HomeMy WebLinkAboutPW CNT 11-01/ CNG OR #1 DEPARTMENT OF PUBLIC WORKS
215 Church Avenue
P.O.Box 1130
111-11110)
Oshkosh,Wisconsin 54903-1130
Ph.(920)236-5065
Fax(920)236-5068 01HKO1H
ON THE WATER
December 13, 2012
Mr. Mark De Groot
De Groot, Inc.
4201 Champion Road
Green Bay, WI 54311
Re: Change Order No. 1 (Final)
Contract 11-01
Dear Mr. De Groot:
Enclosed is an executed copy of Change Order No. 1 (Final)between the City of Oshkosh and De Groot,
Inc. regarding the abovementioned project.
If you have any questions, please call our office at (920)236-5065.
Sincerely,
^ po
David C. Patek
Director of Public Works
DCP/tlt
Enclosure: Change Order No. 1 (Final)
cc: Pam Ubrig, City Clerk(w/original)
Lynn Lorenson, City Attorney (w/copy)
Peggy Steeno, Finance Director(w/copy)
File (w/original)
1:\Engineering\11-01 Tipler Conveyance Upgrades\Project_Information\Contract Info\CHANGE ORDERS\11-01 Page 1 of 1
Executed Change Order#1 Letter_12-13-12.docx
TO: De Groot, Inc. CHANGE ORDER# 1
4201 Champion Road DATED: November 30, 2012
Green Bay, WI 54311
FINAL
Your present contract with the City of Oshkosh, Contract No. 11-01, awarded March 22, 2011, is hereby
amended and changed as follows:
NET DECREASE TO: SECTION I - PAVING (52,586.88)
NET INCREASE TO: SECTION II - STORM SEWER 11,579.99
NET DECREASE TO: SECTION III - SANITARY SEWER (7,700.14)
NET DECREASE TO: SECTION IV- WATER MAIN (3,536.79)
NET INCREASE TO CONTRACT ($52,243.82)
Section I Section II Section III Section IV
Totals (Paving) (Storm) (Sanitary) (Water)
Bid Total $849,174.62 $107,357.45 $704,770.94 $25,159.31 $11,886.92
C.O. #1 ($52,243.82) ($52,586.88) $11,579.99 ($7,700.14) ($3,536.79)
Contract Total $796,930.80 $54,770.57 $716,350.93 $17,459.17 $8,350.13
CITY OF OSHKOSH
BY:
Recommended: City Manager
Director of Public Works City Clerk
Approved and ac epted:
Contractor
I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin,
under the within Change Order. /
jea24420
4 C'ooller
Approved a • form:
--dek
City wrey
CONTRACT: 11-01 CHANGE ORDER#1 FINAL
SECTION I-CONCRETE PAVING
INCREASE IN
ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET COST PER CONTRACT DECREASE IN
NUMBER QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE CONTRACT PRICE
Concrete Pavement Square
1000 Removal,complete as Yards 314.00 354.50 40.50 $5.05 $204.53
specified
Sidewalk and Driveway Square
1010 Removal,complete as Yards 3,015.00 1,218.00 -1,797.00 $4.04 ($7,259.88)
specified
1020 Pavement Undercut, Cubic 480.00 0.00 -480.00 $22.86 ($10,972.80)
complete as specified Yards
Furnish and Install Gravel Square
1025 Shoulder Restoration, Yard 177.00 77.65 -99.35 $14.26 ($1,416.73)
complete as specified
7-IN Non-reinforced
Concrete Pavement,INCL
1030 Integral Curb with 5-IN Square 280.00 313.23 33.23 $45.64 $1,516.62
coarse aggregate base Yards
course,complete as
specified
1040 8-IN Concrete Pavement, Square 23.00 57.92 34.92 $48.78 $1,703.40
complete as specified Yards
1050 4-IN Concrete Sidewalk, Square 544.00 550.00 6.00 $3.82 $22.92
complete as specified Feet
6-IN Concrete Sidewalk Square
1060 and Driveway Apron, Feet 458.00 537.00 79.00 $4.19 $331.01
