Loading...
HomeMy WebLinkAbout0153382 - Plumbing (sump pump) CITY OF OSHKOSH No 153382 OSHKOSH PLUMBING PERMIT -APPLICATION AND RECORD ON THE WATER Job Address 2015 N MAIN ST Owner THOMAS E/SELENA L FUHRMANN Create Date 11/06/2012 Category 410-Residential-Interior Plan Contractor SAMMONS PLUMBING g ry - — - - Inspector Jerry Fabisch Bathtub Clothes Wshr Classrm Sink Surgeons Sink Roof Drain Deduct Meters Shower Lndry Tray Exam Sink Sterilizer Soda Disp Wtr Sewer Mtrs Whirlpool Sump Pump 1 F Prep Sink RPZ Valve Coffee Maker Wtr Usage Mtrs Misc. Lavatory San Sump/Pump FIrIWst Sink Bidet Site Drain Fixtures Toilet Water Softner Hand Sink Urinal Wait.St. Kit Sink Standp Rec Lab Sink _ Beer Tap — Ice Chest Disposal _ Gar Drain Plaster Sink Dip Well _Comm Ice Maker Dishwasher Local Waste Scully Sink Drink Ftn Int Grease Trap Floor Drain Bar Sink Sery Sink Wash Ftn Ext Grease Trap Hose Bibb Breakrm Sink Shamp Sink Catch Basin Eye Wash Statn Water Heater Use/Nature SFR/INSTALL SUMP PUMP **debit acct of Work Size Material Type # Conn.Type Sanitary Sewer Storm Sewer Water Service Parcel Id# 1514950000 Valuation $300.00 Plan Approval $0.00 Permit Fees $25.00 E Permit Voided �'�1 Issued By / /. �y}� /3 5 Date 11106!2012 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party,if you perform the work described in this permit application within an easement,the City strongly urges the permit applicant to contact the easement holder(s)and to secure any necessary approvals before starting such activity. Date Signature Agent/Owner Address 522 W. MURDOCK AVE OSHKOSH WI 54901__-2298 Telephone Number (920)231-9880 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number,Type of Inspection (i.e. Footing,Service, Final,etc.),Access into Building if Secure(how do we gain entry),your Name and Phone Number. Unless specified otherwise,we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.