Loading...
HomeMy WebLinkAbout0153270 - Plumbing (storm lateral) CITY OF OSHKOSH No 153270 OSHKOSH PLUMBING PERMIT -APPLICATION AND RECORD ON THE WATER Job Address 1111 EVANS ST Owner GARY F/NANCY F KONRAD - --- — - Create Date 10%31/2012 Contractor MERTEN PLUMBING&HEATING INC Category 401 -Residential-Exterior(laterals) Plan Inspector Jerry Fabisch Bathtub Clothes Wshr Classrm Sink Surgeons Sink Roof Drain Deduct Meters Shower Lndry Tray y Exam Sink - -- _--_- Sterilizer Soda Disp Wtr Sewer Mtrs Whirlpool Sump Pump p p F Prep Sink RPZ Valve Coffee Maker Wtr Usage Mtrs Lavatory ry San Sump/Pump Flr/Wst Sink Bidet Site Drain Misc. Toilet Water Softner Hand Sink Urinal Wait.St Fixtures . Kit Sink _ Standp Rec Lab Sink Beer Tap Ice Chest Disposal Gar Drain Plaster Sink Dip Well Comm Ice Maker _ Dishwasher - -- - -- _ Local Waste Sculry Sink Drink Ftn Int Grease Trap Floor Drain Bar Sink Sery Sink Wash Ftn Ext Grease Trap Hose Bibb Breakrm Sink __ — Shamp Sink Catch Basin Eye Wash Statn Water Heater Use/Nature 'SFR/installing storm lateral to catch sump pump discharge and downspout***mini storm program*** of Work Size Material Type # Conn.Type Sanitary Sewer Storm Sewer 4" Plastic Lateral 1 New Water Service Parcel Id# 1109660000 Valuation $1,500.00 Plan Approval _ __$0.00 Permit Fees $0.00 ❑ Permit Voided i Issued By .1 —- Date 10/31/2012 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement,the City strongly urges the permit applicant to contact the easement holder(s)and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address 1087 COZY LN — OSHKOSH WI 54901 - 1404 Telephone Number 231-6795 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number,Type of Inspection (i.e. Footing,Service, Final, etc.),Access into Building if Secure(how do we gain entry),your Name and Phone Number. Unless specified otherwise,we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.