Loading...
HomeMy WebLinkAbout2012-Plumbing (cross connection) (a) CITY OF OSHKOSH No 152042 OSHKOSH PLUMBING PERMIT -APPLICATION AND RECORD ON THE WATER Job Address 110 PEARL AVE Contractor D.R. HANSEN PLBG. Owner CITY OF OSHKOSH Create Date 08/30/2012 _ Category 442-Commercial-Interior(New/Relocated Fixti Plan Inspector Rich Wood Bathtub Clothes Wshr Classrm Sink Shower Surgeons Sink Roof Drain Lndry Tray Exam Sink Deduct Meters Whirlpool Sterilizer Soda Disp Wtr Sewer Mtrs Sump Pump F Prep Sink RPZ Valve Lavatory San Sump/Pump FIrIWst Sink Coffee Maker Misc. Usage Mtrs Toilet Bidet M Site Drain Misc. Water Softner Hand Sink Kit Sink Urinal Wait.St. Fixtures Urinal Rec Lab Sink Dis osal Beer Tap Ice Chest p Gar Drain Plaster Sink Dishwasher DIP Well Comm Ice Maker Local Waste Sculry Sink Drink Ftn Floor Drain Bar Sink -- Int Grease Trap Sery Sink Wash Ftn Ext Grease Trap Hose Bibb Breakrm Sink Sham Sink p Catch Basin Eye Wash Statn Water Heater Use/Nature Cross connection correction on orders by Hydro Design. City owned building waived fees. of Work Size Material Sanitary Sewer Type # Conn.Type Storm Sewer Water Service Parcel Id# Valuation $100.00 Plan Approval $0.00 0100830000 Permit Fees $0.00 ❑ Permit Voided Issued By Date 08/30/2012 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party,if you perform the work described in this permit application within an easement,the City strongly urges the permit applicant to contact the easement holder(s)and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address 55 KNAPP ST OSHKOSH WI 54902 -3448 Telephone Number 233-1595 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number,Type of Inspection(i.e. Footing,Service, Final, etc.),Access into Building if Secure(how do we gain entry),your Name and Phone Number. Unless specified otherwise,we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.