Loading...
HomeMy WebLinkAbout0152401 - Building (windows) CITY OF OSHKOSH No 152401 OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD ON THE WATER Job Address 1728 MOUNT VERNON ST Owner DAVID S/TERRA L KRUEGER Create Date 09/17/2012 Designer Contractor STEVE WIRTZ CONSTRUCTION Inspector Nicole Krahn Category 040-Windows Plan Type • Building O Sign 0 Canopy 0 Fence O Raze Zoning R-2 Class of Const: Size Unfinished/Basement Sq. Ft. Rooms Height Ft. Projection Finished/Living Sq.Ft. Bedrooms Stories Canopies Garage Sq.Ft. Baths Signs Foundation • Poured Concrete O Floating Slab 0 Pier O Other 0 Concrete Block 0 Post 0 Treated Wood Occupancy Permit Not Required Occupancy Fee $0.00 Flood Plain Height Permit Park Dedication #Dwelling Units 0 #Structures 0 Use/Nature SFR/Installation of replacement windows and new exterior doors(same size and location). of Work HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $6,800.00 Plan Approval $0.00 Permit Fee Paid $67.00 Park Dedication $0.00 Issued By: J ��,��� Date 09/17/2012 Final/O.P. 00/00/0000 9 Permit Voided Parcel Id# 1504320000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement,the City strongly urges the permit applicant to contact the easement holder(s)and to secure any necessary approvals before starting such activity. I have read and understand the afore mentioned information. Signature Date Agent/Owner Address N6334 TOWER ROAD FOND DU LAC WI 54937 - 7321 Telephone Number 920-923-6063 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number,Type of Inspection (i.e. Footing,Service, Final, etc.),Access into Building if Secure(how do we gain entry),your Name and Phone Number. Unless specified otherwise,we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.