Loading...
HomeMy WebLinkAbout0152750 - Building (siding) CITY OF OSHKOSH No 152750 OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD ON THE WATER Job Address 1230 W 10TH AVE Owner JOHN UELEANA L FAILLA Create Date 09/28/2012 Designer Contractor PEPPLER REMODELING _Inspector Tom Spierowski Category 042-Residential Siding Plan Type 0_Building O Sign O Canopy O Fence Raze j Zoning R-1 _ Class of Const: Size — Height Ft. El Projection Unfinished/Basement Sq.Ft. Rooms 9 Finished/Living Sq.Ft. Bedrooms Stories Canopies Garage _ Sq.Ft. Baths Signs Foundation • Poured Concrete O Floating Slab 0 Pier O Other O Concrete Block O Post O Treated Wood Occupancy Permit Occupancy Fee $0.00 Flood Plain Height Permit Park Dedication #Dwelling Units 0 #Structures 0 Use/Nature SFR/Re-siding*the house and garage. No structural work. of Work HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $8,000.00 Plan Approval $0.00 Permit Fee Paid $74.00 Park Dedication $0.00 Issued By: 4,, Date 10/04/2012 FinallO.P. 00/00/0000 ❑ Permit Voided Parcel Id# 1307760000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Osh •- has no -uthority to enforce easement restrictions of which it is not a party, if you perform the work described in this per -•plicatio- it 'n an easement,the City strongly urges the permit applicant to contact the easement holder(s)and to see - any nec pprovals before starting such activity. I have read and u-•er th= or entioned information. rO. /Z Signature if Agent/Owner / Date Address W2380 COUNTY Q BERLIN WI 54923 - 0000 Telephone Number 920-361-7731 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number,Type of Inspection (i.e. Footing, Service, Final,etc.),Access into Building if Secure(how do we gain entry),your Name and Phone Number. Unless specified otherwise,we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.