated as part of
a parking lot project at 3555 Moser Street which required expansion of the property's storm water
management infrastructure.
Applicable Ordinance Provisions: N/A
Property Location and Type:
The subject site is located in the City's North Industrial Park. The City -owned property is a 15 foot
wide by 606 foot long strip of land containing a railroad spur line servicing Pacur, LLC to the south.
The Town of Oshkosh property to the north of the spur line is under the same ownership as Pacur,
LLC and is currently undeveloped and being used agriculturally. The rest of the surrounding area is
exclusively used for manufacturing and industrial purposes, most of which is located within the
North Industrial Park.
Analysis:
Pacur, LLC is in the process of a parking lot expansion project located on the northeast area of their
property located at 3555 Moser Street. The proposed improvements required an expansion of their
storm water management infrastructure, more specifically, construction of a detention basin. The
property did not have enough area on -site available to construct the basin, therefore the owner
proposed to construct the basin off-site on their property located to the north of the city owned
property (spur property). To connect the planned basin, the petitioner proposed to the City to
directionally bore underneath the City's railroad spur property. The Department of Public Works
reviewed the request and does not have any concerns with the proposal.
The Department of Public Works and City Attorney is working with the property owner to have
appropriate easement documents signed and recorded at the Winnebago County Register of Deeds.
Staff supports the easement request as this will not have a negative impact on the City's or
surrounding properties and is needed to allow Pacur to proceed with their site improvements.
RE COMMENDATION /CONDITIONS
Staff recommends approval of the granting of the proposed storm sewer easement as requested.
The Plan Commission approved of the proposed easement as requested. The following is the Plan
Commission's discussion on this item,
Mr. Nau presented the item and reviewed the site and surrounding area as well as the zoning
classifications in said area. He stated that the storm water management infrastructure is in the form
of a detention basin to be constructed north of the property and the easement would allow
connection to this basin by boring underneath the existing railroad spur located on City property.
Mr. Thoms questioned if the Town of Oshkosh has already approved the construction of the
detention basin as it would be located outside of the city limits,
Steve Gohde, Assistant Director of Public Works, stated that the basin would require a building
permit as it is located on the property owner's land however he was not aware if the Town has
approved a building permit for the structure at this time.
Ms. Lohry inquired where the storm water runoff would go,
Mr. Nau responded that the water would go north via the storm sewer located in the easement, if
approved, to the planned detention basin which would be located in the southeast corner of the
property.
Ms. Lohry requested clarification on the map as to the location of the detention Basin,
Mr. Nau displayed the location of the basin on the map.
Mr. Gohde stated that the detention basin would be tied into the public storm system on Moser
Street however construction on the basin has not yet begun.
Mr. Hinz questioned if the approval of the easement was necessary to move forward with the
detention basin construction.
Mr, Gohde indicated that there was not adequate space on the existing site for the basin and Pacur
had plans to expand their business which was necessitating the requirement for additional storm
water management.
Mr. Thoms inquired if there were any concerns regarding the integrity of the railroad spur line.
Mr. Gohde responded that the spur line takes precedence and the property owner would be
responsible for any damage to it.
Motion by Nollenberger to approve the easement for property north of 3555 Moser Street.
Seconded by Cummings. Motion earned 6-0.
Item -Grant EasementlMoser St
(0
GH
ON THE WATER
APPLICANT INFORMATION
Petidoner: Suneer Patel
Petitioner's Address: 3555 Moser Street
City of Oshkosh
General Application
"PLEASE TYPE OR PRINT USING BLACK INK **
Telephone #: (924 ) 230 -9140 Fax; (
city: Oshkosh
SUBMIT TO.