complete as specified
Asphaltic Concrete
1070 Pavement Binder, Tons 373.00 88.30 -284.70 $62.73 ($17,859.23)
complete as specified
Asphaltic Concrete
1080 Pavement Surface, Tons 290.00 144.34 -145.66 $62.73 ($9,137.25)
complete as specified
Fine Grading and
1090 Preparation for Asphalt Square 2,780.00 936.80 -1,843.20 $1.86 ($3,428.35)
Paving,complete as Yards
specified
Adjust Sanitary Cleanout
1092 and Manholes,complete Each 3.00 3.00 $404.00
as specified
Furnish and Install
1100 Crushed Stone Base Tons 240.00 140.00 -100.00 $9.77 ($977.00)
Course for Backfill,
complete as specified
1110 Sawcutting,complete as Linear 1,290.00 267.40 -1,022.60 $2.53 ($2,587.18)
specified Feet
Furnish and Install
1120 Reinforcing Rods(Epoxy Linear 90.00 315.00 225.00 $2.12 $477.00
Coated),complete as Feet
specified
1130 18 IN Curb and Gutter, Linear 190.00 24.68 -165.32 $20.15 ($3,331.20)
complete as specified Feet
1140 24 IN Curb and Gutter, Linear 50.00 56.00 6.00 $21.21 $127.26
complete as specified Feet
Page 1 of 7
•
CONTRACT:11-01 CHANGE ORDER#1 FINAL
INCREASE IN DECREASE IN
ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET COST PER CONTRACT
NUMBER QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE CONTRACT PRICE
Foundation Fill at 221 Lump
1160 South Westfield Street, Sum 1.00 1.00 $3,535.00
complete as specified
SECTION I-(BID ITEMS 1000-1160)-SUB-TOTALS $4,382.74 ($56,969.62)
NET DECREASE TO: SECTION I ($52,586.88)
SECTION II-STORM SEWER
INCREASE IN DECREASE IN
ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET COST PER CONTRACT
NUMBER QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE CONTRACT PRICE
Crack and Damage
2001 Survey,complete as Lump 1.00 1.00 $4,040.00
specified
Strip and Stockpile Square
2002 Topsoil,complete as 2,822.00 2,822.00 $1.52
Yards
specified
2006 Clear Trees,complete as Lump 1.00 1.00 $2,525.00
specified Sum
2009 Utility Locate Opening, Each 17.00 17.00 $1,515.00
complete as specified
2012 Grub Stumps,complete as Lump 1.00 1.00 $1,464.50
specified Sum
Temporary Construction Linear
2013 Fence,complete as 280.00 280.00 $5.05
Feet
specified
Remove and Replace Linear
2014 Fence,complete as Feet 50.00 85.00 35.00 $20.20 $707.00
specified
Furnish and Install Vehicle Lump
2015 Gate,complete as 1.00 1.00 $2,020.00
Sum
specified
Furnish and Install 12-IN
2038 RCP Class III Storm Linear 123.00 126.00 3.00 $37.72 $113.16
Sewer,complete as Feet
specified
Furnish and install 15-IN Linear
2044 RCP Class III Sewer, Feet 10.00 18.00 8.00 $39.72 $317.76
complete as specified
Furnish and Install 18-IN
2050 RCP Class III Storm Linear 30.00 21.00 -9.00 $44.00 ($396.00)
Sewer,complete as Feet
specified
Furnish and Install 36-IN
2080 RCP Class III Storm Linear 9.00 9.00 $82.62
Sewer,complete as Feet
specified
Furnish and Install 36-IN
2081 RCP Class III Storm Each 1.00 1.00 $1,657.08
Sewer 45°Bend,complete
as specified
Furnish and Install 34-IN x
2136 53-IN HERCP Class III Linear 15.00 16.00 1.00 $155.42 $155.42
Storm Sewer,complete as Feet
specified
Furnish and Install 38-IN x
2140 60 IN HERCP Class III Linear 8.00 0.00 -8.00 $180.66 ($1,445.28)
