Loading...
HomeMy WebLinkAbout06. 12-431 SEPTEMBER 11, 2012 12-431 RESOLUTION (CARRIED__6-0_____ LOST _______ LAID OVER _______ WITHDRAWN _______) PURPOSE: APPROVAL OF CHANGE ORDER NO. 3 FOR PUBLIC WORKS CONTRACT 11-04 WITH LALONDE CONTRACTORS, INC. FOR VARIOUS CONCRETE PAVING & UTILITY PROJECTS – CENTRAL CITY AREA (-$153,040.24) INITIATED BY: DEPARTMENT OF PUBLIC WORKS BE IT RESOLVED by the Common Council of the City of Oshkosh that the following Change Order, a copy of which is attached, is hereby approved: LALONDE CONTRACTORS, INC. P.O. Box 070420 Milwaukee, WI 53207 Net Decrease to contract: $153,040.24 PURPOSE: See attached Change Order. OJHKOJH ON THE WATER MEMORANDUM TO: Honorable Mayor and Members of the Common Council FROM: Steven M. Gohde, Assistant Director of Public Works DATE: September 6, 2012 RE: Approval of Change Order #3 for Public Works Contract No. 11-04 with La Londe Contractors, Inc. for Various Concrete Paving and Utility Projects—Central City Area (-$153,040.24) BACKGROUND Change Order#3 for Contract 11-04 is scheduled for consideration by the Common Council at the September 11, 2012 meeting. The contract was originally awarded to LaLonde Contractors Inc. in March of 2011. This change order is for additional work required to complete the project and for final quantities. ANALYSIS Following is a summary of the significant changes to each section of the CIP: • Paving —Additional sidewalk was removed and 6" thick sidewalk installed along the UW-O property, at their request. This additional work will be assessed. Concrete quantities were reduced due to Osceola Street not being fully paved and the pedestrian mall being made asphalt. Asphalt quantity increased to pave pedestrian mall. • Storm Sewer— Conflicts with UW-O duct package prevented large storm sewer installation on Osceola Street. • Sanitary Sewer—Installed quantities on several items were less than estimated. • Water Main —Additional costs and materials to install water on Elmwood Avenue to avoid conflicts with AT&T ducts, UW-O ducts, and steam tunnels. FISCAL IMPACT Contract Section Change Order Amount New Contract Total CIP Budget Amount Concrete Paving $904.21 $1,454,420.82 $2,031,233 Storm Sewer -$144,868.59 $2,094,992.75 $2,644,000 Sanitary Sewer -$34,638.03 $1,188,577.31 $1,595,300 Water Main $25,562.17 $1,116,770.01 $1,131,800 Total -$153,040.24 $5,854,760.89 $7,402,333 Adequate funds are available in the related sections of the 2011 Capital Improvement Budget. RECOMMENDATIONS I recommend approval of the Change Order#3 to Contact No. 11-04 in the amount of-$153,040.24 to La Londe Contractors, Inc. Approved: (( "--Fed-471 Mark A. Rohloff City Manager SMG/tlt 1:1Engineering111-04 Concrete Paving and Utilities Northeast\Project_Information\Correspondence\Memo 111-04 CO#3_9-6-12.docx CONTRACT: 11-04 CHANGE ORDER#3 CHANGE ORDER# 3* DATED: 8/22/12 TO: LaLonde Contractors Inc P 0 Box 070420 Milwaukee, WI 53207 Your present contract with the City of Oshkosh, Contract No. 11-04 , is hereby amended and changed as follows: NET DECREASE TO: SECTION I -CONCRETE PAVING ($4,871.79) NET DECREASE TO: SECTION II -STORM SEWER ($144,868.59) NET DECREASE TO: SECTION III -SANITARY SEWER ($34,638.03) NET INCREASE TO: SECTION IV-WATER MAIN $25,562.17 NET DECREASE TO CREDIT-ALTERNATE B: $5,776.00 NET DECREASE TO CONTRACT: ($153,040.24) *NOTE: This change order only reflects final changes in quantity, but does not reflect any liquidated damages, penalties, or other deductions that may be assessed against this Contract, which may limit disbursements by the City of Oshkosh. CITY OF OSHKOSH BY: Recommended: City Manager Director of Public Works City Clerk Approved and accepted: Contractor I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under the within Change Order. Comptroller Approved as to form: City Attorney CONTRACT: 11-04 CHANGE ORDER#3 SECTION I-CONCRETE PAVING ITEM DESCRIPTION UNIT BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE 100 Pavement removal, Square complete as specified Yards 20,975 19,847.90 -1,127.10 $2.15 ($2,423.27) _ 101 Sidewalk and driveway removal,complete as Square specified Feet 49,400 70,083.70 20,683.70 $0.48 $9,928.18 _ 102 Excavation,complete as Cubic specified Yards 10,650 9,300.60 -1,349.40 $9.48 ($12,792.31) _ 103 7"Non-reinforced concrete pavement, including integral curb,5"base material and grading, complete as specified Square Yards 2,010 1,991.30 -18.70 $24.95 ($466.57) _ 104 8"Concrete pavement, including integral curb and 6"base material and grading,complete as Square specified Yards 22,485 19,603.80 -2,881.20 $26.71 ($76,956.85) _ 105 8"Concrete pavement, HES,including integral curb and 6"base material and grading,complete as Square specified Yards 1,210 961.30 -248.70 $38.51 ($9,577.44) _ 106 8"Doweled concrete pavement, including integral curb and 6"base material and grading, Square complete as specified Yards 210 129.60 -80.40 $41.64 ($3,347.86) _ 107 12"Wide radius curb head, complete as specified Linear Feet 960 1,056.10 96.10 $6.68 $641.95 _ 108 Standard 24"and 30"curb &gutter,7"(tie-in), Linear complete as specified Feet 1,200 1,604.40 404.40 $18.80 $7,602.72 _ 109 Sidewalk curb, complete Linear as specified Feet 170 74.00 -96.00 $19.00 ($1,824.00) _ 110 