Loading...
HomeMy WebLinkAbout11. 12-498 OCTOBER 9, 2012 12-498 RESOLUTION (CARRIED __7-0____LOST ________LAID OVER ________WITHDRAWN ________) PURPOSE: APPROVAL OF CHANGE ORDER NO. 1 FOR PUBLIC WORKS CONTRACT 12-05 WITH CARL BOWERS & SONS CONSTRUCTION CO. FOR VARIOUS CONCRETE PAVING & UTILITY PROJECTS – SOUTH CENTRAL AREA (+$480,237.00) INITIATED BY: DEPARTMENT OF PUBLIC WORKS BE IT RESOLVED by the Common Council of the City of Oshkosh that the following Change Order, a copy of which is attached, is hereby approved: CARL BOWERS & SONS CONSTRUCTION CO. N1844 Maloney Rd. Kaukauna, WI 54130 Net Increase to contract: $480,237.00 PURPOSE: See attached Change Order. BE IT FURTHER RESOLVED that money for this purpose is hereby appropriated from: Acct. No. 502-1040-7218-00000 TIF #25 Fund – Road Improvements 524-1040-7218-00000 TIF #15 Fund – Road Improvements 530-1040-7218-00000 TIF #17 Fund – Road Improvements 11PD OJHKOJH ON THE WATER MEMORANDUM TO: Honorable Mayor and Members of the Common Council FROM: Steven M. Gohde, Assistant Director of Public Works51^j DATE: October 4, 2012 RE: Change Order No. 1 for Public Works Contract No. 12-05 Various Concrete Paving & Utility Projects—South-Central Area Carl Bowers &Sons Construction (+$480,237.00) BACKGROUND Change Order No. 1 for Contract 12-05 is scheduled for consideration by the Common Council at the October 9, 2012 meeting. The contract was originally awarded to Carl Bowers & Sons Construction in May of 2012. This change order is for additional work near the City Center Hotel. The Hotel Group approached the City about repairing the concrete pavement in the area. Upon review of the utilities adjacent to the City Center Hotel, it was determined that they are in poor condition and should be repaired and/or replaced prior to repairing the pavement. The storm sewer is significantly undersized and damaged. The water main is approximately 90 years old with multiple failures in the area and is also located near the front entrance of the hotel. The sanitary sewer is approximately 75 years old with significant infiltration of clear water. The Engineering Division prepared plans to upgrade/replace the utilities in Ceape Avenue adjacent to the hotel and repair the concrete pavement on Ceape Avenue and Commerce Street. Due to the timing of the request and the time required to prepare plans and specifications, a formal bid could not be completed to allow for completion of the work prior to the Hotel's scheduled opening in the spring of 2013. Plans and specifications were given to four contractors with large enough open contracts to allow the work to be added into their contract by a change order. The contractors submitted sealed proposals to perform the work. ANALYSIS Engineering reviewed three proposals from the contractors given bid packages for this project. The low proposal was received from Carl Bowers & Sons Construction in the amount of$480,237.00. The work will be added to Contract 12-05, Various Concrete Paving & Utility Projects—South-Central Area by this change order. FISCAL IMPACT Funding for this work is proposed to come from three TID districts. The TID districts are #15 — Park Plaza/ Commerce Street Redevelopment, #17 — City Center Redevelopment, and #25 — City Center Hotel Redevelopment. Below is a breakdown of the amount to be charged to each TID: Funding Source Change Order Amount TID#15 Park Plaza/ Commerce St Redevelopment $160,079.00 TID#17 City Center Redevelopment $160,079.00 TID#25 City Center Hotel Redevelopment $160,079.00 Total $480,237.00 1:1Engineering112-05 Conc