Loading...
HomeMy WebLinkAbout2012-Building (exterior landing) CITY OF OSHKOSH No 152232 OSHKOSH BUILDING PERMIT -APPLICATION AND RECORD ON THE WATER Job Address 346 ROSALIA ST Owner DEVON E/SUSAN K JONES Create Date 09/06/2012 Designer Contractor PEPPLER REMODELING Inspector John Zarate Category 043-Residential Decks Plan Type • Building 0 Sign 0 Canopy O Fence O Raze Zoning R-2 Class of Const: Size Unfinished/Basement Sq.Ft. Rooms Height Ft. ❑ Projection Finished/Living Sq.Ft. Bedrooms Stories Canopies Garage Sq.Ft. Baths Signs Foundation • Poured Concrete 0 Floating Slab 0 Pier O Other O Concrete Block O Post ❑ Treated Wood Occupancy Permit Occupancy Fee $0.00 Flood Plain Height Permit Park Dedication #Dwelling Units 0 #Structures 0 Use/Nature SFR/Exterior landing*3'x8'landing on the south side of the house to serve an existing entrance to the house. of Work it HVAC Contractor Plumbing Contractor Electric Contractor Fees: Val ation `` $3,000.00 Plan Approval $0.00 Permit Fee Paid $39.00 Park Dedication $0.00 Issued B W Date 09/10/2012 Final/O.P. 00/00/0000 ❑ Permit Voided Parcel Id#0206500000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshko as no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this per • ap•lication wit 'n an easement,the City strongly urges the permit applicant to contact the easement holder(s)and to se r- =n necess app als before starting such activity. have read and u ':erst d he a r e oned information. Signature Date /U Z. Agent/Owner Address W2380 COUNTY Q BERLIN WI 54923 - 0000 Telephone Number 920-361-7731 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number,Type of Inspection(i.e. Footing,Service, Final,etc.),Access into Building if Secure(how do we gain entry),your Name and Phone Number. Unless specified otherwise,we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.