HomeMy WebLinkAbout0153367 - Building (siding) CITY OF OSHKOSH No 153367
OSHKOSH BUILDING PERMIT -APPLICATION AND RECORD
ON THE WATER
Job Address 935 W 12TH AVE Owner CHRISTOPHER G HOWARD/LISA STECKBAUER Create Date 11/06/2012
Designer Contractor ARC CONTRACTING OF WISCONSIN INC
Inspector Nicole Krahn
Category 042-Residential Siding Plan
Type • Building 0 Sign 0 Canopy 0 Fence 0 Raze
Zoning R-2 Class of Const: Size —
Unfinished/Basement Sq. Ft. Rooms Height Ft. ❑ Projection
Finished/Living Sq. Ft. Bedrooms Stories Canopies
Garage Sq. Ft. Baths _ Signs
Foundation • Poured Concrete 0 Floating Slab 0 Pier 0 Other
0 Concrete Block 0 Post 0 Treated Wood
Occupancy Permit Not Required Occupancy Fee $0.00 Flood Plain - Height Permit Not Required
Park Dedication Not Required #Dwelling Units 0 #Structures - -- 0
Use/Nature SFR/REPLACE ALUMINUM WITH VINYL SIDING ON THE HOUSE AND DETACHED GARAGE DUE TO HAIL DAMAGE-NO
of Work STRUCTURAL CHANGES **debit acct
HVAC Contractor Plumbing Contractor
Electric Contractor
Fees: Valuation $8,861.00 Plan Approval $0.00 Permit Fee Paid $81.00 Park Dedication $0.00
Issued By aril Date 11/06/2012 Final/O.P. 00/00/0000
❑ Permit Voided Parcel Id# 1306480000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement,the City strongly urges the permit applicant to contact the easement
holder(s)and to secure any necessary approvals before starting such activity.
I have read and understand the afore mentioned information.
Signature Date
Agent/Owner
Address 1496 NORTH ST NEENAH WI 54956 - 1812 Telephone Number (920)886-7663
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number,Type of
Inspection(i.e. Footing,Service, Final,etc.),Access into Building if Secure(how do we gain entry),your Name and Phone
Number. Unless specified otherwise,we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.