4"Concrete sidewalk, Square complete as specified •Feet 26,625 15,868.20 -10,756.80 $3.05 ($32,808.24)_ 111 6"Concrete sidewalk& driveway, complete as Square specified Feet 22,985 48,319.10 25,334.10 $3.45 $87,402.65 _ 112 3W Asphaltic concrete driveway,complete as Square specified Yard 70 536.10 466.10 $55.20 $25,728.72 113 3'/"Asphaltic concrete pavement,with base, Square complete as specified Yard 2,305 2,067.80 -237.20 $24.75 ($5,870.70) 114 3'/2"Asphaltic concrete transition,with base, Square complete as specified Yard 1,350 1,519.70 169.70 $22.25 $3,775.83 _ 115 Furnish and install crushed stone base course, complete as specified Tons 3,850 22.20 -3,827.80 $8.50 ($32,536.30)_ 116 Sawing,complete as Linear specified Feet 3,125 3,022.00 -103.00 $1.31 ($134.93) _ Page 1 of 21 CONTRACT: 11-04 CHANGE ORDER#3 ITEM DESCRIPTION UNIT BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE 117 Furnish and install pavement ties(epoxy coated),complete as specified Each 375 350.00 -25.00 $10.00 ($250.00) 118 Adjust manholes and inlets,complete as specified Each 207 214.00 7.00 $320.00 $2,240.00 119 Furnish and install No.4 reinforcing bars(epoxy coated),complete as Linear specified Feet 800 1,212.00 412.00 $1.25 $515.00 120 Remove trees and stumps, complete as specified inc, Diameter 45 114.00 69.00 $26.70 $1,842.30 121 Furnish and install trees, complete as specified Each 1 3.00 2.00 $250.00 $500.00 122 Provide and install metal detectable warning plates, complete as specified Square Feet 672 632.00 -40.00 $28.00 ($1,120.00) 123 Terrace work on Algoma Boulevard, complete as Lump specified Sum 1 1.00 $3,975.00 124 Terrace work on Church Avenue, complete as Lump specified Sum 1 1.00 $8,550.00 125 Terrace work on Elmwood Avenue(Algoma to Irving), complete as specified Lump Sum 1 1.00 $5,375.00 126 Terrace work on Elmwood Avenue(Irving to Vine), Lump complete as specified Sum 1 1.00 $24,000.00 127 Terrace work on John Street,complete as Lump specified Sum 1 1.00 $7,100.00 128 Terrace work on Osceola Avenue(Fox River to Pearl Avenue),complete as Lump specified Sum 1 1.00 $4,375.00 129 Terrace work on Osceola Avenue(Pearl Avenue to Algoma Boulevard), Lump complete as specified Sum 1 1.00 $9,600.00 130 Terrace work on Packer Avenue, complete as Lump specified Sum 1 1.00 $11,400.00 131 Excavation,Special, complete as specified Tons 600 4,137.94 3,537.94 $10.15 $35,910.09 132 Load and Haul contaminated material, complete as specified Tons 150 5.34 -144.66 $6.00 ($867.96) 133 8"Concrete pavement handwork, including integral curb and 6"base material and grading, Elmwood Avenue cul-de- sac alternate,complete as Square specified Yards 685 678.20 -6.80 $37.39 ($254.25) Page 2 of 21 CONTRACT: 11-04 CHANGE ORDER#3 ^ ITEM DESCRIPTION UNIT BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE 134 3 W Asphaltic concrete path,with base,Elmwood Avenue cul-de-sac alternate,complete as Square specified Yards 1,025 797.40 -227.60 $22.25 ($5,064.10) 135 Preparation of foundation for asphalt paving for Elmwood Avenue cul-de- sac alternate,complete as Lump specified Sum 1 1.00 $6,000.00 136 Terrace work on Elmwood Avenue cul-de-sac alternate,complete as Lump specified Sum 1 1.00 $8,300.00 137 8"Concrete sidewalk& driveway, complete as Square specified Feet 2925 1,115.80 -1,809.20 $3.75 ($6,784.50) _ 138 Concrete speed hump with curb&gutter,complete as Lump specified Sum 4 4.00 $2,100.00 139 2"Asphaltic concrete transition with base and asphaltic curb,complete Square as specified Yards 400 621.70 221.70 $23.50 $5,209.95 SECTION I-(BID ITEMS 100-139)-SUB-TOTALS $181,297.39 ($193,079.28) ADDITIONAL WORK REQUIRED: C.O.#3-SECTION I ITEM CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE 10000 Additional labor,materials, and equipment to furnish and install cold mix patch in the Pearl&Osceola intersection,due to the delay in storm sewer construction, per Invoice (004)dated 4/27/11, complete as specified Lump Sum 1.00 1.00 $2,104.56 10001 Additional price increase to do hand work paving on Osceola Street due to change of width from UW- O Fiber duct package in conflict, per Invoice(030) dated 7/11/11, complete as Square specified Yards 1,215.00 1,215.00 $8.00 10002 Additional Days added to the completion date due to extra work and delays Days 21.00 21.00 $0.00 — Page 3 of 21 CONTRACT:11-04 CHANGE ORDER#3 ITEM DESCRIPTION UNIT BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE 10003 Additional equipment, labor,and materials to re- grade the subgrade due to adjustment in grade,per Invoice(048),for work performed on 8/16/11, Lump complete as specified Sum 1.00 1.00 $260.50 10004 Additional equipment, labor,and materials to place temporary asphalt in sidewalk areas, per Invoice (057),for work performed on 6/29/11,complete as Lump specified Sum 0.00 1.00 1.00 $5,949.00 $5,949.00 10005 Additionalequipment, labor,and materials to remove an unknown buried concrete footing in City Hall parking lot entrance, per Invoice(059),for work performed on 11/7& 11/16/2011,complete as Lump specified Sum 0.00 1.00 1.00 $961.10 $961.10 ADDITIONAL WORK: C.O.