Loading...
HomeMy WebLinkAbout0152158 - Building (New Single Family) CITY OF OSHKOSH No 152158 OSHKOSH BUILDING PERMIT -APPLICATION AND RECORD ON THE WATER Job Address 507 W 6TH AVE Owner DENNIS L RYCKMAN - —__- _- Create Date 09/04/2012 Designer Contractor OWNER Inspector Nicole Krahn Category 11.0-New Single Family Plan UDC-3631-0912 Type • Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning R-2 Class of Const: 8 - __ Size 1790 SQ FT Unfinished/Basement 510 Sq.Ft. Rooms 1 Height 22 Ft. D Projection Finished/Living 1790 Sq.Ft. Bedrooms 3 Stories Quad-level Canopies Garage 576 Sq.Ft. Baths 2 --_ Signs Foundation • Poured Concrete 0 Floating Slab O Pier O Other 0 Concrete Block O Post O Treated Wood Occupancy Permit Required Occupancy Fee $0.00 Flood Plain No Height Permit Not Required Park Dedication Not Required #Dwelling Units 1 _- #Structures 1 Use/Nature ■SFR/New single family home,8'x 3'9"rear deck and a 16'9"x 4'8"front porch. This permit also includes d of Work garage to provide fire seperation requirements. rywalling the detached I 1 HVAC Contractor ANDERSON HVAC LLC — _ Plumbing Contractor D.R.HANSEN PLBG. Electric Contractor SECKAR ELECTRIC CO INC Fees: Valuation $86,602.00 Plan Approval $75.00 Permit Fee Paid $499.00 Park Dedication $0.00 Issued By: 31fn ------- -- Date 09/06/2012 Final/O.P. 00/00/0000 Ei Permit Voided 11 Parcel Id#0600630000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party,if you perform the work described in this permit application within an easement,the City strongly urges the permit applicant to contact the easement holder(s)and to secure any necessary appr.vals before stay ng such activity. c I have read and u -r .nt the afore menti'ned informs J (- Signature .11 “ii-/All ` L' / 0I Date Aril 2='___W Address Oshkosh WI 54901 0000 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 rioting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final,etc.),Access into Building if Secure(how do we gain entry), your Name and Phone Number. Unless specified otherwise,we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.