Loading...
HomeMy WebLinkAbout0153848 - Plumbing (lateral) ( CITY OF OSHKOSH No 153848 OSHKOSH PLUMBING PERMIT -APPLICATION AND RECORD ON THE WATER Job Address 959 W 6TH AVE Owner RICHARD W HURKMAN Create Date 12/05/2012 Contractor RAND R PLUMBING, LLC Category 442-Commercial-Interior(New/Relocated Fixti Plan Inspector Jerry Fabisch Bathtub Clothes Wshr _ Classrm Sink Surgeons Sink Roof Drain Deduct Meters Shower Lndry Tray Exam Sink Sterilizer Soda Disp Wtr Sewer Mtrs Whirlpool Sump Pump 1 F Prep Sink RPZ Valve Coffee Maker Wtr Usage Mtrs _ Lavatory _ San Sump/Pump 1 Flr/Wst Sink _ Bidet Site Drain Misc. Toilet Water Softner Hand Sink Urinal Wait.St. Fixtures Kit Sink Standp Rec Lab Sink Beer Tap Ice Chest Disposal Gar Drain Plaster Sink Dip Well Comm Ice Maker Dishwasher Local Waste Sculry Sink Drink Ftn Int Grease Trap Floor Drain Bar Sink _ Sery Sink Wash Ftn Ext Grease Trap Hose Bibb Breakrm Sink Shamp Sink Catch Basin Eye Wash Statn Water Heater Use/Nature COMM/install new storm lateral to roof drain and sump pump discharge/add sanitary ejector pit to correct violation of of Work cross connection and fix capped sanitary sewer lateral by City Size Material Type # Conn.Type Sanitary Sewer Storm Sewer 6" Plastic Lateral 1 New Water Service Parcel Id# 0605290000 Valuation $1,900.00 Plan Approval $0.00 Permit Fees $64.00 E Permit Voided Issued By Date 12/05/2012 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party,if you perform the work described in this permit application within an easement,the City strongly urges the permit applicant to contact the easement holder(s)and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address 1639 THORNTON DR OSHKOSH WI 54904 -8294 Telephone Number 920-279-3949 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number,Type of Inspection(i.e. Footing,Service, Final,etc.),Access into Building if Secure(how do we gain entry),your Name and Phone Number. Unless specified otherwise,we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.