HomeMy WebLinkAbout04. 12-491 OCTOBER 9, 2012 12-491 RESOLUTION (CARRIED __7-0____LOST ________LAID OVER ________WITHDRAWN ________) PURPOSE: APPROVE AMENDMENT TO PROFESSIONAL SERVICE AGREEMENT WITH AECOM FOR ENVIRONMENTAL ENGINEERING SERVICES FOR THE PROPOSED RIVERWALK IMPROVEMENTS AT BOAT WORKS PROPERTY (+$121,000) INITIATED BY: COMMUNITY DEVELOPMENT WHEREAS, AECOM is a consulting firm that provides professional services with expertise in a number of areas including environmental engineering; and WHEREAS, the City and AECOM previously entered into a professional services agreement in which AECOM would provide the City with engineering and environmental services associated with obtaining a Chapter 30 permit from the Wisconsin Department of Natural Resources (DNR) for riverwalk improvements at the former Boat Works property on Michigan Street; and WHEREAS, due to the proposed scope of the project, the DNR is requesting input and review from the Army Corp. of Engineers and US Coast Guard, which entities have requested detailed geotechnical engineering reports, more detailed design plans, and additional permit submittals, and it is efficient and beneficial to achieve this requirement by amending the existing agreement with AECOM. NOW, THEREFORE, BE IT RESOLVED by the Common Council of the City of Oshkosh that the proper City officials are authorized and directed pursuant to Section 12- 16 of the Municipal Code to enter into an amended agreement with AECOM, 558 North Main Street, Oshkosh, WI 54901 in substantially the same form as the attached amendment and said City officials are authorized and directed to take those steps necessary to implement the terms and conditions of the amended Agreement. BE IT FURTHER RESOLVED that money for this purpose is hereby appropriated from Acct. No. 534-1040-6401-07280 TIF #20 South Shore Redevelopment City of Oshkosh Community Development Department Of HO. r 215 Church Avenue, Oshkosh,WI 54901 ON THE WATER TO: Honorable Mayor and Members of the Common Council FROM: Allen Davis, Community Development Director ;1. I DATE: October 4, 2012 SUBJECT: Approve Amendment to Professional Service Agreement with AECOM for Engineering Services for Riverwalk Improvements at Boat Works Property BACKGROUND The Community Development Department requested a design and permitting services contract amendment from AECOM for the design and permitting of the future redevelopment of the Boatworks Property on the northeast quadrant of Michigan St. and 4th Ave. ANALYSIS The amended scope of services is related to the design, mapping, and permitting process required with the Wisconsin Department of Natural Resources, US Coast Guard and Army Corps of Engineers. The scope of the project would include the riverwalk extension, including a bridge system, dredging of the docking area, docks and a possible boat landing, and other public improvements on the property. Environmental remediation will also play a large role in this segment of the river walk project and property redevelopment. The original contract for preliminary design and initial WisDNR permitting was for $47,500 and was approved this spring. The contract amendment totals $121,000 for a total contract price of$168,500. Staff has been working on multiple grant applications in concert with AECOM design and permitting for the 2013 construction season for trail construction, site remediation, and possible dredging projects for the Boatworks property with the Redevelopment Authority, the owner of the property. FISCAL IMPACT The funds for these professional services are included in the approved 2012 Capital Improvement Program, and are available in Account Number 534-1040-7216-07280. Construction for this segment of the riverwalk is scheduled for the 2012 and 2013 Capital Improvement Program. RECOMMENDATION The City Council approves the contract amendment as presented. Approved, City Manager AECOM AECOM 558 North Main Street,Oshkosh,WI 54901 T 920.236.6718 F 920.235.0321 Amendment to Agreement Form Amendment No. 1 WRAPP for Boat Works Riverwalk and Marina Development Project AECOM Project No. 6026330 RETURN TO: AECOM Date: October 2, 2012 558 North Main Street Oshkosh,WI 54901 Attention: Paul Timm SUMMARY: Original Contract Amount: $47,500 Total Previous Change Orders: $0.00 Amount this Change Order: $121,000 Revised Contract Amount $168,500 Amendment# DESCRIPTION AMOUNT 1 1. Revisions to WRAPP Plan Set and Text $5,000 Based on WDNR Initial Comments During Site Review Meeting. 