#3-(ITEMS 10000-10005)-SUB-TOTAL $6,910.10 $0.00 NET DECREASE TO: SECTION I ($4,871.79) SECTION II-STORM SEWER ITEM DESCRIPTION UNIT BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE 2014 Utility Line Opening, complete as specified Each 2 25.00 23.00 $306.00 $7,038.00 2036 Furnish and Install 12" Storm Sewer,complete as Linear specified Feet 2185 2,250.00 65.00 $40.80 $2,652.00 2038 Furnish and Install 12" RCP Class III Storm Sewer,complete as Linear specified Feet 40 ` 31.50 -8.50 $48.96 ($416.16) 2042 Furnish and Install 15" Storm Sewer, complete as Linear specified Feet 930 889.50 _ -40.50 $45.90 ($1,858.95) 2048 Furnish and Install 18" Storm Sewer,complete as Linear specified Feet 840 833.80 -6.20 $48.96 ($303.55) 2060 Furnish and Install 24" Storm Sewer, complete as Linear specified Feet 880 785.40 - -94.60 $62.22 ($5,886.01) 2066 Furnish and Install 27" Storm Sewer, complete as Linear specified Feet 165 152.90 ^ -12.10 $93.84 ($1,135.46) 2072 Furnish and Install 30" Storm Sewer,complete as Linear specified Feet 420 420.00 _ $95.88 2078 Furnish and Install 36" Storm Sewer,complete as Linear specified Feet 605 594.50 -10.50 $110.16 ($1,156.68) Page 4 of 21 CONTRACT: 11-04 CHANGE ORDER#3 ITEM DESCRIPTION UNIT BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE 2084 Furnish and Install 42" Storm Sewer,complete as Linear specified Feet 70 75.70 5.70 $259.08 $1,476.76 2090 Furnish and Install 48" Storm Sewer,complete as Linear specified Feet 115 43.00 -72.00 $186.66 ($13,439.52) _ 2096 Furnish and Install 54" Storm Sewer,complete as Linear specified Feet 615 586.30 -28.70 $265.20 ($7,611.24) _ 2102 Furnish and Install 60" Storm Sewer, complete as Linear specified Feet 1905 1,815.00 -90.00 $306.00 ($27,540.00) _ 2172 Furnish and Install 3'x6' Box Culvert Storm Sewer, Linear complete as specified Feet 555 328.20 -226.80 $315.18 ($71,482.82) 2188 Furnish and Install 5'x8' Box Culvert Storm Sewer, Linear complete as specified Feet 430 418.30 -11.70 $447.18 ($5,232.01) _ 2189 Furnish and Install 5'x8' Box Culvert Storm Sewer w/clay bedding and backfill and joint ties, Linear complete as specified Feet 80 89.80 9.80 $780.30 $7,646.94 _ 2220 Furnish and Install 3'x6' Box Culvert Storm Sewer w/MH Riser,complete as Linear specified Feet 64 7.00 -57.00 $364.14 ($20,755.98) _ 2236 Furnish and Install 5'x8' Box Culvert Storm Sewer w/MH Riser,complete as Linear specified Feet 8 14.00 6.00 $402.90 $2,417.40 _ 2280 Furnish and Install 6" Storm Lateral,complete as Linear specified Feet 1245 1,541.30 296.30 $35.70 $10,577.91 _ 2282 Furnish and Install 8" Storm Lateral,complete as Linear specified Feet 375 246.40 -128.60 $38.76 ($4,984.54) _ 2284 Furnish and Install Storm Sewer Marker Balls, complete as specified Each 129 137.00 8.00 $21.42 $171.36 _ 2286 Furnish&install clay dams,complete as specified Each 66 67.00 1.00 $102.00 $102.00 _ 2532 Furnish&Install Standard Storm Manhole(4' diameter),complete as Vertical specified Feet 110 123.24 13.24 $246.84 $3,268.16 _ 2534 Furnish&Install Standard Storm Manhole(5' diameter),complete as Vertical specified Feet 56 66.06 10.06 $354.96 $3,570.90 _ 2536 Furnish&Install Standard Storm Manhole(6' diameter),complete as Vertical specified Feet 63 44.88 -18.12 $379.44 ($6,875.45) _ 2550 Furnish&Install Standard Storm Manhole(7'x7'Box), complete as specified Vertical Feet 240 231.96 -8.04 $700.74 ($5,633.95) _ Page 5 of 21 CONTRACT:11-04 CHANGE ORDER#3 ITEM DESCRIPTION UNIT BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE 2556 Furnish&Install Standard Storm Inlet Manhole(4' diameter),complete as Vertical specified Feet 10 4.38 -5.62 $239.70 ($1,347.11) 2580 Furnish and Install Storm Junction Chamber, complete as specified Each 3 3.00 $15,337.74 2584 Furnish&Install Standard Storm Manhole Riser(4' diameter), complete as Vertical specified Feet 5 2.77 -2.23 $261.12 ($582.30) 2590 Furnish&Install Standard Storm Inlet Manhole Riser (4'diameter), complete as specified Vertical Feet 10 0.93 -9.07 $221.34 ($2,007.55) 2612 Furnish and Install Type 1 Inlet,complete as specified Each 6 10.00 4.00 $1,198.50 $4,794.00 2614 Furnish and Install Type 3 Inlet(w/18"Sump), complete as specified Each 102 95.00 -7.00 $1,358.64 ($9,510.48) 2800 Connect to Existing Storm Sewer,complete as specified Each 26 22.00 -4.00 $510.00 ($2,040.00) 2802 Connect to Existing Storm Lateral,complete as specified Each 20 20.00 $71.40 2806 Connect to Existing Manhole,complete as specified Each 2 3.00 1.00 $510.00 $510.00 2808 Connect to Existing Inlet, complete as specified Each 2 1.00 -1.00 $428.40 ($428.40) 2820 Abandon 8"-12"Storm Sewer,complete as Linear specified Feet 1940 1,889.60 -50.40 $2.04 ($102.82) 2822 Abandon 15"&Larger Storm Sewer,complete as Linear specified Feet 4255 4,125.00 -130.00 $7.65 ($994.50) 2824 Abandon Storm MI-I's and Inlets,complete as specified Each 63 63.00 $255.00 2856 Furnish, Install,Maintain and Remove Type D Inlet Protection,complete as specified Each 258 166.00 -92.00 $70.00 ($6,440.00) 2864 Furnish, Install,Maintain and Remove 12"Diameter Sediment Logs, complete Linear as specified Feet 40 40.00 $10.00 2872 Furnish, Install,Maintain and Remove Turbidity Barrier,complete as specified Each 1 2.00 1.00 $3,240.00 $3,240.00 Page 6 of 21 CONTRACT:11-04 CHANGE ORDER#3 ITEM DESCRIPTION UNIT BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE 2948 Furnish and install heavy rip-rap,with filter fabric, Square complete as specified Yard 80 80.00 $50.00 _ SECTION II-(BID ITEMS 2014-2948)-SUB-TOTALS $47,465.43 ($197,765.48) ADDITIONAL WORK REQUIRED: C.O.