Loading...
HomeMy WebLinkAbout0152749 - Building (roof) CITY OF OSHKOSH No 152749 OSHKOSH BUILDING PERMIT -APPLICATION AND RECORD ON THE WATER Job Address 1326 LAMAR AVE — --- — Owner RUTH M REEHL Designer - -- Create Date 10/04/2012_ Contractor PEPPLER REMODELING Inspector John Zarate _ Category 041 -Residential Roofing YPe •� Building — Sign --- Plan -- _ ❑ Canopy ❑ Fence ❑ Raze Zoning R-2 Class of Const: Unfinished/Basement Size Sq.Ft. Rooms Height Ft. Projection Finished/Living ---- ❑ Projecio � Sq.Ft. Bedrooms Stories Garage — Canopies Sq.Ft. Baths Signs Foundation • Poured Concrete ❑ Floating Slab ❑ Pier ❑ Other ❑ Concrete Block ❑ Post ❑ Treated Wood Occupancy Permit Occupancy Fee $0.00 Flood Plain Height Permit _ Park Dedication #Dwelling Units 0 #Structures 0 Use/Nature SFR1 Tear off and reroof on house --------- ------- of Work — — HVAC Contractor — — _ -- — Plumbing Contractor Electric Contractor Fees: Valuation $3,000.00 Plan A Park $0.00 $0 _ Approval $0.00 Permit Fee Paid $39.00 Pk D Issued By: _ Date 10/04/2012 Final/O.P. 00/00/0000 ❑ Permit Voided Parcel Id# 1202190000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkos• has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this per ' -■plicati within an easement,the City strongly urges the permit applicant to contact the easement holder(s)and to se. - :ny ne s a approvals before starting such activity. I have read and ••-rst d t o mentioned information. Signature f�� Date e Agent/Owner Address W2380 COUNTY Q BERLIN — WI 54923 - 0000 Telephone Number 920-361-7731 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final,etc.),Access into Building if Secure(how do we gain entry),your Name and Phone Number. Unless specified otherwise,we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.