Loading...
HomeMy WebLinkAbout0153019 - Plumbing (install toilet) CITY OF OSHKOSH No 153019 la)OSHKOSH PLUMBING PERMIT -APPLICATION AND RECORD ON THE WATER Job Address 724 W GRUENWALD AVE Owner ROBERT P SONNLEITNER Create Date 10/17/2012 -— Category 413 Res-Interior(Replacement Fixtures) Plan _ Contractor SAMMONS PLUMBING g - - — -- Inspector Jerry Fabisch Clothes Wshr Classrm Sink Surgeons Sink Roof Drain Deduct Meters Bathtub - - Wtr Sewer Mtrs Exam Sink Sterilizer Soda Disp Shower Lndry Tray _—_ _ Coffee Maker Wtr Usage Mtrs Whirlpool Sump Pump F Prep Sink RPZ Valve Flr/Wst Sink Bidet Site Drain Misc. Lavatory _ San Sump/Pump - - ry - -— Fixtures Toilet 1 Water Softner Hand Sink Urinal — Wait.St. Kit Sink Standp Rec —_ Lab Sink Beer Tap Ice Chest Disposal Gar Drain Plaster Sink Dip Well Comm Ice Maker Dishwasher Local Waste Sculry Sink Drink Ftn — Int Grease Trap Floor Drain Bar Sink Sery Sink Wash Ftn Ext Grease Trap Hose Bibb Breakrm Sink Shamp Sink Catch Basin Eye Wash Statn Water Heater Use/Nature SFR/INSTALL TOILET **debit acct of Work Size Material Type # Conn.Type Sanitary Sewer Storm Sewer Water Service Parcel Id# 1220410000 Valuation $350 00 P n Approval $0.00 Permit Fees $25.00 ❑ Permit Voided � �{7 Date 10/17/2012__ Issued By c5n j(./l� In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party,if you perform the work described in this permit application within an easement,the City strongly urges the permit applicant to contact the easement holder(s)and to secure any necessary approvals before starting such activity. Date Signature Agent/Owner Address 522 W.MURDOCK AVE OSHKOSH WI 54901 -2298 Telephone Number (920)231-9880 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number,Type of Inspection (i.e. Footing,Service, Final,etc.),Access into Building if Secure(how do we gain entry),your Name and Phone Number. Unless specified otherwise,we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.