Loading...
HomeMy WebLinkAbout2012-Plumbing (water meter for outside) CITY OF OSHKOSH No 153258 OSHKOSH PLUMBING PERMIT -APPLICATION AND RECORD ON THE WATER Create Date 10/30/2012 Job Address 1210-1250 S KOELLER ST Owner 1200 SOUTH KOELLER STREET III LLC 10- ---- Category 442-Commercial-Interior(New/Relocated Fixt Plan Contractor O'NEILL ENTERPRISES INC —__ _- -- --—-- Inspector Jerry Fabisch —-- Bathtub Deduct Meters Wshr Classrm Sink Surgeons Sink Roof Drain ____Clothes Shower Lndry Tray Exam Sink Sterilizer Soda Disp Wtr Sewer Mtrs — — RPZ Valve 1 Whirlpool Sump Pump F Prep Sink Coffee Maker Wtr Usage Mtrs Misc. —_ Flr/Wst Sink Bidet Site Drain Lavatory _ San Sump/Pump —__ —_-- Fixtures Urinal Wait.St. Toilet Water Softner Hand Sink Ice Chest Standp Rec Lab Sink Beer Tap Kit Sink --- Comm Ice Maker Gar Drain Plaster Sink Dip Well — Disposal --- Drink Ftn Int Grease Trap Dishwasher Local Waste Sculry Sink — Sery Sink Wash Ftn Ext Grease Trap _. Floor Drain Bar Sink —— Sham Sink Catch Basin Eye Wash Statn Hose Bibb 1 Breakrm Sink p -- -- Water Heater Use/Nature COMM/1250 S.Koeller St.mechanical room/house water meter for outside hose bibb of Work 1 `— — — Size Material Type # Conn.Type Sanitary Sewer Storm Sewer Water Service Parcel Id# 1308480400 $0.00 Permit Fees $25.00 ❑ Permit Voided � `� Valuation __$1,500.00 Plan Approval _ �_—_ — --" — Date 10/30/2012 Issued By In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a nr t, if you pt the the work described in this permit application within an easement,the City strongly urges the permit applicant easement holder(s)and to secure any necessary approvals before starting such activity. Date Signature Agent/Owner Address 522 W 6TH AVE — OSHKOSH WI 54902 -5916 _ Telephone Number 920-230-2007 r,Type of To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit e and Phone Inspection (i.e. Footing,Service, Final,etc.),Access into Building if Secure (how do we gain entry),y our Name Number. Unless specified otherwise,we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.