HomeMy WebLinkAbout0152566 - Plumbing (replace water heater) CITY OF OSHKOSH
OSHKOSH No 152566
ON THE WATER PLUMBING PERMIT -APPLICATION AND RECORD
Job Address 1720-1730 LOMBARD AVE Owner 1720/1722/1724/1726/1728/1730 LOMBARD AV Create Date 09/25/2012
Contractor MOREMAN PLBG&HTG SERVICE ---
-------- Category 446-Commercial-Water Heaters
Inspector Jerry Fabisch — — Plan
Bathtub Clothes Wshr Classrm Sink
Bathtub
Surgeons Sink Roof Drain
_ _Lndry Tray Exam Sink Deduct Meters
Whirlpool Sump Pump Sterilizer Soda Disp Wtr Sewer Mtrs
p p F Prep Sink RPZ Valve
Lavatory San Sump/Pump Flr/Wst Sink Coffee Maker Misc.
Usage Mtrs
Toilet Bidet Site Drain -----
Water Softner Hand Sink Fixtures
Kit Sink - - Urinal Wait.St. Fixtures ----
Standp Rec __ Sink
— Beer Tap Ice Chest
Disposal
Gar Drain Plaster Sink
Dishwasher Local Dip Well Comm Ice Maker
cal Waste Sculry Sink Drink Ftn
Floor Drain Bar Sink S _ Int Grease Trap
Sery Sink Wash Ftn Ext Grease Trap
Hose Bibb Breakrm Sink Sham Sink
Water Heater 1 p Catch Basin —_Eye Wash Statn
Use/Nature )MULTI-FAMILY(1720)/REPLACE ELECTRIC WATER HEATER, ELECTRICIAN IS SECKAR ELECTRIC **debit acct
of Work i
Size ------Material Type -- # --- — -
Sanitary Sewer Conn.Type
Storm Sewer
Water Service
Parcel Id#
Valuation $600.0 Plan Approval 1611230000
pproval $0.00 Permit Fees
$25.00 ❑ Permit Voided
Issued By do,.
i� "' Date 09/25/2012
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement,the City strongly urges the permit applicant to contact the
easement holder(s)and to secure any necessary approvals before starting such activity.
Signature
Date
Agent/Owner
Address _ BOX 1325 — _ OSHKOSH
WI 54903 -1325 Telephone Number (920)231-9191
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing,Service, Final,etc.),Access into Building if Secure(how do we gain entry),your Name and Phone
Number. Unless specified otherwise,we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.