1.Additional Costs to date - $15,000 These costs are for the preparation of the response to the U.S. Army Corps of Engineers' (USACE`s)comments, the initial review and discussion with the U.S. Coast Guard (USCG)of their requirements for the bridge permit, and follow-up conversations with the WIDNR to get clarification on the requirements for the Chapter 30 permit and for what they require relative to the other agencies requirements. 2. Engineering $39,000 2 (a). Initial Bridge Design-$19,000 These costs include the minimum design drawings necessary to address the USCG permit for the approval of the pedestrian bridge permit It includes the preparation of the design drawings and an initial cost estimate for the bridge. 2 (b). Geotechnical Engineering-$20,000 This is for the geotechnical engineering required for the bridge foundations, the piers, and the shoreline improvements. AECOM AECOM 558 North Main Street,Oshkosh,WI 54901 T 920.236.6718 F 920.235.0321 Amendment to Agreement Form 3. State and federal permitting $47,000 3(a). Preparation of USCG permit—$ 12,000 These costs are those necessary to take the bridge design and incorporate the required information from the Environmental Section described below as Task 3(b) into the permit application to submit an application meeting the requirements as specified in the USCG permit guidance document formatted in a manner that will expedite the permit process. 3(b). Environmental Section-$20,000 This section is required to be completed in accordance with: National Environmental Policy Act(NEPA) of 1969 (Section 102[2][c]), as implemented by the Council on Environmental Quality(CEQ) regulations (40 CFR parts 1500-1508)for the bridge installation, the modifications to the shoreline, and the dredging process. The work to be completed in this section overlaps with the WDNR, USACE, and USCG requirements for the project. Following discussions with the USCG, this project will not require an Environmental Assessment (EA), and qualifies for a Categorical Exclusion (CatEx). To fulfill the requirements of the permit and document the CatEx, a natural resources survey(includes threatened and endangered species, wetlands,floodplain, and terrestrial and aquatic habitats)and a cultural and historical review and consultation with the State Historic Preservation Office(SHPO). The activities will include a site/project survey and consultations with the appropriate state and federal agencies to expedite the review and approval process. 3(c). Dredging plan and WIDNR Permitting- $10,000 This is for the preparation of the dredging plans and the compilation of the figures for submittal of the information required for the WDNR to approve the permitting of the Bridge and the associated improvements, and the issuance of the Chapter 30 permit. 3(d). Additional Environmental sampling - A=COM AECOM 558 North Main Street,Oshkosh,WI 54901 T 920.236.6718 F 920.235.0321 Amendment to Agreement Form $5,000 This includes the collection of additional sediment and soil (landward)samples for profiling for landfill acceptance of the dredge spoils and contaminated soil removed during demolition and construction.This information is required in the dredging plan for the WDNR. 4. Project Management-$15,000 $15,000 This is to cover the cost of 3-meetings with the various agencies to address their comments on the draft documents, to revise the submittals, and to prepare a final set of plans and submittals. It also includes money for the grant oversight function. Total $121,000 M City of Oshkosh By: / —• By: ,tee 2.. n � 4 °� Pail Timm �. J Title: Title: Date: /0— a- l a Date: AECOM By: /O —1 -1 Kevin Brehm Title: A -o•ate Vice Pres:•en Date: MINFIP7 AECOMAECOM 920.235.0270 tel /�1� 558 North Main Street 920.235.0321 fax Oshkosh,Wisconsin 54901 Authorization October 2, 2012 I hereby certify that the necessary provisions have been made to pay the liability which will accrue under this contract. I hereby authorize AECOM to proceed with the additional scope of work for the Boat Works Project in Oshkosh,Wisconsin as outlined in Amendment 1 dated October 2, 2012, with an increased budget authorization of$121,000, for a total project cost of$168,500 under the general terms and conditions specified in the proposal. Signature Date Mark A Rohloff Print Name City Manager Title/Organization Signature Date Pamela R. Ubrig; Print Name City Clerk Title/Organization Signature Date Lynn A. Lorenson; Print Name City Attorney Title/Organization Signature Date Peggy A. Steeno Print Name Director of Finance Title/Organization To enhance and sustain the world's built,natural and social environments This fax is a confidential communication intended for the individual or entity named above. If the reader of this message is not the intended recipient,please delete and note that dissemination,distribution,or copying of this communication is prohibited. Thank You.