Loading...
HomeMy WebLinkAbout0153271 - Building (windows) (a) CITY OF OSHKOSH No 153271 OSHKOSH BUILDING PERMIT -APPLICATION AND RECORD ON THE WATER Job Address 2255 2257 WISCONSIN ST Owner MARK B/CYNTHIA NELEZEN Create Date 10/31/2012 Designer Contractor PAWLAK'S ROOFING&SIDING LLC Inspector John Zarate Category 040-Windows Plan Type • Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning R-2 Class of Const: Size Unfinished/Basement Sq.Ft. Rooms Height Ft. ❑ Projection Finished/Living Sq.Ft. Bedrooms Stories Canopies Garage Sq.Ft. Baths Signs Foundation • Poured Concrete 0 Floating Slab 0 Pier O Other O Concrete Block O Post 0 Treated Wood Occupancy Permit Not Required Occupancy Fee $0.00 Flood Plain Height Permit Not Required Park Dedication Not Required #Dwelling Units 0 #Structures 0 Use/Nature (DUPLEX/INSTALL(16)WINDOW REPLACEMENTS IN EXISTING OPENINGS-NO STRUCTURAL CHANGES of Work it I HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $2,729.22 Plan Approval $0.00 Permit Fee Paid $39.00 Park Dedication $0.00 Issued By: ,a-rn(i.) Date 10/31/2012 Final/O.P. 00/00/0000 ❑ Permit Voided Parcel Id# 1220900000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement,the City strongly urges the permit applicant to contact the easement holder(s)and to secure any necessary approvals before starting such activity. I have read and nderstand the a me . ned information. Signature / "�,���/ Date /.7 —l/Z___, may / Agent/Owner Address 8415 MAJOR LN SOBIESKI WI 54171 - 9769 Telephone Number 920-899-3922 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number,Type of Inspection (i.e. Footing,Service, Final, etc.),Access into Building if Secure(how do we gain entry),your Name and Phone Number. Unless specified otherwise,we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.