HomeMy WebLinkAbout0153236 - Building (roof) CITY OF OSHKOSH No 153236
OSHKOSH BUILDING PERMIT -APPLICATION AND RECORD
ON THE WATER
Owner JAMES MOSLING Create Date 10/29/20.12_
Job Address 1575 MARICOPA DR - -
Designer Contractor ARC CONTRACTING OF WISCONSIN INC
Inspector Nicole Krahn
Plan
Category 041 -Residential Roofing --
Type • Building O Sign
❑ Canopy 0 Fence ❑ Raze -___,
Zoning R-1
Class of Const: Size
Unfinished/Basement
Sq.Ft. Rooms Height Ft. ❑ Projection 1
_ -
Finished/Living Sq.Ft. Bedrooms Stories Canopies-_Baths Signs
Garage -_ -
Sq.Ft. --_
- - _- - -
Foundation • Poured Concrete 0 Floating Slab 0 Pier 0 Other
0 Concrete Block 0 Post O Treated Wood
Occupancy Permit Not Required Occupancy Fee $0.00 Flood Plain Height Permit Not Required
0 #Structures 0
#Dwelling Units
Park Dedication Not Required
Use/Nature SFR/TEAR OFF AND REPLACE EXISITNG ROOFING,GUTTERS AND ALUMINUM WITH VINYL SIDING ON THE HOUSE AND
of Work ATTACHED GARAGE DUE TO HAIL DAMAGE-NO STRUCTURAL CHANGES **debit acct
II
HVAC Contractor Plumbing Contractor -_-
Electric Contractor
Fees: Valuation 34,554.00 Plan Approval $0.00 Permit Fee Paid $193.00 Park Dedication $0.00
Issued By: 8ink Date 10/29/2012 Final/O.P. 00/00/0000
❑ Permit VoideJ Parcel Id# 1319360000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement,the City strongly urges the permit applicant to contact the easement
holder(s)and to secure any necessary approvals before starting such activity.
I have read and understand the afore mentioned information.
Date
Signature .
Agent/Owner
Address 1496 NORTH ST — --
NEENAH WI 54956 - 1812 Telephone Number (920)886-7663 _
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number,Type of
Inspection (i.e. Footing,Service, Final,etc.),Access into Building if Secure(how do we gain entry),your Name and Phone
Number. Unless specified otherwise,we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.
Oct 26 12 04:41 p ARC Contracting 920-886-1073 p.4
City of-Oshkosh
Inspection Services Division
P0 Box 1130 \------)
Phone:((920)
36-;5,'° Of HK01
Phone:(920)236-5050
Fax: (920)236-5084 ON THE,VC■rEB
Roofing & Siding Permit Application
• Application(s)and feeCs) can be brought to City Hall, Room 205 or mailed to Inspection Services, PO Box 1128,
Oshkosh WI 54903-1128. Commencing work wilhout pennit(s) will result in fees being doubled or 5100.00 plus the
normal permit fee, wfi-ch ever is greater.
OR
1l you are a contractor narticieating in the Permitfee Account Svstena and have adeauate funds, check (tore
it ro,J want this eroces.sedthreuEh your account ,
JOB ADDRESS 515 _i hc co \- V—s-
OWNER s..):Yr) \ o J/ \-- R
CONTRACTOR ,- C ( L[ - ' C th
I am the: D Owner OR A Contractor
USE CATEGORY
ZSingle.Fancily C Duplex ❑Multi-Family ❑Rental C Commercial ❑Industrial
Work being done:
ROOFING
Tear off and replace existing roofing or house,'<garage
0 Replace wood decking
❑Add I layer of roofing to the existing .___—layer(s)on❑house,❑garage
This work is being done due to kt[fail Damage ❑Other
SIDING
WI-Isiah,:dir.g on ,'douse. [garage
❑Replacing vinyl with 1 I
El cpiacing steel or lluminu:n pith vinyl(circle steel or aluminum)
Q Replacing with
This work is teeing done due to XHail Damage 0 Other
When siding is done, one of the boxes below must be checked:
1) ❑Electric–Existing Electric Meter,receptacle,lighting and Electric Service entrance alterations/modifications arc being performed
by
INamc of'l_ic:,scd Eleatic CDi u ci3r)
AND :l Electric Installation Verification form is attached OR i Separate Elect Permit will be requested.
2j Electric–No: Applicable because,-. Blocks previously installed.)No outside lights. Othet__
❑Install now orkRcplacc gutters
❑[nstall new or❑ Replace dowr.spouls
Other related work being done: (please note)
Value of the job S l 5 (include Lair market price fer labor even it you:are not paytine for lobar) 03/02
Received Time Oct. 26. 2012 4: 41PM No. 1426