#3 - SECTION II ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE 2862 Furnish, install, maintain, and remove stone bags per Invoice(003)dated 4/18/11, complete as specified Each 33.00 33.00 $65.05 _ 20000 Additional labor,materials, and equipment to core two 12-inch holes into MH P-10 to match field conditions, per Invoice(002)dated 4/27/11,complete as specified Lump Sum 1.00 1.00 $1,192.64 _ 20001 Additional labor,materials, and equipment to remove a poured in place concrete structure and repair the existing storm sewer manhole on Osceola,per Invoice(006)dated 5/9/11, Lump complete as specified Sum 1.00 1.00 $1,989.50 _ 20002 Additional labor,materials, and equipment to excavate and re-connect to an existing storm lateral. Upon further investigation, it was determined that the lateral was never installed and the hole was backfilled with gravel,per Invoice (008)dated 5/9111, complete as specified Lump Sum 1.00 1.00 $2,155.35 _ 20003 Additional labor, materials, and equipment to re-install two storm inlets that were staked incorrectly, per Invoice(012)dated 5/24/11,complete as Lump specified Sum 1.00 1.00 $1,925.57 _ 20004 Additional labor,materials, and equipment to remove an unknown buried concrete foundation and • storm sewer on Osceola Street, per Invoice(014) dated 6/21/11, complete as specified Lump Sum 1.00 1.00 $1,962.36 _ Page 7 of 21 CONTRACT:11-04 CHANGE ORDER#3 ITEM DESCRIPTION UNIT BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE 20005 Additional labor,materials, and equipment to temporarily connect to existing 42-inch storm sewer,after the storm sewer installation was put on hold due to UW- Oshkosh fiber conflict,per Invoice(015)dated 6/21/11, complete as Lump specified Sum 1.00 1.00 $3,702.02 20006 Additional labor,materials, and equipment to raise the proposed 3'x6'box culvert over the UW-Oshkosh steam tunnel that was in conflict,per Invoice(019) dated 6/21/11, complete as specified Lump Sum 1.00 1.00 $5,564.85 20007 Additional labor,materials, and equipment to install 48- inch storm sewer and inlets on Osceola Street that were in conflict with the UW-Oshkosh fiber duct package. Osceola was ultimately narrowed to allow inlets to be installed, per Invoice(020)dated 6/21/11,complete as Lump specified Sum 1.00 1.00 $6,684.38 20008 Additional labor,materials, and equipment to permanently connect the 3' x 6'box culvert to the existing storm sewer after the storm sewer box culvert was eliminated from the contract between station 17+25 and 20+00, per Invoice(022)dated 6/28/11,complete as Lump specified Sum 1.00 1.00 $3,292.06 20009 Additional labor, materials, and equipment to remove 8-inches of mud from the storm sewer due to the water main break and repair the storm sewer, per Invoice(032)dated 7/15/11, complete as Lump specified Sum 1.00 1.00 $1,614.49 Page 8of21 CONTRACT:11-04 CHANGE ORDER#3 ITEM DESCRIPTION UNIT BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE 20010 Additional labor,materials, and equipment to install a storm lateral that was not in the correct location according to the plan. Contractor had to re- excavate in new location and backfill original location, per Invoice(034) dated 7/19/11,complete as specified Lump Sum 1.00 1.00 $820.20 20011 Additional labor,materials, and equipment to connect the UW-Oshkosh Wellness Center storm lateral to the 3'x6'box culvert. UW-O • told us that the lateral was connected to an inlet outside the building but it was determined it was connected to the abandoned storm sewer main. Contractor had to re- mobilize to that area, excavate,de-water,and re- slurry the abandond storm sewer, per Invoice(036) dated 7/29/11,complete as specified Lump Sum 1.00 1.00 $5,380.90 20012 Additional equipment, labor,and materials to re- core a 14"hole into MH E- 66 due to telephone conduit conflict,per Invoice (038)for work performed on 7/8/11,complete as Lump specified Sum 1.00 1.00 $1,656.39 20013 Additional equipment, labor,and materials to reset an inlet to match field conditions,per Invoice (041),for work performed on 8/12/11,complete as Lump specified Sum 1.00 1.00 $600.00 20014 Additional equipment, labor,and materials to core new holes into MH and inlet due to field design changes,per Invoice(042),work performed on 8/10/11, Lump compelte as specified Sum 1.00 1.00 $822.83 20015 Additional equipment, labor,and materials to core hole into MH E-45 to match field conditions,per Invoice(046),for work performed on 8/12/11, Lump complete as specified Sum 1.00 1.00 $167.90 Page 9 of 21 CONTRACT: 11-04 CHANGE ORDER#3 ITEM DESCRIPTION UNIT BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE 20016 Additional equipment, labor,and materials to remove an old storm sewer stone tunnel in the intersection of Church Avenue and Division Street,per Invoice(049), for work performed on 8/29/11,complete as Lump specified Sum 1.00 1.00 $1,308.42 20017 Additional mobilization charge to install an 8" storm lateral at 917 Elmwood,per Invoice (051),for work performed on 9/8/11,complete as Lump specified Sum 1.00 1.00 $287.50 20018 Additional equipment, labor, and materials to excavate