Loading...
HomeMy WebLinkAbout0152064 - Building (fence) g) CITY OF OSHKOSH No 152064 OSHKOSH BUILDING PERMIT -APPLICATION AND RECORD ON THE WATER Job Address 1331 WAUGOO AVE Owner JOANN J FORBES Create Date 07/03/2012 Designer Contractor VIENOLA BROS CONSTRUCTION INC Inspector Category 251 -Fences Plan Type 0 Building 0 Sign O Canopy • Fence 0 Raze 1 Zoning R-2 Class of Const: Size Unfinished/Basement Sq.Ft. Rooms Height Ft. ❑ Projection Finished/Living Sq.Ft. Bedrooms Stories _ Canopies Garage Sq.Ft. Baths _ Signs Foundation O Poured Concrete 0 Floating Slab O Pier O Other O Concrete Block • Post 0 Treated Wood Occupancy Permit Occupancy Fee $0.00 Flood Plain Height Permit Park Dedication #Dwelling Units 0 #Structures 0 Use/Nature SFR/6'high vinyl fence*to enclose the side and rear yards installed at the property lines. of Work HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $1,000.00 Plan Approval $0.00 Permit Fee Paid $25.00 Park Dedication $0.00 Issued By:5)(1)1.,3 Date 08/30/2012 Final/O.P. 00/00/0000 ❑ Permit Voided I Parcel Id#0205460000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkos• •- o authority t• - orce asement restrictions of which it is not a party,if you perform the work described in this pe • it applicatio, with'• an easement, he City str• gly urges the permit applicant to contact the easement holder(s)and to s cure any neces.- approvalsrbefo - startin• uch activity. I have read and nderstand the ,; r mentione• • or 1- p Signature -" p"`. � Date ge Agent/Owner Address PO BOX 3306 OSHKOSH WI 54903 - 3306 Telephone Number (920)303-0934 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number,Type of Inspection(i.e. Footing,Service, Final,etc.),Access into Building if Secure(how do we gain entry),your Name and Phone Number. Unless specified otherwise,we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.