HomeMy WebLinkAbout0152504 - Building (siding) CITY OF OSHKOSH No 152504
OSHKOSH BUILDING PERMIT -APPLICATION AND RECORD
ON THE WATER
Job Address 154 W 24TH AVE Owner JOHN C/DARYAA QUANDT Create Date 09/20/2012
Designer Contractor ARC CONTRACTING OF WISCONSIN INC
Inspector Nicole Krahn
Category 042-Residential Siding Plan
Type •Building 0 Sign O Canopy 0 Fence 0 Raze
Zoning R-1 Class of Const: Size
Unfinished/Basement Sq.Ft. Rooms Height Ft. ❑ Projection
Finished/Living Sq.Ft. Bedrooms Stories Canopies
Garage Sq. Ft. Baths Signs
Foundation • Poured Concrete 0 Floating Slab 0 Pier O Other
0 Concrete Block O Post O Treated Wood
Occupancy Permit Not Required Occupancy Fee $0.00 Flood Plain Height Permit Not Required
Park Dedication Not Required #Dwelling Units 0 #Structures 0
Use/Nature ,SFR/REPLACE STEEL WITH VINYL SIDING ON THE HOUSE AND GARAGE AND ROOFING-NO STRUCTURAL CHANGES
of Work "*debit acct
HVAC Contractor Plumbing Contractor
Electric Contractor
Fees: Valuation $6,197.00 Plan Approval $0.00 Permit Fee Paid $67.00 Park Dedication $0.00
Issued By: 5 " 'W Date 09/20/2012 Final/O.P. 00/00/0000
❑ Permit Voided Parcel Id# 1403390000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement,the City strongly urges the permit applicant to contact the easement
holder(s)and to secure any necessary approvals before starting such activity.
I have read and understand the afore mentioned information.
Signature Date
Agent/Owner
Address 1496 NORTH ST NEENAH WI 54956 - 1812 Telephone Number (920)886-7663
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection(i.e. Footing,Service, Final,etc.),Access into Building if Secure(how do we gain entry),your Name and Phone
Number. Unless specified otherwise,we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.
Sep 19 12 04:OOp ARC Contracting 920-886-1073 p.3
Q33
City of Oshkosh
Inspection Services Division
P O Box 1 130
Oshkosh, WI 54903-1 130
Phone: (920) 236-5050 Q 1 {CiJI
Fax: (920)236-5084 n;:--t Vir`,r=e
Roofing & Siding Permit Application
• Application(s) and lee(s)can be brought to City Hall, Room 205 or mailed to lnspecr.ior. Services, PO Box 1128,
Oshkosh WI 54903-1[28. Commencing work without permit(s) will result in fees being doubled or S[00.00 plus the
normal permit fee, which ever is greater.
OR
!f3•ou area ccoiractor participruiing in the Permit fee Account System and hove adequate fun;.-is. check here
if uou wan/ this processed throu;h your account
.10B ADDRESS— S 4_ \t- _ 2_44 A1 — —
('ONTRAcroti e C+1 r\9 -
l am the: ❑ Owner OR IN Contractor
USE CATEGORY
j Single Family ❑ Duple. C Muter.-Family ❑ Rental ❑ Commercial ❑ industrial
Work being done:
ROOFING
Tear otiand repla.e existing rooting on❑house. ❑garage
❑Replace wood decking
❑Add 1 layer DI rooting to the existing layer(s)on❑ house,❑garage
his work is being done due to Damage ❑Other
SI DENG
Install siding on ?Yfhu se. Lr4 garage
❑ Replacing vinyl with vinyl
Replaoirna aluminum%rich vinyl(circle stce. or aluminum)
❑ Replacing with
fhis work is being done due to❑Hail Damage ❑ Otter
When siding is done, one of the boxes below must be checked:
i) O lileclri -L\isting Electric Meter.receptacle, lighting and 2lectrtc Service entrance alterariunslntoditicatro:s are being perlormcd
by
t`same CI-Iit3sed C 131ecnic u:onrracr.x)
AND Electric Installation Verification form is attached OR Separate Elect Permit wiV be requested
2) C 1 !cc tric—Not Applicable hocau e(J Bloc..: preciously installed No outside IIghLe. Otter
❑Install new or❑ Replace_gutters
f install tety or❑ Replace downspouts
Other related work being done: (please note)
Value of the job $ �?__ _linel.td fair market price Cor labor teen Lyon arc not paying lot labor)
Received Time Se.p. 19. 2012 3; 58PV No 0910