for further investigation of stone storm tunnel on Division • Street,per Invoice(053), for work performed on 9/14/11, complete as Lump specified Sum 1.00 1.00 $822.83 20019 Additional equipment, labor, and materials to cut a hole into MH C-20 to match field conditions, per Invoice(054),for work performed on 9/22/11, Lump complete as specified Sum 1.00 1.00 $1,156.33 20020 Construction crew downtime waiting for decision on hazardous material on Osceola Street, per Invoice(056), for work on 5/2/11, Lump complete as specified Sum 0.00 1.00 1.00 $1,193.70 $1,193.70 20021 Pay for the materials only of the 3'x 6'box culvert and 5'X 8'box culvert sections that were not used during construction due to field modifications, and delivered to the Street Department Yard, per Dorner invoice dated 8/19/11,complete as Lump specified Sum 0.00 1.00 1.00 $3,702.86 $3,702.86 Page 10 of 21 CONTRACT: 11-04 CHANGE ORDER#3 ITEM DESCRIPTION UNIT BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE 20022 Pay for materials only of 2 inlets riser sections that were eliminated from the project and delivered to the Street Department Yard, per Dorner Invoice dated 9/3/11, complete as Lump specified Sum 0.00 1.00 1.00 $534.90 $534.90 ADDITIONAL WORK:C.O.#3 -(ITEMS 2862&20000-20022)-SUB-TOTAL $5,431.46 $0.00 NET DECREASE TO: SECTION II ($144,868.59) SECTION III-SANITARY SEWER ITEM DESCRIPTION UNIT BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRA CT PRICE 3000 Furnish&install 8-inch sanitary sewer relay, Linear complete as specified Feet 3255 3,327.20 72.20 $81.60 $5,891.52 _ 3002 Furnish&install 10-inch sanitary sewer relay, Linear complete as specified Feet 3075 2,969.00 -106.00 $178.50 ($18,921.00) 3004 Furnish&install 12-inch sanitary sewer relay, Linear complete as specified Feet 55 15.00 -40.00 $342.72 ($13,708.80) 3015 Furnish&install 33-inch sanitary sewer relay, Linear complete as specified Feet 15 0.00 -15.00 $1,024.08 ($15,361.20) 3016 Furnish&install 36-inch sanitary sewer relay, Linear complete as specified Feet 5 5.00 $1,036.32 _ 3060 Furnish&install 8-inch sanitary sewer drop, Vertical complete as specified Feet 28 28.93 0.93 $295.80 $275.09 _ 3062 Furnish&install 10-inch sanitary sewer drop, Vertical complete as specified Feet 26 29.96 3.96 $319.26 $1,264.27 _ 3100 Furnish&install standard sanitary manhole(4' diameter),complete as Vertical specified Feet 461 491.90 30.90 $183.60 $5,673.24 3102 Furnish&install standard sanitary manhole(5' diameter), complete as Vertical specified Feet 28 26.34 _ -1.66 $358.02 ($594.31) _ 3114 Furnish&install external manhole chimney seal, complete as specified Each 33 34.00 1.00 $700.00 $700.00 _ 3210 Furnish&install 8"x 6" factory wyes or tees, complete as.specified Each 44 36.00 -8.00 $67.32, ($538.56) _ 3212 Furnish&install 10"x 6" factory wyes or tees, complete as specified Each 17 16.00 -1.00 $123.42 ($123.42) _ 3234 Furnish&install 4"/6" sanitary lateral relay, Linear complete as specified Feet 1512 1,441.90 _ -70.10 $84.66 ($5,934.67) _ Page 11 of 21 CONTRACT: 11-04 CHANGE ORDER#3 ITEM DESCRIPTION UNIT BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE 3236 Furnish &install sanitary lateral marker balls, complete as specified Each 122 106.00 -16.00 $21.42 _ ($342.72) 3238 Furnish&install clay darns,complete as specified Each 61 50.00 -11.00 $102.00 ($1,122.00) 3300 Furnish&install connections to existing 8" mains,complete as specified Each 10 8.00 -2.00 $446.76 ($893.52) 3302 Furnish&install connections to existing 10" mains,complete as specified Each 2 3.00 1.00 $428.40 $428.40 3304 Furnish&install connections to existing 12" mains,complete as specified Each 2 1.00 -1.00 $428.40 ($428.40) 3315 Furnish&install connections to existing 33" mains,complete as specified Each 1 0.00 -1.00 $856.80 ($856.80) 3316 Furnish&install connections to existing 36" mains,complete as specified Each 1 1.00 $856.80 3330 Furnish&install concrete collars,complete as specified Each 2 3.00 1.00 $535.50 $535.50 3406 Furnish&install 12"open cut casing pipes,complete Linear as specified Feet 12 9.00 -3.00 $138.72 ($416.16) 3408 Furnish&install 16"open cut casing pipes,complete Linear as specified Feet 12 66.50 54.50 $149.94 $8,171.73 3700 Televise sanitary sewer, Linear complete as specified Feet 6205 6,301.20 96.20 $0.92 $88.50 3800 Abandon sanitary manholes, complete as specified Each 8 9.00 1.00 $510.00 $510.00 3802 Abandon 8-inch sanitary sewer,complete as Linear specified Feet 475 769.00 294.00 $2.04 $599.76 3804 Abandon 10-inch sanitary sewer,complete as Linear specified Feet 440 440.00 $2.04 3806 Abandon 12-inch sanitary sewer,complete as Linear specified Feet 1320 1,320.00 $2.04 3808 Abandon 15-inch sanitary sewer,complete as Linear specified Feet 215 215.00 $5.61 3810 Abandon 18-inch sanitary sewer,complete as Linear specified Feet 735 735.00 $6.63 3812 Abandon 21-inch sanitary sewer,complete as Linear specified Feet 350 350.00 $7.65 3814 Abandon 24-inch sanitary sewer,complete as Linear specified Feet 340 340.00 $10.20 Page 12 of 21 CONTRACT: 11-04 CHANGE ORDER#3 ITEM DESCRIPTION UNIT BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE 3818 Abandon 36-inch sanitary sewer,complete as Linear specified Feet 165 165.00 $25.50 SECTION III-(BID ITEMS 3000-3018)-SUB-TOTALS $24,138.01 ($59,241.56) ADDITIONAL WORK REQUIRED: C.O.