HomeMy WebLinkAbout0153270 - Plumbing (storm lateral) CITY OF OSHKOSH No 153270
OSHKOSH PLUMBING PERMIT -APPLICATION AND RECORD
ON THE WATER
Job Address 1111 EVANS ST Owner GARY F/NANCY F KONRAD
- --- — - Create Date 10%31/2012
Contractor MERTEN PLUMBING&HEATING INC Category 401 -Residential-Exterior(laterals) Plan
Inspector Jerry Fabisch
Bathtub Clothes Wshr Classrm Sink Surgeons Sink Roof Drain
Deduct Meters
Shower Lndry Tray y Exam Sink -
-- _--_- Sterilizer Soda Disp Wtr Sewer Mtrs
Whirlpool Sump Pump
p p F Prep Sink RPZ Valve Coffee Maker Wtr Usage Mtrs
Lavatory
ry San Sump/Pump Flr/Wst Sink
Bidet Site Drain Misc.
Toilet Water Softner Hand Sink Urinal Wait.St Fixtures
.
Kit Sink _ Standp Rec Lab Sink Beer Tap Ice Chest
Disposal Gar Drain Plaster Sink Dip Well Comm Ice Maker _
Dishwasher - -- - --
_ Local Waste Sculry Sink Drink Ftn Int Grease Trap
Floor Drain Bar Sink Sery Sink Wash Ftn Ext Grease Trap
Hose Bibb Breakrm Sink
__ — Shamp Sink Catch Basin Eye Wash Statn
Water Heater
Use/Nature 'SFR/installing storm lateral to catch sump pump discharge and downspout***mini storm program***
of Work
Size Material Type # Conn.Type
Sanitary Sewer
Storm Sewer 4" Plastic Lateral 1 New
Water Service
Parcel Id#
1109660000
Valuation $1,500.00 Plan Approval _ __$0.00 Permit Fees $0.00 ❑ Permit Voided i
Issued By .1 —-
Date 10/31/2012
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement,the City strongly urges the permit applicant to contact the
easement holder(s)and to secure any necessary approvals before starting such activity.
Signature
Date
Agent/Owner
Address 1087 COZY LN — OSHKOSH WI 54901 - 1404 Telephone Number 231-6795
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number,Type of
Inspection (i.e. Footing,Service, Final, etc.),Access into Building if Secure(how do we gain entry),your Name and Phone
Number. Unless specified otherwise,we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.