Loading...
HomeMy WebLinkAbout0152978 - Building (roof) CITY OF OSHKOSH No 152978 OSHKOSH BUILDING PERMIT -APPLICATION AND RECORD ON THE WATER Job Address 1923 MITCHELL ST Owner THOMAS E JACOBS —_Create Date 10/15/2012 Contractor ARC CONTRACTING OF WISCONSIN INC — — Designer — -- Inspector John Zarate -- — Plan -- Category 041 -Residential Roofing -- — ---- -. — ---- 1 Type • Buildin g Sign Canopy Fence 0 Raze --- --- Class of Const: Size Zoning R-1 ----------- Height Ft. Projection Sq.Ft. Rooms ---- Unfinished/Basement — — — Stories Canopies Finished/Living Sq. Ft. Bedrooms — Signs — _- Garage Sq.Ft. Baths Poured Concrete Floating Slab O Pier 0 Other Foundation 0 g 0 Concrete Block 0 Post 0 Treated Wood Occupancy Permit Occupancy Fee $0.00 Flood Plain Height Permit Park Dedication #Dwelling Units 0 #Structures 0 — Use/Nature RES/Tear off and replace roofing on house and garage due to hail damage. No structural alterations. **debit acct of Work Plumbing Contractor ---_— HVAC Contractor Electric Contractor Fees: Valuation _ $6,089.00 Plan Approval $0.00 Permit Fee Paid $67.00 Park Dedication $0.00 Date 10/16/2012 Final/O.P. 00/00/0000 Issued By: �nJ El Voided Parcel Id# 1216160000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement,the City strongly urges the permit applicant to contact the easement holder(s)and to secure any necessary approvals before starting such activity. I have read and understand the afore mentioned information. Date Signature Agent/Owner Address 1496 NORTH ST NEENAH WI 54956 - 1812 Telephone Number (920)886-7663 _ --- To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number,Type phof Inspection(i.e. Footing, Service, Final,etc.),Access into Building if Secure(how do we gain entry),y our Name Number. Unless specified otherwise,we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready. Oct 15 12 11:50a ARC Contracting 920-886-1073 P.5 - City of Oshkosh Inspection Services Division P 0 Box 1 130 411111r1D Oshkosh,WI 54903-i 130 O� O�I I Phone. (920)236-5050 I Fax:(920)236-504 ON THE WATFR Roofing & Siding Permit Application --r-d:c • A\plicaon(s) and fee(s)can be brought to City Flail,Room 205 or mailed to Inspection Services, PO Box 1128, Oshkosh WI 54903-1128. Commencing work without permit(s) will result in fees being doubled or$100.00 plus the normal permit fee, which ever is greater. OR Sn,ctem and have adequate J+rut's, check here II von ore a contractor participating in the Permit tee Accunnt if von want this processed through your account_ JOB ADDRESS_1 l Dz m heal\ S __ - OWNER 1 Z-C\ S CONTRACTOR_Iq ra4.7f 7',; I am the: ❑ Owner OR ,® Contractor USE CATEGORY ❑Rental ❑Commercial D Industrial -Single Family ❑Duplex ❑ Multi-Family Work being done: ROOFING ( Tear off and replace existing roofing onX1.house garage ❑Replace wood decking on❑ ;(s o '.louse, ❑Add I layer of roofing to the existing layer ❑garage - This work is'oein?done chic toKHail Damage ❑ Other SIDING C install siding on ❑house. ❑garage ❑ Replaeicg vinyl with vinyl ❑ Replacing.steel or aluminum with viny.(circle steel or aluminum) ❑Replacing with This work is being done due to O Hail Damage ❑Other When siding is done,one of the boxes below must be checked: I) 0 Electric-Existing Electric Meter,receptacle,lighting and Elect:ie.Set-vice entrance alterations/modifications are being performed by tNamc of Licensed 6lcctr c Contractsrt AND ' Electric Installation Verification form is attached OR I Separate Elect Permit will be reeuested. 2) ❑Electric-No:Applicable because: II.1 Blocks previously installed. Na outside fights. Other O Install new or O Replace gutters ❑Install new or 0 Replace downspouts Other related work being done: (please note)_ 01°) 03/02 Value of the job S VJ _(include fair markG price ft�r labor e�•cn if yc«arc not paying rcr labor) Received Time Oct. 15. 2012 11:48AM No. 1238