Dept, of Community Dcvelopment
215 Church Ave., P.O. Box 1130
Oshkosh, W1 54901
PHONE: (920) 235 -5059
Date: 11/29/12
State: WI Zip: 54901
Other Contact # or Email: spatel @pacur.com
Status of Petitioner (Please Check ); ❑p ner �]✓ Representative [�I enant []Prospective Buyer
Petitioner's Signature (required): ✓�nr� Date: %% 2 911
OWNER INFORMATION
owner(s); City of Oshkosh c/o Director of Public Works Date; 11/29112
Owner(s) Address: P.O. Box 1130
Telephone #: ( 920 ) 236 -5000
Fax; (
City: Oshkosh
Other Contact# or Email:
Ownership Status (Please Check): QIndividual [Trust []Partnership OCorporation
State: W Zip: 54913
Property Owner Consent; (required)
By signature hereon, I/We acknowledge that City officials and/or employees may, in the performance of their functions, enter upon the
property to inspect or gather other information necessary to process this application. I also understand that all meeting dates are tentative
and may be postponed by the Planning Services Division for incomplete submissions or other administrative reasons.
Property Owner's Signature:
TYPE OF REQUEST-
-
Access Control Variance
✓ .Easement
Privilege in Street (identify)
Other (identify)
SITE INFORMATION
Date:
Address/Location of Proposed Project: 3555 Moser Street r
Proposed Project Type: Storm sewer Installation
Current Use of Property: Rallroad Zoning: M -3 General lndushial
Land Uses Surrounding Your Site: North: farmland
South: industrial
East; Industrial
West: Industrial -
Application fees are due at time of submittal, Make check payable to City of Oshkosh.
D Please refer to the fee schedule for appropriate fee. FEE IS NON - REFUNDABLE
For more information please visit the City's website at www,ci,oshkosh.wi.us/ Community _DevelopmenVPlanning.htm
Staff 1 " �h]
Date Reed � �f
TA
Easement Narrative
pacur, LLC— Oshkosh, WI
Proposed Easement Narrative
Proposed Use of the Property: Install a new storm sewer under the existing railroad.
Existing Use of the Property: Railroad
Id of Existing Structures on the Property and Discussion of their Relation to the Project:
The only structure currently located on the property is the Canadian Northern Rail Spur. The
project will be constructed in accordance with all rail requirements and will have no effect on the
operation of the rail.
Number of Residents /Employees /Daily Customers: None
Proposed Dwelling Units /Floor Area /Landscape Area /Parkign Area: None,
Effects on Adjoining Properties: None
Surrounding sand Uses, Farmland and Industrial
Compatibility of the Proposed Use with Adjacent and Other Properties: The proposed
installation will have no affect on the adjacent and other properties in the area.
Traffic Generation: None
Other: None
3
/I
V, MA��-
11
F:, ?Raj
wz -n7.71
--.t
i
-UMILLS H I Don ;rSc
IBUEJ
0 L% Ysomso
Laa,IR U?-SDN 029C
SIN3MAOUdYll ails NIHON
asnougum unoyd
/I
V, MA��-
11
F:, ?Raj
wz -n7.71
--.t
i
The Ch of Oshkosh creates and maintains GIS maps and data for its wn use. They may show the
approximate relative location of property, boundarles and other feature from a variety of sources.
These map(sydalasets are provided for information purposes only and may not be sufficient or
appropriate for legal, engineering, or surveying purposes. They are provided 'AS-IS' without
wa rmnUes of any kind and the City of Oshkosh assumes no liability for use or misuse.
1 in = 0.04 mi
I in = 207 ft
Printing Date: 117/2013
Prepared by: City of Oshkosh, Wl
U_7H.K0f H
0.4 THE WATER
5
he City of Oshkosh creates and maintains GIS maps and data for its own use. They may shvn the
)proximate relative location of property; boundades.and other feature from a variety of sources'
iese map(s)1datasets are provided for Information purposes only and may not be sufficient or
)prop6ate for legal, engineering, or surveying purposes. They are provided 'AS-IS' without
qrranflas of any kind and the City of Oshkosh assumes no habMy for use or misuse.
N
1 in = OA9 mi
I in = 1,000 ft
Printing Date: 117/2013
Prepared by: Qty of Oshkosh, W1
— e
OfHKO,fH
ON ME WATER
0