Loading...
HomeMy WebLinkAbout0152202 - Building (office remodel) CITY OF OSHKOSH No 152202 OSHKOSH COMMERCIAL BUILDING PERMIT -APPLICATION AND RECORD ON THE WATER Job Address 150 LIBBEY AVE Create Date 08/22/2012 Project Office Space remodel Project Number 20120163 Owner TRIANGLE MFG CO INC Plan file-3623-0812 Contractor MIRON CONSTRUCTION CO INC Inspector John Zarate Designer Category 211 -Alteration Industrial Type of Plan Zoning M-2 Square Footage Major Occ Const Class Fire Protection O Sprinkled O Unsprinkled I Sprinkler Design Occupancy Permit Not Required Flood Plain Height Permit Park Dedication #Dwelling Units 0 #Structures 0 Projection Canopies Signs Use/Nature of Work 1IND/Office remodel*to create 2 offices within in an existing space. A demountable wall will be moved and 2 new walls and 2 doors will be added to make the 2 new offices. HVAC is properly sized as existing and will not need to be altered. **check#368897 HVAC Contractor Plumbing Contractor Electric Contractor WITZKE ELECTRIC INC Fees: Valuation I $8,000.00 Plan Approval $50.00 Permit Fee Paid $74.00 Park Dedication $0.00 Issued By:3Y-Y)l_J Date 09/07/2012 Final/O.P, 00/00/0000 Permit Voided Parcel Id# 1519600200 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party,if you perform the work described in this permit application within an easement,the City strongly urges the permit applicant to contact the easement holder(s)and to secure any necessary approv- before starting such activity. I have read t r ation. Signature i �t� Date 11 Agent/Owner Address PO BOX 509 NEENAH WI 54957 - 0509 Telephone Number 920-969-7000 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number,Type of Inspection (i.e. Footing, Service, Final,etc.),Access into Building if Secure(how do we gain entry),your Name and Phone Number. Unless specified otherwise,we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.