HomeMy WebLinkAbout2012-Building (exterior landing) CITY OF OSHKOSH No 152232
OSHKOSH BUILDING PERMIT -APPLICATION AND RECORD
ON THE WATER
Job Address 346 ROSALIA ST Owner DEVON E/SUSAN K JONES Create Date 09/06/2012
Designer Contractor PEPPLER REMODELING
Inspector John Zarate
Category 043-Residential Decks Plan
Type • Building 0 Sign 0 Canopy O Fence O Raze
Zoning R-2 Class of Const: Size
Unfinished/Basement Sq.Ft. Rooms Height Ft. ❑ Projection
Finished/Living Sq.Ft. Bedrooms Stories Canopies
Garage Sq.Ft. Baths Signs
Foundation • Poured Concrete 0 Floating Slab 0 Pier O Other
O Concrete Block O Post ❑ Treated Wood
Occupancy Permit Occupancy Fee $0.00 Flood Plain Height Permit
Park Dedication #Dwelling Units 0 #Structures 0
Use/Nature SFR/Exterior landing*3'x8'landing on the south side of the house to serve an existing entrance to the house.
of Work
it
HVAC Contractor Plumbing Contractor
Electric Contractor
Fees: Val ation `` $3,000.00 Plan Approval $0.00 Permit Fee Paid $39.00 Park Dedication $0.00
Issued B W Date 09/10/2012 Final/O.P. 00/00/0000
❑ Permit Voided Parcel Id#0206500000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshko as no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this per • ap•lication wit 'n an easement,the City strongly urges the permit applicant to contact the easement
holder(s)and to se r- =n necess app als before starting such activity.
have read and u ':erst d he a r e oned information.
Signature Date /U Z.
Agent/Owner
Address W2380 COUNTY Q BERLIN WI 54923 - 0000 Telephone Number 920-361-7731
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number,Type of
Inspection(i.e. Footing,Service, Final,etc.),Access into Building if Secure(how do we gain entry),your Name and Phone
Number. Unless specified otherwise,we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.