#3-SECTION III ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE 3815 Abandon 27-inch sanitary sewer,complete as Linear specified Feet 238.00 238.00 $13.00 _ 30000 Additional labor,materials, and equipment to move and rebuild MH 0-1,due to existing 33-inch sanitary sewer being encased in concrete,per Invoice(001) dated 4/27/11, complete as specified Lump Sum 1.00 1.00 $9,260.88 _ 30001 Additional labor,materials, and equipment to core new hole into MH 0-2 to match field conditions,and cap new lateral that was shown on plans,but was abandoned,per Invoice (005)dated 5/2/11, complete as specified Lump Sum 1.00 1.00 $1,227.07 _ 30002 Additional labor,materials, and equipment to remove concrete encased manhole in front of Blackhawk Commons,per Invoice (007)dated 5/9/11, complete as specified Lump Sum 1.00 1.00 $5,725.85 _ 30003 Additional labor,materials, and equipment to break up and dispose of concrete encased sanitary/storm manhole structure that was excavated on 5/5/11,per Invoice(010)dated 5/25/11,complete as Lump specified Sum 1.00 1.00 $1,143.68 _ 30004 Additional labor,materials, and equipment to remove a poured in place sanitary manhole on Algoma Avenue,per Invoice(024) dated 6/28/11,complete as Lump specified Sum 1.00 1.00 $7,151.85 Page 13 of 21 CONTRACT:11-04 CHANGE ORDER#3 ITEM DESCRIPTION UNIT BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE 30005 Construction crew down time due to Gabe's Construction air- hammering the concrete off AT&T's duct package on Elmwood Avenue. Sewer crew could not install sanitary or storm until Gabe's was complete with their work,per Invoice (027)dated 6/28/11, Lump complete as specified Sum 1.00 1.00 $3,172.71 30006 Additional labor,materials, and equipment to use a concrete buster to remove encased concrete around sanitary sewer manhole to gain access,per Invoice (028)dated 6/28/22, Lump complete as specified Sum 1.00 1.00 $359.95 30007 Additional equipment, labor,and materials for Rock Excavation,per Invoice(037)for work performed 7/5/11, Cubic complete as specified Yards 1.00 1.00 $100.00 30008 Additional equipment, labor,and materials to re- excavate to main to install a 10"X8"tee to match field conditions of lateral, per Invoice(039)for work performed on 8/1/11, complete as specified Lump Sum 1.00 1.00 $1,344.63 30009 Additional equipment, labor,and materials to re- excavate the lateral for Harrington Hall and relay with an 8"to match field conditions, per Invoice (040)for work performed on 8/2/11,complete as Lump specified Sum 1.00 1.00 $6,184.71 30010 Additional equipment, labor,and materials to cut- in a 8"x6"wye into main for lateral for 942 Elmwood, which was not shown in planset due to section of main not being televised and no record of lateral, per Invoice(043)for work performed on 8/10/11, complete as specified Lump Sum 1.00 1.00 $3,838.96 Page 14 of 21 CONTRACT:11-04 CHANGE ORDER#3 ITEM DESCRIPTION UNIT BID INSTA!I Fn NET NET UNIT INCREASE IN DECREASE IN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE 30011 Additional equipment, labor, and materials to remove an old sanitary main 2 feet below the proposed main and repalce with stone backfill, per Invoice(044),for work performed on 8/11/11, Lump complete as specified Sum 1.00 1.00 $7,264.53 30012 Pay for materials only of sanitary MH 0-4 which was eliminated from project,due to field modifications,manhole was delivered to Street Department Yard, per Dorner Invoice dated 8/29/11,complete as Lump specified . Sum 0.00 _ 1.00 1.00 $465.52 $465.52 ADDITIONAL WORK: C.O.#3-(ITEMS 3815&30000-30012)-SUB-TOTAL $465.52 $0.00 NET DECREASE TO: SECTION III ($34,638.03) SECTION IV-WATER MAIN ITEM DESCRIPTION UNIT BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE - 4000 Furnish&install 4-inch ductile iron watermain w/poly wrap relay, Linear complete as specified Feet 170 138.70 -31.30 $122.40 ($3,831.12) 4002 Furnish&install 6-inch ductile iron watermain w/poly wrap relay, Linear complete as specified Feet 750 801.30 51.30 $91.80 $4,709.34 4004 Furnish&install 8-inch ductile iron watermain w/poly wrap relay, Linear complete as specified Feet 2250 2,289.70 39.70 $76.50 $3,037.05 4006 Furnish&install 10-inch ductile iron watermain w/poly wrap relay, Linear complete as specified Feet 100 57.00 -43.00 $128.52 ($5,526.36) _ 4008 Furnish&install 12-inch ductile iron watermain w/poly wrap relay, Linear complete as specified Feet 4575 4,552.60 -22.40 $88.74 ($1,987.78) 4036 Furnish&install 1-inch water service relay, Linear complete as specified Feet 1625 1,583.00 -42.00 $40.80 ($1,713.60) 4038 Furnish&install 1-1/2-inch water service relay, Linear complete as specified Feet 40 9.00 -31.00 $51.00 ($1,581.00) 4040 Furnish&install 2-inch water service relay, Linear complete as specified Feet 100 20.00 -80.00 $56.10 ($4,488.00) 4048 Furnish&install 1-inch - corporation and stop box, complete as specified Each 46 43.00 -3.00 $159.12 ($477.36) _ Page 15 of 21 ' CONTRACT: 11-04 CHANGE ORDER#3 ITEM DESCRIPTION UNIT BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE 4050 Furnish&install 1-1/2 inch corporation and stop box, complete as specified Each 2 1.00 -1.00 $441.66 ($441.66) 4052 Furnish&install 