Paving&Util-Central\Project_Information\Correspondence\MemoY12-05 Memo for CO#1_10-4-12.docx Page 1 of 2 Adequate funds exist in TID #15 and #17 to fund their share of the proposed improvements. Public improvements of this nature are permitted uses within each of the districts. TID#25 identified up to $1.5 million in public improvements. Approximately $625,000 of this amount has already been committed. Approval of this change order will increase the committed amount in TID #25 to approximately $785,000, leaving approximately $715,000 available for future improvements. RECOMMENDATIONS I recommend approval of Change Order No. 1 to Contact No. 12-05 in the amount of +$480,237.00 to Carl Bowers & Sons Construction. Approved: Mark A. Rohloff City Manager SMG/tlt I:1Engineering112-05 Conc Paving&Util-CentrallProject_Information\CorrespondencelMemo112-05 Memo for CO#1_10-4-12.docx Page 2 of 2 TO: Carl Bowers & Sons Construction Co., Inc. CHANGE ORDER# 1 N1844 Maloney Road (WORK FOR CONTRACT 12-28) Kaukauna, WI 54130 DATED: October 2, 2012 Your present contract with the City of Oshkosh, Contract No. 12-05, awarded May 8, 2012, is hereby amended and changed as follows: NET INCREASE TO: SECTION I - PAVING $129,217.00 NET INCREASE TO: SECTION II - STORM SEWER $219,385.00 NET INCREASE TO: SECTION Ill - SANITARY SEWER $30,405.00 NET INCREASE TO: SECTION IV-WATER MAIN $101,230,00 NET INCREASE TO CONTRACT $480,237.00 Section I Section!I Section III Section N (Paving) (Storm) (Sanitary) (water) Totals Old Total $1,171,044.45 $876,235.50 $743,788.00 $784,490.14 $3,575,558.09 C.O.#1 $123,217.00 $219,385.00 $30,405.00 $101,230.00 $480,237.00 Contract Total $1,300,261.45 $1,095,620.50 $774,193.00 $885,720.14 $4,055,795.09 CITY OF OSHKOSH BY: Recommended: City Manager Director of Public Works City Clerk Approved and accepted: I6 ()Contractor I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under the within Change Order, Comptroller ~� Approved as to form: City Attorney CONTRACT:12-05 CHANGE ORDER#1 (WORK FOR CONTRACT 12-28) SECTION I-PAVING ADDITIONAL WORK REQUIRED: C.O.#'I -SECTION 1(WORK FOR CONTRACT 12.28) INCREASE IN DECREASE IN 1311) INSTALLED NET NET UNIT CONTRACT CON TRACT NUMDER DESCRIPT1vN i1NIT QUANTITY QUANTITIES INCREASE DECREASE PRICE PRICE PRICE 100 Pavement removal, Square corn late as specified Yards 0.00 �2200.00 2,200.00 $5.00 $11,000.00 101 Sidewalk and driveway -._.._._ removal,complete as Square specified Feet 0.00 670.00 670.00 $1.00 $670.00 102 Excavation,complete as Cubic speecifiied Yards 0.00 435.00 435.00 $11.00 $4,785.00 103 8'concrete pavement, HES,including integral curb and 6"base material, and grading,complete as Square ‘specified Yards 0.00 1550.00 1,550.00 $41.00 $63,550.00 104 12"wide radius curb head, complete as specified Linear Feet 0.00 80.00 80.00 $12.15 , $972.00 105 Standard 24"curb and gutter,8"(tie-in).complete Linear as specified Feet 0.00 45.00 45.00 $23.00 I $1,035.00 106 6''concrete sidewalk and driveway,complete as Square specified Feet 0.00 845.00 845.00 $4.50 $3,802.60 107 4•asphaltic concrete pavement with base, Square complete as specified Yards 0.00 790.00 790.00 $28.10 , $22,199.00 108 Furnish and install crushed stone base course, complete as specified Tons 0.00 150.00 150.00 $10.00 $1,500.00 109 Sawing,complete as Linear specified I Feet 0.00 1050.00 t050.00 $3.00 $3,150.00 110 Furnish and install pavement ties(epoxy- coated),complete as specified Each ': 0.00 310.00 310.00 $6.15 $1,906.50 111 Adjust manholes and l inlets,complete as ispecified Each 0.00 12.00 12.00 $500.00 $6,000.00 _ 112 ;Furnish and install metal (detectable warning fields, Square complete as specified Feet-i 0.00 24400 _ 24.00 $23.00 $552.00 113 Terrace work on Ceape I Avenue,complete as Lump L s^,ecified _ Sum $0.00 1 1.00 1.00 $1,000.00 $1,000.00 ....