HomeMy WebLinkAbout0152202 - Building (office remodel) CITY OF OSHKOSH No 152202
OSHKOSH COMMERCIAL BUILDING PERMIT -APPLICATION AND RECORD
ON THE WATER
Job Address 150 LIBBEY AVE Create Date 08/22/2012
Project Office Space remodel Project Number 20120163
Owner TRIANGLE MFG CO INC Plan file-3623-0812
Contractor MIRON CONSTRUCTION CO INC
Inspector John Zarate
Designer
Category 211 -Alteration Industrial Type of Plan
Zoning M-2 Square Footage
Major Occ Const Class
Fire Protection O Sprinkled O Unsprinkled I Sprinkler Design
Occupancy Permit Not Required Flood Plain Height Permit
Park Dedication #Dwelling Units 0 #Structures 0
Projection Canopies Signs
Use/Nature
of Work
1IND/Office remodel*to create 2 offices within in an existing space. A demountable wall will be moved and 2 new walls and 2 doors will be added to
make the 2 new offices. HVAC is properly sized as existing and will not need to be altered. **check#368897
HVAC Contractor Plumbing Contractor
Electric Contractor WITZKE ELECTRIC INC
Fees: Valuation I $8,000.00 Plan Approval $50.00 Permit Fee Paid $74.00 Park Dedication $0.00
Issued By:3Y-Y)l_J Date 09/07/2012 Final/O.P, 00/00/0000
Permit Voided Parcel Id# 1519600200
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party,if you perform the work
described in this permit application within an easement,the City strongly urges the permit applicant to contact the easement
holder(s)and to secure any necessary approv- before starting such activity.
I have read t r ation.
Signature i �t� Date 11
Agent/Owner
Address PO BOX 509 NEENAH WI 54957 - 0509 Telephone Number 920-969-7000
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number,Type of
Inspection (i.e. Footing, Service, Final,etc.),Access into Building if Secure(how do we gain entry),your Name and Phone
Number. Unless specified otherwise,we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.