Loading...
HomeMy WebLinkAbout0153475 - Building (roof) CITY OF OSHKOSH No 153475 OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD ON THE WATER Job Address 1481 WHEATFIELD WAY Owner CHRIS M/CHERYL J ANDERSON Create Date 11/05/2012 Designer Contractor IMPRESSIVE ROOFING SIDING LLC Inspector Nicole Krahn Category 041 -Residential Roofing Plan Type • Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning R-1 _ Class of Const: Size Unfinished/Basement Sq.Ft. Rooms Height Ft. 3 Projection Finished/Living Sq.Ft. Bedrooms Stories Canopies Garage Sq. Ft. Baths Signs Foundation • Poured Concrete 0 Floating Slab 0 Pier 0 Other 0 Concrete Block 0 Post 0 Treated Wood Occupancy Permit Occupancy Fee $0.00 Flood Plain Height Permit _ p y --- -- Park Dedication #Dwelling Units 0 #Structures 0 Use/Nature SFR/LATE PERMIT/Tear off and replace existing roofing on house and garage. No structural changes. of Work HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valu•tion ',6,720.6,, Plan Approval $0.00 Permit Fee Paid $167.00 Park Dedication $0.00 By: `r1 j1 ,/ Date 11/09/2012 Final/O.P. 00/00/0000 Issued B 1,. ria1:s�/_ lamIlvsA"w" ❑ Permit Voided 1 Parcel Id# 1341010000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement,the City strongly urges the permit applicant to contact the easement holder(s)and to secure any necessary approvals before starting such activity. I have read understa the'afore mentioned information. I Signature J., _ 'L. Date Agent/Owner Address 1351 KIMBERLY DRIVE NEENAH WI 54956 - 0000 Telephone Number 920-727-4683 _To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number,Type of Inspection (i.e. Footing, Service, Final,etc.),Access into Building if Secure(how do we gain entry),your Name and Phone Number. Unless specified otherwise,we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.