2-inch corporation and stop box, complete as specified Each 3 1.00 -2.00 $586.50 ($1,173.00) 4054 Furnish&install Water service clay dams, complete as specified Each 51 45.00 -6.00 $102.00 ($612.00) 4056 Furnish&install connections to existing 4"watermain,complete as specified Each 8 4.00 -4.00 $428.40 ($1,713.60) 4058 Furnish&install connections to existing 6"watermain,complete as specified Each 15 21.00 6.00 $428.40 $2,570.40 4060 Furnish&install connections to existing 8"watermain,complete as specified Each 8 7.00 • -1.00 $428.40 ($428.40) 4062 Furnish&install connections to existing 10"watermain,complete as specified Each 1 1.00 $642.60 4064 Furnish&install connections to existing 12"watermain, complete as specified Each 2 2.00 $642.60 4109 Furnish&install 8"X 4" tee, complete as specified Each 2 1.00 -1.00 $280.50 ($280.50) 4110 Furnish&install 8"X 6" tee,complete as specified Each 14 12.00 -2.00 $350.88 ($701.76) 4111 Furnish&install 8"X 8" tee, complete as specified Each 1 3.00 2.00 $372.30 $744.60 4119 Furnish&install 10"X 6" tee, complete as specified Each 1 1.00 $445.74 4127 Furnish&install 12"X 4" tee, complete as specified Each 3 1.00 -2.00 $412.08 ($824.16) 4128 Furnish&install 12"X 6" tee,complete as specified Each 17 18.00 1.00 $521.22 $521.22 4129 Furnish&install 12"X 8" tee, complete as specified Each 1 10.00 9.00 $530.40 $4,773.60 4131 Furnish&install 12"X 12" tee,complete as specified Each 5 5.00 $672.18 4189 Furnish&install 8"X 8" cross,complete as specified Each 1 1.00 $355.98 4197 Furnish&install 10"X 12" cross, complete as specified Each 1 1.00 $746.64 Page 16 of 21 CONTRACT: 11-04 CHANGE ORDER#3 ITEM DESCRIPTION UNIT BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE 4227 Furnish&install 6-inch 22- 1/2 degree bend,complete as specified Each 1 1.00 $188.70 4228 Furnish&install 8-inch 22- 1/2 degree bend,complete as specified Each 4 9.00 5.00 $266.22 $1,331.10 4230 Furnish&install 12-inch 22• 1/2 degree bend,complete as specified Each 1 2.00 1.00 $489.60 $489.60 4235 Furnish&install 4-inch 45 degree bend,complete as specified Each 12 18.00 6.00 $146.88 $881.28 4236 Furnish&install 6-inch 45 • degree bend,complete as specified Each 26 88.00 62.00 $196.86 $12,205.32 4237 Furnish&install 8-inch 45 degree bend,complete as specified Each 18 30.00 12.00 $268.26 $3,219.12 4238 Furnish&install 10-inch 45 degree bend,complete as specified Each 2 2.00 $379.44 4239 Furnish&install 12-inch 45 degree bend,complete as specified Each 12 25.00 13.00 $521.22 $6,775.86 4255 Furnish&install 8-inch cap, complete as specified Each 2 3.00 1.00 $229.50 $229.50 4257 Furnish&install 12-inch cap,complete as specified Each 1 2.00 1.00. $262.14 $262.14 4263- Furnish&install 8"X 4" reducer, complete as specified Each 2 4.00 2.00 $218.28 $436.56 4264 Furnish&install 8"X 6" reducer,complete as specified Each 3 5.00 2.00 $233.58 $467.16 4267 Furnish&install 10"X 8" reducer, complete as specified Each 1 0.00 -1.00 $299.88 ($299.88) 4268 Furnish&install 12"X 4" _ reducer,complete as specified Each 1 1.00 $330.48 4269 Furnish&install 12"X 6" reducer, complete as specified Each 1 1.00 $347.82 4270 Furnish&install 12"X 8" reducer,complete as specified Each 1 1.00 $363.12 4287 Furnish&install 20"X 12" reducer,complete as specified Each 1 0.00 -1.00 $1,238.28 ($1,238.28) 4400 Furnish&install 4-inch gate valve,complete as specified Each 5 2.00 -3.00 $859.86 ($2,579.58) 4401 Furnish&install 6-inch gate valve, complete as specified Each 31 34.00 3.00 $1,010.82 $3,032.46 4402 Furnish&install 8-inch gate valve,complete as specified Each 18 21.00 3.00 $1,353.54 $4,060.62 Page 17 of 21 CONTRACT: 11-04 CHANGE ORDER#3 ITEM DESCRIPTION UNIT BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE 4403 Furnish&install 10-inch gate valve,complete as specified Each 2 _ 2.00 $1,920.66 4404 Furnish&install 12-inch gate valve,complete as specified Each 22 29.00 7.00 $2,343.96 $16,407.72 4419 Furnish&install 6"X 6" tapping valve&sleeve, complete as specified Each 1 1.00 $2,629.56 4500 Furnish&install hydrant, complete as specified Each 19 18.00 _ -1.00 $3,053.88 ($3,053.88) 4502 Furnish&install hydrant gradelok,complete as specified Each 19 0.00 -19.00 $367.20 ($6,976.80) 4718 Furnish &install 8-inch steel casing pipe, Linear complete as specified , Feet 20 0.00 -20.00 $76.50 ($1,530.00) 4722 Furnish&install 12-inch steel casing pipe, Linear complete as specified Feet 40 16.00 -24.00 $98.94 ($2,374.56) 4724 Furnish&install 16-inch steel casing pipe, Linear complete as specified Feet 40 40.00 $110.16 4730 Furnish&install 24-inch steel casing pipe, Linear complete as specified Feet 40 0.00 -40.00 $133.62 ($5,344.80) 4900 Abandon watermain on Osceola Street,complete Lump as specified Sum 1 1.00 $2,346.00 4902 Abandon watermain on Algoma Boulevard, Lump complete as specified Sum 1 _ 1.00 _ $612.00 4904 Abandon watermain on Elmwood Avenue Lump complete as specified Sum 1 _ 1.00 $6,222.00 4906 Abandon watermain on John Avenue,complete as Lump specified Sum 1 1.00 $1,203.60 4908 Abandon watermain on Church Street,complete Lump as specified Sum 1 1.00 $2,448.00 SECTION IV-(BID ITEMS 4000-4908)-SUB-TOTALS $66,154.65 ($49,178.08) ADDITIONAL WORK REQUIRED: C.O.