___.._. 114 Terrace work on l Commerce Street, Lump i 0.00 1 .00 1 00 0 E $1 0 cca�,lete as srifd Sum �1 000.0 u:, 00.00 s + 115 Rout and seal existing 1 ' I crack,complete as Linear , 0.00 12.00 12.00 l I.....$3.00 - $36.00 i_ ,_ specified I Foot , Page 1 of 6 CONTRACT:12-05 CHANGE ORDER#1 (WORK FOR CONTRACT 12.28) 16 'Furnish and install cold _- - - weather covering, 1-layer visquine,complete as Square specified Yards 0.00 484.00 484.00 $1.00 $484.00 117 Furnish Furnish and install cold weather covering,2-layer visquine,complete as Square . specified t Yards 0.00 _ 484.00 484.00 $2.00 $968.00 118 Furnish and install cold l weather covering,2-layer 1 visquine and 6'hay, ! Square complete as specified i Yards 0.00 484.00 484.00 $3.00 1 $1,452.00 119 Retaining wall,complete as Linear specified Feet 0.00 38.00 38.00 $60.00 $2,280.00 120 Standard 18"Type"6" _. curb,complete as specified Linear Feet 0.00 35.00 35.00 I $25.00 $875.00 ADDITIONAL WORK: C.O.#1-(ITEMS 100-129}-SUB-TOTAL $129,217.00 $0.00 NET INCREASE TO: SECTION I $129,217.00 SECTION II-STORM SEWER ADDITIONAL WORK REQUIRED: C.O.#1 - SECTION II(WORK FOR CONTRACT 12-28) ITEM BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBED DESCRIPTION {'"°1T QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT CONTRACT PRICE PRICE 2014 Storm sewer utility line - t opening(ULO),complete as specified Each 0.00 5.00 5.00 $600.00 1 $3,000.00 2036 Furnish and install 12" storm sewer,complete as Linear specified Feet 0.00 120.00 120.00 $90.00 $10,800.00 2048 Furnish and install 18" storm sewer,complete as Linear specified Feet 0.00 30.00 30.00 $103.00 $3,090.00 2080 Furnish and install 36" RCP Class III Storm Sewer,complete as Linear ispecified Feet 0.00 12.00 12.00 $165.03 $1,980.00 2102 Furnish and install 60" ---.__ ___..._......_.................. storm sewer,complete as Linear specified Feet 0.00 114.00 114.00 $250.00 $28,500.00 2103 Furnish and install structuraily-supported 60" } I storm sewer,complete as Linear I specified Feet 0.00 36.00 36.00 $700 00 25 200.00 r � 21 72 Furnish and instali 3'x 6' box culvert storm sewer, Linear complete as specified Feet 0,00 i 125.00 125.00 1 ! $415.00 $51,875,00 rn- 2220 Furnish and install 3'x6' I box culvert storm sewer WI { manhole or inlet riser, linear .complete ass specified j Feat 0.00 8.00 8.00 $435.00 $3,480.00 2287 Furnish and install bentcnite slurry dam, complete as specified Each 0.00 I 1.00 1.00 52,000.00 $2,000.00 10 Page 2 of 6 CONTRACT:12.05 CHANGE ORDER#1(WORK FOR CONTRACT 12.28) 3 2555 Furnish and install - i standard storm inlet i manhole(4'diameter), Vertical , j complete as specified Feet 0.00 1 3.00 3.00 $300.00 $900.00 2580 Furnish and install storm junction chamber, complete as specified Each 0.00 3.00 3.00 $17,000.00 $51,000.00 2584 Furnish and install -- __.__., standard storm manhole riser(4'diameter), Vertical complete as specified Feet 0.00 2.00 2.00 $300.00 $600.00 2596 Furnish and install storm in line tee base manhole, complete as specified Each 0.00 1.00 1.00 $15,000.00 $15,000.00 2614 Furnish and install Typo 3 inlet with 18"sump), complete as specified Each 0.00 3.00 3.00 $1,550.00 $4,650.00 2616 Furnish and install Type 3 inlet,complete as specified Each 0.00 1.00 1.00 $1,500.00 $1,500.00 2800 Connect to existing storm �� sewer,complete as specified Each 0.00 1.00 1.00 , $300.00 $300.00 2806 Connect to existing manhole,complete as specified Each 0.00 1.00 