Loading...
HomeMy WebLinkAbout0152495 - Building (roof) CITY OF OSHKOSH No 152495 OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD ON THE WATER Job Address 1370 MARICOPA DR Owner TODD S/TERI A MOLDREM Create Date 09/20/2012 Designer Contractor OWNER Inspector Nicole Krahn Category 041_Residential Roofing Plan Type • Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning R-1 Class of Const: Size Unfinished/Basement Sq.Ft. Rooms Height Ft. ❑ Projection Finished/Living _ Sq.Ft. Bedrooms Stories Canopies Garage Sq.Ft. Baths Signs Foundation • Poured Concrete 0 Floating Slab 0 Pier 0 Other 0 Concrete Block 0 Post 0 Treated Wood Occupancy Permit Not Required Occupancy Fee $0.00 Flood Plain Height Permit Not Required Park Dedication Not Required #Dwelling Units 0 #Structures 0 Use/Nature SFR/TTTEAR OFF AND REPLACE EXISTING ROOFING, INSTALL NEW GUTTERS AND DOWNSPOUTS AND REPLACE 3 of Work SKYLIGHTS DUE TO HAIL DAMAGE ON THE HOUSE AND ATTACHED GARAGE-NO STRUCTURAL CHANGES **check#1007 HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $1 ,000.00 Plan Approval $0.00 Permit Fee Paid $106.00 Park Dedication $0.00 Issued By: ) Date 09/20/2012 Final/O.P. 00/00/0000 // ❑ Permit Voided Parcel Id# 1312460000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party,if you perform the work described in this permit application within an easement,the City strongly urges the permit applicant to contact the easement holder(s)and to secure any necessary approvals before starting such activity. I have read and understand t e afore mentioned information. Sign Date O 20 7 Agent/Owner Address Oshkosh WI 54901 - 0000 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final,etc.),Access into Building if Secure(how do we gain entry),your Name and Phone Number. Unless specified otherwise,we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.