#3-SECTION IV ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE 4101 Furnish and install 6"x 6" tee,complete as specified Each 0.00 1.00 1.00 $325.00 $325.00 4188 Furnish and install 8"x 6" cross,complete as specified Each 0.00 1.00 1.00 $520.00 $520.00 4266 Furnish and install 10"x 6" reducer,complete as specified Each 0.00 1.00 1.00 $274.00 $274.00 4298 Furnish and install 4" sleeve,complete as specified Each 0.00 1.00 1.00 $165.00 $165.00 Page 18 of 21 • CONTRACT:11-04 CHANGE ORDER#3 • ITEM DESCRIPTION UNIT BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE 4299 Furnsih and install 6" sleeve,complete as specified Each 0.00 2.00 2.00 $215.00 $430.00 4300 Furnish and install 8" sleeve,complete as specified Each 0.00 3.00 3.00 $285.00 $855.00 4302 Furnish and install 12" sleeve, complete as specified Each 0.00 4.00 4.00 $535.00 $2,140.00 4728 .Furnish and install 20" casing pipe, complete as Linear specified Foot 0.00 20.00 20.00 $120.00 $2,400.00 40000 Additional labor,materials, and equipment to move and install new 12-inch water main to match the field conditions and avoid conflicts with the proposed sanitary and storm sewer and the existing 20-inch watermain, per Invoice (011)dated 5/24111, Lump complete as specified Sum 1.00 1.00 $11,588.81 40001 Additional cost for installing Megalugs on all bends and fittings,per Involve(013)dated 6/21/11, complete as Lump specified Sum 1.00 1.00 $17,914.70 40002 Additional labor,materials, and equipment to remove fittings for tee and valve on Elmwood Avenue at Woodland Avenue,once it was determined that there was a conflict with re- routed sanitary sewer,per Invoice(016)dated 6/21/11,complete as specified Lump Sum 1.00 1.00 $1,247.18 40003 Additional labor,materials, and equipment to offset proposed water main on Elmwood Avneue at Woodland Avenue over the exisitng storm that was in conflict,per Invoice (017)dated 6/21/11, complete as specified Lump Sum 1.00 1.00 $1,870.76 40004 Additional labor, materials, and equipment to offset proposed water main on Elmwood Avenue at Vine Avenue under the existing storm sewer that was in conflict,per Invoice(017) dated 6/21/11,complete as specified Lump Sum 1.00 1.00 $1,364.91 Page 19 of 21 CONTRACT: 11-04 CHANGE ORDER#3 ITEM DESCRIPTION UNIT BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE 40005 Additional labor,materials, and equipment to re-install watermain that was in conflict with the UW- Oshkosh fiber duct package on Elmwood Avenue between Amherst Avenue and Irving Avenue, • per Invoice(023)dated 6/28/11,complete as specified Lump Sum 1.00 1.00 $7,133.81 40006 Additional labor,materials, and equipment to install a temporary water service to the UW-Oshkosh Diversity Center. Contractor was told that the existing water service was tapped off the 6-inch fire protection lateral and 4-inch water lateral was abandoned. It was determined that the 2-inch service was connected to the 4-inch lateral,per Invoice(025)dated 6/28/11,complete as Lump specified Sum 1.00 1.00 $1,289.87 40007 Additional labor,materials, and equipment to repair a watermain that was improperly marked by the utility locator,per Invoice (031)dated 7/15/11, Lump complete as specified Sum 1.00 1.00 $619.67 40008 Additional labor, materials, and equipment to repair a unmarked watermain on Irving Avenue,per Invoice (026),dated 6/28/11, Lump complete as specified Sum 1.00 1.00 $739.63 40009 Additional labor,materials, and equipment to repair a watermain leak on Elmwood Avenue,per Invoice(033),dated 7/19/11, complete as Lump specified Sum 1.00 1.00 $1,364.73 40010 Additional work, labor,and materials to locate a water service which was 33'off of original locates,per Invoice(045),for work performed on 8/12/11, Lump complete as specified Sum 1.00 1.00 $1,097.10 Page 20 of 21 CONTRACT:11-04 CHANGE ORDER#3 ITEM DESCRIPTION UNIT BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE 40011 Additional equipment, labor, and materials to install the 8"water main underneath the 20" concrete water main,due to elevation conflict,per Invoice(050),for work performed on 8/29/11, Lump complete as specified Sum 1.00 1.00 $1,704.16 40012 Additional equipment, labor,and materials for downtime waiting for Water Department to shut down main so they could connect water service for the Bed and Breakfast on Church Avenue, per Invoice(052),for work performed on 9/9/11, Lump complete as specified Sum 1.00 1.00 $935.53 40013 Additional equipment, labor,and materials to cap off existing water main on Church Avenue per Water Department request,per Invoice(055),for work performed on 10/7/11, Lump complete as specified Sum _ 0.00 1.00 1.00 $1,476.60 $1,476.60 ADDITIONAL WORK: C.O.#3 (ITEMS 4101-4728&40000-40012)-SUB-TOTAL $8,585.60 $0.00 NET INCREASE TO: SECTION IV $25,562.17 ITEM DESCRIPTION UNIT BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE ALTERNATE B 500 Credit itme for approx. 10,000 tons of salvage, crushed concrete base course supplied by the City. Credit paid to the City per ton Tons -10,000.00 -6,960.00 3,040.00 $1.90 $5,776.00 ALTERNATE B-Item 500(credit)-SUB-TOTALS $5,776.00 NET INCREASE TO SECTIONS I,II,III, IV $340,448.16 NET DECREASE TO SECTIONS I,II,Ill, IV ($499,264.40) NET DECREASE TO CREDIT-ALTERNATE B $5,776.00 NET DECREASE TO CONTRACT: ($153,040.24) Page 21 of 21