1.00 $500.00 $500.00 f 2824 Remove 30"and smaller storm sewer,complete as Linear specified Feet 0.00 125.00 125.00 $20.00 $2,500.00 2826 Remove 33"-60'storm -._ sewer,complete as Linear specified Feet 0.00 190,00 190.00 $22.00 $4,180.00 2832 Remove storm manholes and inlets,complete as specified Each 0.00 7.00 7.00 $300.00 $2,100.00 2858 Furnish,install,maintain, and remove Type C modified inlet protection, complete as specified l Each 0.00 22.00 22.00 $85.00 $1,870.00 2860 Sediment removal-Type 0 modified inlet protection, complete as specified Each 0.00 22.00 22.00 $5.00 $110.00 2866 Furnish,install,maintain, - and remove stone bag, complete as specified Each 0.00 50.00 50.00 $10.00 $500.00 2964 Over excavation,complete Cubic -._. as specified Yards 0.00 _ 150.00 150.00 525.00 $3;750.00 ADDITIONAL WORK:C.O.#1 -(ITEMS 2014-2964)-SUE-TOTAL $219,385.00 $$0,00 NET INCREASE TO: SECTION II 5219,385,00 SECTION III-SANITARY SEWER ADDITIONAL WORK REQUIRED: C.O.4 1 -SECTION III(WORK FOR CONTRACT 12-28) iTpq BID INSTALLED NE7 ET UNIT INCREASE IN IDECREAS% IN DESCRIPTION C 1'!T CONTRACT 1 CONTRACT NU.MPt R : QUA-'VT/TY QUANTITIES INCREASE DECREASE? PACE' PRICE I PRICE Page 3of6 CONTRACT:12-05 CHANGE ORDER#1(WORK FOR CONTRACT 12-28) 3000 Furnish and instal'8" - sanitary sewer relay, Linear complete as specified Feet 0.00 5.00 5.00 y$130.00 650.00 3002 Furnish and install 10" -_.._.._._.. sanitary sewer relay, Linear complete as specified Feet 0.00 90.00 90.00 $100.00 9000.80 3015 tFurnish and install 33' sanitary sewer relay, Linear complete as specified Feet 0.00 10.00 10.00 $150.00 1500.00 ' per..... I 3100 Furnish and install standard sanitary manhole (4'diameter),complete as Vertical . specified , Feet 0.00 7.00 7.00 $300.00 2100.00 3102 Furnish and install standard sanitary manhole (5 diameter),complete as Vertical specified Feet 0.00 7.00 i 7.00 $500.00 3500.00 3114 Furnish and install external manhole chimney seal, complete as specified Each 0.00 2.00 . 2.00 1 $350.00 700.00 3116 Furnish and install external manhole chimney seal extension,complete as specified Each 0.00 2.00 2.00 $300.00 600.00 3222 Furnish and install 6" "Insert-A-Tee"or"Kor-N- Seal',complete as specified Each 0.00 1.00 1.00 $200.00 200.00 3234 Furnish and install 4"16" sanitary lateral relay, linear complete as specified Feet 0.00 5.00 5.00 $120.00 600.00 3236 f Furnish and install sanitary If lateral marker balls, complete as specified Each 0.00 2.00 2.00 $20.00 40.00 3300 Furnish and Install connections to existing 8" mains,complete as specified Each 0.00 1.00 1.00 $600.00 600.00 3302 Furnish and install connections to existing 10" mains,complete as specified Each 0.00 1.00 1.00 $780.00 700.00 3315 Furnish and install connections to existing 33" mains,complete as specified Each 0.00 3.00 3.00 $1,000.00 3000.00 3408 Furnish and install 16" open cut casing pipes, Linear compete as specified Feet 0.00 25.03 25.00 $120.00 3.000.00 _ 3700 Televise sanitary sewer, L,rnc af- icomplete as specified Feet 0.00 105.80 105.00 $3.00 i 315.00 . _ 3800 'Abandon sanitary nary _ manholes,complete as ii spccifr d Each 0.00 1.00 _._ 1.00 ._ $400.00 I 400.00 St?02 i I Abandon 8 sanitary sewer, Linear I r complete as specified Feet 0.00 25.00 25.00 $8.00 I 1 ..... 200.00 Page 4 of 6 CONTRACT: 12-05 CHANGE ORDER€t 1(WORK FOR CONTRACT 12-28) - - 3817 Abandon 33"sanitary sewer,complete as Linear specified Feet 0.00 90.00 90.00 $20.00 1800.00 3850 Remove sanitary sewer, Linear complete as specified Feet 0.00 75.00 75.00 $20.00 1500.00.._ _._. ADDITIONAL WORK: C.0.