Loading...
HomeMy WebLinkAbout0153924-Building (fence) � CITY OF OSHKOSH No 153924 ' � OSHKOSH COMMERCIAL BUILDING PERMIT -APPLICATION AND RECORD ON THE WATER Job Address 1880 STILLMAN DR Create Date 12/10/2012 -]-�-i 3 �-Z Project Electric Fence Project Number 0 Owner OLD DOMINION FREIGHT LINE INC Plan : Contractor SENTRY SECURITY SYSTEMS LLC Inspector John Zarate Designer Category 251 -Fences Type of Plan Zoning M-3 Square Footage Major Occ Const Class Fire Protection 0 Sprinkled � Unsprinkled � Sprinkler Design _ _ Occupancy Permit Not Required Flood Plain Height Permit Not Required Park Dedication Not Required #Dwelling Units 0 #Structures 0 � Projection I Canopies Signs Use/Nature of Work IND/Old Dominion Freight Line/Fence*Low voltage security system fence to be installed 10'in height behind the existing perimeter fence. Per Board of Appeals approval 7-10-2013. ""check#19961 HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation 12,128.00 Plan Approval $0.00 Permit Fee Paid $131.00 Park Dedication $0.00 Issued By: Date 12/13/2012 Final/O.P. 00/00/0000 • ❑ Permit Voided I Parcel Id# 1225020000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perForm the work described in this permit application within an easement,the City strongly urges the permit applicant to contact the easement holder(s)and to secure any necessary approvals before starting such activity. I have read and understand the afore mentioned information. Signature Date AgenUOwner Address COLUMBIA SC 29210 - 0000 Telephone Number 803-404-6186 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number,Type of Inspection(i.e. Footing,Service, Final,etc.),Access into Building if Secure(how do we gain entry),your Name and Phone Number. Unless specified otherwise,we will assume the project is ready at the time the request is received. Work may continue if the inspection is not perFormed within two business days from the time the project is ready.