HomeMy WebLinkAbout2012-Plumbing (laterals) CITY OF OSHKOSH No 153844
OSHKOSH PLUMBING PERMIT -APPLICATION AND RECORD
ON THE WATER
Job Address 3735 S WASHBURN ST Owner Create Date 12/05/2012
Contractor W&D NAVIS,INC Category 444-Commercial-Exterior Laterals Plan
Inspector Jerry Fabisch
Bathtub Clothes Wshr Classrm Sink Surgeons Sink Roof Drain Deduct Meters
Shower Lndry Tray Exam Sink Sterilizer Soda Disp Wtr Sewer Mtrs
Whirlpool Sump Pump F Prep Sink RPZ Valve Coffee Maker Wtr Usage Mtrs
Lavatory San Sump/Pump FIr/Wst Sink _ Bidet Site Drain Misc.
Toilet Water Softner Hand Sink Urinal Wait.St. Fixtures
Kit Sink Standp Rec Lab Sink Beer Tap Ice Chest
Disposal Gar Drain Plaster Sink Dip Well Comm Ice Maker
Dishwasher Local Waste Sculry Sink Drink Ftn Int Grease Trap
Floor Drain Bar Sink Sery Sink Wash Ftn Ext Grease Trap
Hose Bibb Breakrm Sink Shamp Sink Catch Basin Eye Wash Statn
Water Heater
Use/Nature COMM/new water,sanitary sewer and storm laterals for newly constructed commercial shop/all work will be installed
of Work per approved plan review/all non-metallic piping shall have tracer wire
Size Material Type # Conn.Type
Sanitary Sewer 4" Plastic Lateral 1 New
Storm Sewer 10" Plastic Lateral 1 New
Water Service 8" Lateral 1 New
Parcel Id#
Valuation $30,000.00 Plan Approval , Permit Fees $150.00 El Permit Voided
Issued By .� Date 12/05/2012
In the performance of this work, I agree t. •-•.rm all work pursuant to rules governing the described construction.
While the City of Oshkosh has no .• ority to e forc- -se ent restrictions of which it is not a party, if you perform the work
described in this permit applic• on within an ea--ment, � -ity�•: gly urges the permit applicant to contact the
easement holder(s)and to s-cure any nec�ry a• y�;,4Tre starting such activity.
Signature /!� Date /Z_ c—/2.._
Agent/Owner
Address PO BOX 48 WAUPAN WI 53963 -0000 Telephone Number 1-920-324-8995
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number,Type of
Inspection (i.e. Footing,Service, Final,etc.),Access into Building if Secure(how do we gain entry),your Name and Phone
Number. Unless specified otherwise,we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.