HomeMy WebLinkAbout0152919 - Building (roof) CITY OF OSHKOSH No 152919
OSHKOSH BUILDING PERMIT -APPLICATION AND RECORD
ON THE WATER
Job Address 2860 W 20TH AVE Owner SCOTT D/DEBBIE J GREUEL Create Date 10/11/2012
Designer Contractor ARC CONTRACTING OF WISCONSIN INC
Inspector Nicole Krahn
Category 041 -Residential Roofing Plan
Type • Building 0 Sign - 0 Canopy 0 Fence ❑ Raze
Zoning R-1 Class of Const: Size
Unfinished/Basement Sq.Ft. Rooms Height Ft. ❑ Projection
Finished/Living Sq.Ft. Bedrooms Stories Canopies
Garage Sq.Ft. Baths Signs
Foundation • Poured Concrete 0 Floating Slab 0 Pier 0 Other
0 Concrete Block 0 Post 0 Treated Wood -
Occupancy Permit Not Required- Occupancy Fee $0.00 Flood Plain Height Permit Not Required
Park Dedication Not Required #Dwelling Units 0 #Structures - 0
Use/Nature SFR/TEAR OFF AND REPLACE EXISTING ROOFING, GUTTERS AND DOWNSPOUTS ON HOUSE AND GARAGE-NO
of Work STRUCTURAL CHANGES **debit acct
HVAC Contractor Plumbing Contractor
Electric Contractor
Fees: Valuation $10,163.17 Plan Approval $0.00 Permit Fee Paid $94.00 Park Dedication $0.00
arn
- --
Issued By: �� Date 10/12/2012 Final/O.P. 00/00/0000
❑ Permit Voided Parcel Id# 1331570000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement,the City strongly urges the permit applicant to contact the easement
holder(s)and to secure any necessary approvals before starting such activity.
I have read and understand the afore mentioned information.
Signature Date
Agent/Owner
Address 1496 NORTH ST NEENAH WI 54956 - 1812 Telephone Number (920)886-7663
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number,Type of
Inspection (i.e. Footing,Service, Final,etc.),Access into Building if Secure(how do we gain entry),your Name and Phone
Number. Unless specified otherwise,we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.
t 10 12 04:37p
) Ldc3
ARC Contracting 920-886-1073 p.1
oily urc.Jshi 0N:,
4Fliii4lnspection Services Division J
I' GBox I1 .0 /
Oshkosh,WI .54903-1 1 30 `�J�////
Phone: (92C) 236-50150 +0J: 1K0,1l---I
Fax:(923) 236-5084-
, r '....,A,-FP
Roofing & Siding Permit Application
• Application(s) and fee(s) can be brought to City Hall, Room 205 or mailed to lnspection Services, PO Box 1128,
Oshkosh WI. 54903-1128 Commencing work without permits) will result in fees being doublet o- SIOO.00 p1Js the
normal pert-nil:fee, which ever ii; greater.
OR
if you ale u :.-oniractor par(ic:palin� in the l-ermit 1:2e Account Sig-ileIn and sari' cdc4uare iiocis. c'ie(:/- l—afre
if VOLE 1t'a171 this ,oro) esS C.Li ihrour7h lour aCCQun: X
•c )vrii.uToaILQC�tJ - -----------
lam (lie: ❑ Owner OR IN Contractor
USE CATEGORY
KSingl_ I'anrily L I)upluN ❑ Mu/Li-Family ❑ Rental ❑Conuncrci..l ❑Indus,riul -
Work being done:
ROOFING
OcTear ofnund repiace csis,ing rooticg on JN'house garage
❑ 11:place wood decein2,
O Add I layer o:.roofing w the c'asting layer(s)On 0 1!ou:,.e,❑ garage
this work is being dots due ro❑ Hai[Damage ❑ Ocher-
SWING
. Inslsa siding on 0 house. ❑ garage
CJ Rip:acing vinyl u'idt vil,rl
I7 Replacing steel or aluminum ,vil1,oinyl(circle stce,or aluminum)
11 ReplacirT, ,..•,al
[hit work is tDe ne cunt_due to 0 Hai' Damage ❑Other
When siding is done, one of the boxes below nzu.ct be checked:
I I O Electric-LNistine Electric Meter,receptacle. lighting and E.ectric Service-tntrance znter3tiursimuc1111c4uan arc lxlrra periiirntcu
ll! __
(N aric or1_icunsad LIccinc('onuanon
At,ID 'Ietric i rs!aliation Veril-.ca:ion tcmi is anac'acd 01: Seauralc El.:C;:'crn'r-Will he reanc5!ed.
!) LJ t-;Lciriu.—No■ '\phlicablc hecans,: 1 14:ocks p:eeiou>I. Installed. No ouo. de :.:21 :r, Cllhcr
Li li-i.ll u4.2..6,ur!dt Ite,•-luec Outten
f1 In'.l:ril nc of >_c.. 1:_plaCc d'.itc:r.:p,rnt.
Oilier related work being done: (p.ease note)
':II the,lo \\ `�_`
" �
Value
1 ..-�� -- - i nlclt cJc fait Haar:--•-Ct ImcC Iii lobo .1‘...!I it '.'!u arc :,I lsu,i;c 1i i.il")I j r.±;;n?
Received Time Oct. 10. 2012 4: 35PM No. 1205