Storm Sewer,complete as Feet
specified
Furnish and Install 3-FT x
2172 6-FT Box Culvert Storm Linear 1,270.00 1,270.50 0.50 $260.65 $130.33
Sewer,complete as Feet
specified
Page 2 of 7
CONTRACT:11-01 CHANGE ORDER#1 FINAL
INCREASE IN
ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET COST PER CONTRACT DECREASE IN
NUMBER QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE CONTRACT PRICE
Furnish and Install 3-FT x
2173 6-FT Box Culvert Bend, Each 7.00 7.00 $3,786.42
45°angle,complete as
specified
Furnish and Install 4-FT x
2174 6-FT Box Culvert Storm Linear 429.00 416.50 -12.50 $280.28 ($3,503.50)
Sewer,complete as Feet
specified
Furnish and Install 4-FT x
2175 6-FT Box Culvert Bend, Each 2.00 2.00 $3,795.02
45°angle,complete as
specified
Furnish and Install 4-FT x
6-FT Box Culvert Tee
2177 Connection to 34-IN x Each 1.00 1.00 $4,349.90
53-IN HERCP,complete
as specified
Furnish and Install 4-FT x
2179 6-FT Box Culvert Tee Each 1.00 1.00 $3,553.01
Connection to 36-IN RCP,
complete as specified
Furnish and install 3-FT x
2181 6-FT to 4-FT x 6-FT Box Each 1.00 1.00 $4,995.29
Culvert Transition,
complete as specified
Furnish and Install Storm
2284 Sewer Marker Balls, Each 18.00 16.00 -2.00 $50.50 ($101.00)
complete as specified
Furnish and Install Clay
2286 Dams,complete as Each 7.00 7.00 $656.50
specified
Furnish and Install
2556 Standard Storm Inlet Vertical 12.00 11.50 -0.50 $1,806.82 ($903.41)
Manhole(4-FT Diameter), Feet
complete as specified
Furnish and Install Storm
2580 Junction Chamber(JC-1), Each 1.00 1.00 $19,308.30
complete as specified
Furnish and Install
2584 Standard Storm Manhole Vertical 2.50 2.50 $235.69
Riser(4-FT Dia.), Feet
complete as specified
Furnish and Install Type I
2610 Inlet(w/18-IN Sump), Each 4.00 4.00 $1,823.21
complete as specified
Furnish and Install Type 3
2614 Inlet(w/18-IN Sump), Each 6.00 6.00 $1,855.06
complete as specified
Furnish and Install Type 3
2618 Inlet Riser,complete as Each 2.00 2.00 $567.33
specified
Furnish and Install Neenah
2620
R-4345 Beehive Casting Each 14.00 0.00 -14.00 $501.14 ($7,015.96)
and Frame,complete as
specified
Connect to Existing Storm
2800 Sewer,complete as Each 12.00 12.00 $454.50
specified
Connect 4-FT x 6-FT box
Culvert to Existing
2801 Junction Chamber(STA Each 1.00 1.00 $1,212.00
30+40),complete as
specified
Page 3of7
CONTRACT:11-01 CHANGE ORDER#1 FINAL
INCREASE IN DECREASE IN
ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET COST PER CONTRACT
NUMBER QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE CONTRACT PRICE
Furnish and Install
Connection to existing 31-
2803 IN x 51-IN CMP Storm Each 1.00 1.00 $1,010.00
Sewer,complete as
specified
Connect 36-IN RCP to
2807 Existing Inlet Box(STA Each 1.00 1.00 $858.50
26+30),complete as
specified
Abandon 15-IN Larger Linear
2822 Storm Sewer,complete as Feet 554.00 554.00 $10.52
specified
Abandon Storm Manholes
2824 and Inlets,complete as Each 5.00 5.00 $303.00
specified
Furnish,Install,Maintain,
and Remove Type B Inlet
2852 Sediment Control Each 14.00 14.00 $75.75
Protection,complete as
specified
