HomeMy WebLinkAbout0153447 - Building (roof) CITY OF OSHKOSH No 153447
OSHKOSH BUILDING PERMIT -APPLICATION AND RECORD
ON THE WATER
Job Address 2790 MONTCLAIR PL Owner JOHN K/AMY L SPANBAUER Create Date 11/08/2012
Designer Contractor XACT RESTORATION AND REMODELING
Inspector Nicole Krahn
Category 041 -Residential Roofing Plan
Type • Building 0 Sign 0 Canopy 0 Fence 0 Raze
Zoning R-1 Class of Const:
Size
Unfinished/Basement Sq.Ft. Rooms Height Ft. ❑ Projection
Finished/Living Sq.Ft. Bedrooms Stories Canopies
Garage Sq. Ft. Baths Signs
Foundation • Poured Concrete 0 Floating Slab 0 Pier 0 Other
0 Concrete Block 0 Post 0 Treated Wood
Occupancy Permit Not Required Occupancy Fee $0.00 Flood Plain Height Permit Not Required
Park Dedication Not Required #Dwelling Units 0 #Structures 0
Use/Nature SFR/TEAR OFF AND REPLACE EXISTING ROOFING ON THE HOUSE AND GARAGE,REPLACE VINYL SIDING ON THE BACK
of Work SIDE ONLY-NO STRUCTURAL CHANGES **check#1056
HVAC Contractor Plumbing Contractor
Electric Contractor
Fees: Valuation $9,000.00 Plan Approval $0.00 Permit Fee Paid $81.00 Park Dedication $0.00
Issued By: Date 11/08/2012 Final/O.P. 00/00/0000
0 Permit VoidedI
J Parcel Id# 1318540000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party,if you perform the work
described in this permit application within an easement,the City strongly urges the permit applicant to contact the easement
holder(s)and ecure any •ecessary approvals-before starting such activity.
I have read an un erstan, - afore me ed information.
Signature Date E I
Agent/Owner
Address 1026 N MAIN ST OSHKOSH WI 54901 - 3838 Telephone Number (920)915-6798
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number,Type of
Inspection (i.e. Footing, Service, Final,etc.),Access into Building if Secure(how do we gain entry),your Name and Phone
Number. Unless specified otherwise,we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.