Loading...
HomeMy WebLinkAbout0153479 - Plumbing (additional fixtures) CITY OF OSHKOSH No 153479 OSHKOSH PLUMBING PERMIT -APPLICATION AND RECORD ON THE WATER _ Owner PAUL R GETCHEL Create Date 11/12/2012 Job Address 446 BOWEN ST _ —— Res- --— Contractor O'NEILL ENTERPRISES INC Category 412-g ry . Interior(New/Relocated Fixtures) Plan— -- -- Inspector Jerry Fabisch Deduct Meters Bathtub Clothes Wshr Classrm Sink Surgeons Sink Roof Drain Wed Deduct Me ers ___Lndry Tray Exam Sink Sterilizer Soda Disp Shower rY Y Wtr Usage Mtrs F Prep Sink RPZ Valve Coffee Maker g _ Whirlpool _— Sump Pump Site Drain Misc. __ 1 San Sump/Pump FlrlWst Sink Bidet Fixtures Lavatory --- --— Toilet 1 Water Softner Hand Sink Urinal Wait.St. Beer Tap Ice Chest 1 Lab Sink Kit Sink _ 1 Standp Rec Comm Ice Maker Disposal Gar Drain Plaster Sink Dip Well --_ Dishwasher 1 Local Waste Sculry Sink Drink Ftn Int Grease Trap Floor Drain Bar Sink Sery Sink Wash Ftn Ext Grease Trap Hose Bibb Breakrm Sink Shamp Sink — Catch Basin Eye Wash Statn Water Heater Use/Nature SFR/additional fixtures added to permit#148946 of Work Size Material Type # Conn.Type Sanitary Sewer Storm Sewer Water Service Parcel Id# 1100590000 Valuation $1,500.00 Plan Approval _ $0.00 Permit Fees —$21.00 ❑ Permit Voided Date 11/12/2012 Issued By In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement,the City strongly urges the permit applicant to contact the easement holder(s)and to secure any necessary approvals before starting such activity. Date Signature Agent/Owner Address 522 W 6TH AVE --- OSHKOSH_— WI 54902 -5916 Telephone Number 920-230-2007 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number,Type of Inspection (i.e. Footing, Service, Final, etc.),Access into Building if Secure(how do we gain entry),your Name and Phone Number. Unless specified otherwise,we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.