Loading...
HomeMy WebLinkAbout0152408 - Building (reconstruct existing driveway) l CITY OF OSHKOSH No 152408 OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD ON THE WATER Job Address 2036-2050 BOWEN ST — Owner OSHKOSH HOUSING AUTHORITY Designer -- - _— Create Date 09/14/2012 — Contractor FOX VALLEY ASPHALT _ Inspector Nicole Krahn — -- — Category 256-Residential Driveway Plan Type • Building Sign—_-- 9 — 0 Canopy 0 Fence 0 Raze Zoning C-2 Class of Const: Size Unfinished/Basement Sq.Ft. Rooms Height Ft. ❑ Projection Finished/Living Sq. Ft. Bedrooms Stories Canopies ___ Garage Sq.Ft. Baths Signs _ Foundation 0 Poured Concrete 0 Floating Slab 0 Pier 0 Other 0 Concrete Block 0 Post 0 Treated Wood Occupancy Permit Not Required Occupancy Fee $0.00 Flood Plain Height Permit Park Dedication — #Dwelling Units 0 #Structures _0 Use/Nature COMM/Reconstruct 41'x18'area of existing access driveway per submitted site plan. of Work HVAC Contractor — Plumbing Contractor Electric Contractor Fees: Valuation $5,000.00 Plan Approval $0.00 Permit Fee Paid $84.00 Park Dedication _ $0.00 Issued By: -.� .4, Date 09/17/2012 Final/O.P. 00/00/0000 ❑ Permit Voided I Parcel Id# 1519430000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement,the City strongly urges the permit applicant to contact the easement holder(s)and to secure any necessary approvals before starting such activity. I have read and under an. i afore Mentioned info • - I. Signature 7 r,� - _ Date I GI! Agent/Owner Address 7526 STATE HWY 76 NEENAH WI 54956 - 0000 Telephone Number 722-8222 OR 1-800-; To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number,Type of Inspection(i.e. Footing,Service, Final,etc.),Access into Building if Secure(how do we gain entry),your Name and Phone Number. Unless specified otherwise,we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.