#1-(ITEMS 3000-3850)•SUB-TOTAL $30,406.00 $0.00 NET INCREASE TO: SECTION III $30,405.00 SECTION IV-WATER MAIN ADDITIONAL WORK REQUIRED: C.O.#1 -SECTION IV(WORK FOR CONTRACT 12-28) ITEM I 1 BID INSTALLED NET NET UNIT INCITE ASFlrJ DECREASE G'JI DESCRIPTION I UNIT CONTRACT CONTRACT NUMBER, QUANTITY QUANTITIES INCREASE DECREASE: PRICE PRICE PRlCc. 4000 Furnish and install 4" ductile iron water main relay with poly wrap, Linear complete as specified Feet 10.00 10.00 $110.00 $1,100.00 4002 Furnish and Install 6' ductile iron water mann relay with poly wrap, Linear complete as specified Feet 10.00 10.00 $120.00 $1,200.00 4004 Furnish and install 8" ductile iron water main relay with poly wrap, Linear complete as specified Feet 45.00 45.00 $120.00 $5,400.00 4008 Furnish and install 12" ductile iron water main relay with poly wrap, Linear complete as specified Feel , 325.00 325.00 $125.00 $40:625.00 4036 Furnish and install 1"water I service relay,complete as Linear _......_...__..specified Feet 100.00 100.00 { $85.00 $6,500.00 4048 Furnish and install 1" i ��..- _V corporation and stop box, I complete as specified Each - 1.00 1.00 $300.00 $300.00 4054 Furnish and install water service clay dams, complete as specified Each 1.00 1.00 $85.00 $85.00 4056 Furnish and install connections to existing 4" water main,complete as specified Each 1.00 1.00 $1,300.00 $1,300.00 4058 Furnish and install ---__.- - )----- connections to existing 6' ; i ;water main,complete as j !specified Each I 1.00 _,1.00_............._.._.._ $1,400.00_. _....... 1,400.00 _ 4060 Furnish and install I connections to existing 8' 1 water main,complete as specified Each 2.00 2.00 f $1,500.00 $3,000.00 4064 Furnish and install I connections to existing 12' water main,complete as � specified Each I 2.00 j 2.00 $2,000.00 I $4,000.00 Page 5 of 6 CONTRACT:12-05 CHANGE ORDER#1 (WORK FOR CONTRACT 12-28) - - 4127 Furnish and install 12'x 4" tee,complete as specified Each 1.00 1.00 $600.00 $600.00 4129 Furnish and install 12"x 8" tee,complete as specified Each 2.00 2.00 $700.00 $1,400.00 4131 Furnish and install 12"x 12"tee,complete as specified Each 1.00 1.00 $850.00 $850.00 4221 Furnish and install 12" 11%*bend,complete as ' specified Each 4.00 4.00 $500.00 $2,000.00 4235 Furnish and install 4"45" bend,complete as specified Each 2.00 2.00 $150.00 $300.00 - 4236 Furnish and install 6"45" 7' herd,complete as specified Each 4.00 4.00 $200.00 $800.00 4237 Furnish and install 8"45" bend,complete as specified Each 4.00 4.00 $300.00 $1,200.00 4239 Furnish and install 12'45" bend,complete as specified Each 10.00 10.00 $570.00 $5,700.00 4269 Furnish and install 12"x 6" reducer,complete as specified Each 1.00 1.00 $370.00 $370.00 4400 Furnish and install 4"gate valve,complete as i specified Each 1.00 1.00 $1,000.00 $1,000.00 '"--4402 Furnish and install 8"gate valve,complete as specified Each 2.00 2.00 $1,550.00 $3,100.00 4404 Furnish and install 12"gate valve,complete as specified Each 4.00 4.00 $2,600.00 $10,400.00 4712 Furnish and install 2"steel casing pipe,complete as Linear specified Feet 20.00 20.00 $50.00 $1,000.00 4728 Furnish and install 20" , steel casing pipe,complete Linear as specified Feet 1 20.00 20.00 $150.00 $3,000.00 4900. Abandon water main on Ceape Avenue,complete Lump as specified Sum 1.00 1.00 $800.00 $800.00 4920 Remove water main, Linear !complete as specified Feet 90,00 , 90.00 $20.00 $1,800.00 ADDITIONAL WORK: C.O.#1 (ITEMS 4000-4920).SUB.TOTAL $101,230.00 $0.00 NET INCREASE TO: SECTION IV $101,230.00 NET INCREASE TO SECTIONS 1,11,111,IV $480,237,00 NET DECREASE TO SECTIONS I,II,Ill,IV $0,00 NET INCREASE TO CONTRACT: -T480,237.013-- Page 6 of 6