Furnish,Install,Maintain,
and Remove Type D Inlet
2856 Sediment Control Each 19.00 12.00 -7.00 $90.90 ($636.30)
Protection,complete as
specified
Furnish,Install,Maintain,
2858 and Remove Stone Each 3.00 3.00 $505.00
Tracking Pad,complete as
specified
Furnish,Install,Maintain, Linear
2860 and Remove Silt Fence, 450.00 450.00 $2.02
complete as specified
Feet
Furnish,Install,Maintain,
2868 and Remove Ditch Check, Each 2.00 2.00 $202.00
complete as specified
Install Salvaged Top Soil 6- Square
2902 IN Depth,complete as Yard 2,125.00 2,752.00 627.00 $1.26 $790.02
specified
Furnish and Install Turf Square
2920 Grass,complete as Yard 2,125.00 2,876.32 751.32 $1.01 $758.83
specified
Furnish and Install Calss I,
2932 Urban,Taype A Erosion Square
2,125.00 2,752.00 627.00 $1.52 $953.04
Control Mat,complete as Yard
specified
Page 4 of 7
CONTRACT: 11-01 CHANGE ORDER#1 FINAL
INCREASE IN
ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET COST PER CONTRACT DECREASE IN
NUMBER QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE CONTRACT PRICE
Furnish and Install
2940 Reinforced Grass Square 131.00 124.32 -6.68 $89.64 ($598.80)
Pavement System, Yards
complete as specified
Furnish and Install 3-IN-6- Square
2943 IN Riprap w/Filter Fabric, Yard 2,813.00 3,182.47 369.47 $12.98 $4,795.72
complete as specified
SECTION II-(BID ITEMS 2001 -2943)-SUB-TOTALS $8,721.28 ($14,600.25)
ADDITIONAL WORK REQUIRED: C.O.#1 - SECTION II
INCREASE IN
ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET COST PER CONTRACT DECREASE IN
NUMBER QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE CONTRACT PRICE
2280 Install 6"storm sewer Linear 0.00 61.00 61.00 $33.00 $2,013.00
lateral Foot
2802 Connect to existing storm Each 0.00 3.00 3.00 $0.00 $0.00
lateral
2944 Downtown due to utility Hours 0.00 4.00 4.00 $500.00 $2,000.00
(WPS)conflict.
Mobilization charge to re-
2945 mobilize to site after WPS Each 0.00 1.00 1.00 $3,000.00 $3,000.00
conflict resolved.
Re.Bid item 2620,casting
2946 R4346 to be used instead Each 0.00 14.00 14.00 $746.14 $10,445.96
of R4345.Furnish and
install R-4346
ADDITIONAL WORK:C.O.#1-SUB-TOTAL $17,458.96 $0.00
NET INCREASE TO: SECTION II $11,579.99
SECTION III-SANITARY SEWER
INCREASE IN
ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET COST PER CONTRACT DECREASE IN
NUMBER QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE CONTRACT PRICE
Furnish and Install 10-IN Linear
3002 Sanitary Sewer Relay, Feet 57.00 0.00 -57.00 $53.13 ($3,028.41)
complete as specified
Furnish and Install 12-IN Linear
3004 Sanitary Sewer Relay, Feet 35.00 0.00 -35.00 $47.64 ($1,667.40)
complete as specified
Furnish and Install
3114 External Chimney Seal on Each 2.00 3.00 1.00 $327.97 $327.97
Manhole,complete as
specified
Reconstruct Sanitary
3122 Sewer Manhole(4-FT Vertical 4.50 4.50 $555.50
Dia.),complete as Feet
specified
Furnish and Install 6-IN
3234 Sanitary Sewer Lateral Linear 50.00 13.00 -37.00 $44.13 ($1,632.81)
Relay,complete as Feet
specified
Furnish and Install
3302 Connections to Existing 10- Each 2.00 2.00 $1,010.00
IN Mains,complete as
specified
Page 5of7
CONTRACT: 11-01 CHANGE ORDER#1 FINAL
INCREASE IN DECREASE IN
ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET COST PER CONTRACT
NUMBER QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE CONTRACT PRICE
Furnish and Install
3304 Connections to Existing 12- Each 2.00 2.00 $1,212.00
IN Mains,complete as
specified
Furnish and Install 12-IN Linear
3406 Open Cut Casing Pipes. , Feet 30.00 25.50 -4.50 $72.39 ($325.76)
complete as specified
Furnish and Install 18-IN Linear
3410 Open Cut Casing Pipes, 37.00 0.00 -37.00 $98.95 ($3,661.15)
complete as specified
Feet
Furnish and Install 20-IN Linear
3411 Open Cut Casing Pipes, Feet 22.00 27.00 5.00 $104.44 $522.20
complete as specified
3700 Closed Circuit Televising, Linear 388.00 0.00 -388.00 $4.56 ($1,769.28)
complete as specified Feet
Abandon Sanitary Lateral
3801 at 221 South Westfield Lump 1.00 1.00 $757.50
Street,complete as Sum
specified
SECTION III-(BID ITEMS 3002-3801)-SUB-TOTALS $850.17 ($12,084.81)
ADDITIONAL WORK REQUIRED: C.O.#1 -SECTION III
INCREASE IN DECREASE IN
ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET COST PER CONTRACT
NUMBER QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE CONTRACT PRICE
Excavate,Furnish&Install
3900 Mac-Wrap around Sanitary Each 0.00 1.00 1.00 $1,000.00 $1,000.00
Manhole,and Backfill
Furnish and Install 8-IN
3000 Sanitary Sewer Relay with Linear 0.00 14.50 14.50 $40.64 $589.28
native backfill,complete as Feet
specified
Furnish and Install 8-IN
3001 Sanitary Sewer Relay with Linear 0.00 44.00 44.00 $48.13 $2,117.72
granular backfill,complete Feet
as specified
3123 Credit for Re Use of Old Each 0.00 1.00 1.00 ($172.50) ($172.50)
Cone Section
ADDITIONAL WORK: C.O.#1-SUB-TOTAL $3,534.50 $0.00
NET DECREASE TO: SECTION III ($7,700.14)
SECTION IV-WATER MAIN
INCREASE IN DECREASE IN
ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET COST PER CONTRACT
NUMBER QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE CONTRACT PRICE
Furnish and Install New S-
4004 IN Ductile Iron Water Main Linear 38.00 42.50 4.50 $101.14 $455.13
w/Polywrap,complete as Feet
specified
Install Insulation(Sanitary Square
4017 Sewer and Water Main), Feet 128.00 132.00 4.00 $2.02 $8.08
complete as specified
Furnish and Install 8-IN
4237 45°Bend,complete as Each 4.00 4.00 $481.62
specified
Page 6 of 7
CONTRACT:11-01 CHANGE ORDER#1 FINAL
INCREASE IN DECREASE IN
ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET COST PER CONTRACT CONTRACT PRICE
NUMBER QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE
Furnish and Install 8-IN $1,580.93
4411 Cut-In Valve,complete as Each 2.00 2.00
specified
Furnish and Install 18-IN Linear $121.20
4726 Steel Casing Pipe, Feet 16.00 16.00
complete as specified
Abandon Water Main Lump
4915 Service at Main,complete Sum 1.00 1.00
as specified
(Liquidated Damages I Day I 0.00 I 4.00 I 4.00 I I ($1,000.00)I ($4,000.00)1 I
SECTION IV-(BID ITEMS 404-4915)-SUB-TOTALS ($3,536.79) $0.00
NET DECREASE TO: SECTION IV ($3,536.79)
NET INCREASE TO SECTIONS I,11,111,IV $31,410.86
NET DECREASE TO SECTIONS I,II,III,IV ($83,654.68)
NET DECREASE TO CONTRACT: ($52,243.82)
Page 7 of 7